Home > NRC Library > ADAMS Public Documents
Korea Hydro and Nuclear Power Co., Ltd - Submittal of Revised Technical Reports for APR1400.
Accession Number: ML17094A129
Date Released: Wednesday, April 12, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17094A158 - Korea Hydro and Nuclear Power Co., Ltd - Submittal of Revised Technical Reports for APR1400. (91 page(s), 3/17/2017)
- ML17094A142 - APR1400-Z-M-NR-14009-NP, Rev. 1, "Comprehensive Vibration Assessment Program for the Reactor Vessel Internals". (141 page(s), 2/28/2017)
- ML17094A154 - APR1400-E-S-NR-14001-NP, Rev. 1, "Seismic Design Bases". (211 page(s), 2/28/2017)
- ML17094A157 - APR1400-E-S-NR-14002-NP, Rev. 1, "Finite Element Seismic Models for SSI Analyses of the NI Buildings". (153 page(s), 2/28/2017)
- ML17094A115 - APR1400-E-S-NR-14003-NP, Rev.1, "SSI Analysis Methodology and Results of NI Buildings". (466 page(s), 2/28/2017)
- ML17094A116 - APR1400-E-S-NR-14004-NP, Rev. 2, Evaluation of Effects of HRHF Response Spectra on SSCs". (184 page(s), 2/28/2017)
- ML17094A117 - APR1400-E-S-NR-14005-NP, Rev. 1, "Evaluation of Structure-Soil-Structure Interaction(SSSI) Effects". (194 page(s), 2/28/2017)
- ML17094A118 - APR1400-E-S-NR-14006-NP, Rev. 2, "Stability Check for NI Common Basemat". (102 page(s), 2/28/2017)
- ML17094A119 - APR1400-E-X-NR-14001-NP, Rev. 1, "Equipment Qualification Program". (212 page(s), 2/28/2017)
- ML17094A120 - APR1400-Z-M-NR-14010-NP, Rev. 1, "Structural Analysis of Fuel Assemblies for Seismic and Loss of Coolant Accident Loading". (150 page(s), 2/28/2017)
- ML17094A121 - APR1400-Z-A-NR-14015-NP, Rev. 1, "Neutron Fluence Calculation Methodology for Reactor Vessel". (36 page(s), 2/28/2017)
- ML17094A122 - APR1400-E-N-NR-14001-NP, Rev. 1, "Design Features to Address GSI-191". (330 page(s), 3/31/2017)
- ML17094A123 - APR1400-K-A-NR-14001-NP, Rev. 2, "In-vessel Downstream Effect Tests for the APR1400". (47 page(s), 2/28/2017)
- ML17094A124 - APR1400-E-N-NR-14002-NP, Rev. 1, "IRWST Sump Strainer and Trash Rack Structural Analysis". (61 page(s), 2/28/2017)
- ML17094A125 - APR1400-Z-J-NR-14002-NP, Rev. 1, "Diversity and Defense-in-Depth". (75 page(s), 2/28/2017)
- ML17094A126 - APR1400-Z-J-NR-14003-NP, Rev. 1, "Software Program Manual". (133 page(s), 2/28/2017)
- ML17094A127 - APR1400-Z-J-NR-14004-NP, Rev. 1, "Uncertainty Methodology and Application for Instrumentation". (37 page(s), 2/28/2017)
- ML17094A128 - APR1400-Z-J-NR-14005-NP, Rev. 1, "Setpoint Methodology for Plant Protection System". (100 page(s), 2/28/2017)
- ML17094A130 - APR1400-Z-A-NR-14019-NP, Rev. 1, "CCF Coping Analysis". (119 page(s), 2/28/2017)
- ML17094A131 - APR1400-E-J-NR-14001-NP, Rev. 1, "Component Interface Module". (48 page(s), 3/31/2017)
- ML17094A132 - APR1400-F-C-NR-14002-NP, Rev.1, "Functional Design Requirements for a Core Operating Limit Supervisory System for APR1400." (270 page(s), 2/28/2017)
- ML17094A133 - APR1400-Z-J-NR-14012-NP, Rev.1, "Control System CCF Analysis." (148 page(s), 2/28/2017)
- ML17094A134 - APR1400-Z-J-NR-14013-NP, Rev. 1, "Response Time Analysis of Safety I&C System." (119 page(s), 2/28/2017)
- ML17094A135 - APR1400-F-C-NR-14001-NP, Rev. 1, "CPC Setpoint Analysis Methodology for APR1400." (43 page(s), 2/28/2017)
- ML17094A137 - APR1400-E-E-NR-14001-NP, Rev. 2, "Onsite AC Power System Analysis." (48 page(s), 3/31/2017)
- ML17094A138 - APR1400-Z-A-NR-14011-NP, Rev. 1, "Criticality Analysis of New and Spent Fuel Storage Racks." (125 page(s), 2/28/2017)
- ML17094A139 - APR1400-Z-A-NR-14006-NP, Rev. 1, "Non-LOCA Safety Analysis Methodology." (114 page(s), 2/28/2017)
- ML17094A140 - APR1400-E-I-NR-14003-NP, Rev. 1, "Functional Requirements Analysis and Function Allocation Implementation Plan." (54 page(s), 3/31/2017)
- ML17094A141 - APR1400-E-I-NR-14001-NP, Rev. 1, "Human Factors Engineering Program Plan." (53 page(s), 3/31/2017)
- ML17094A144 - APR1400-E-I-NR-14002-NP, Rev. 1, "Operating Experience Review Implementation Plan." (34 page(s), 3/31/2017)
- ML17094A145 - APR1400-E-I-NR-14012-NP, Rev. 1, "Style Guide." (242 page(s), 3/31/2017)
- ML17094A146 - APR1400-E-I-NR-14004-NP, Rev. 1, "Task Analysis Implementation Plan." (53 page(s), 3/31/2017)
- ML17094A147 - APR1400-E-I-NR-14007-NP, Rev. 1, "Human-System Interface Design Implementation Plan." (84 page(s), 3/31/2017)
- ML17094A148 - APR1400-E-I-NR-14011-NP, Rev. 1, 'Basic Human-System Interface." (111 page(s), 3/31/2017)
- ML17094A149 - APR1400-E-I-NR-14008-NP, Rev. 1, "Human Factors Verification and Validation Implementation Plan." (102 page(s), 3/31/2017)
- ML17094A150 - APR1400-E-I-NR-14006-NP, Rev. 1, "Treatment of Important Human Actions Implementation Plan." (29 page(s), 3/31/2017)
- ML17094A151 - APR1400-E-I-NR-14010-NP, Rev. 1, "Human Factors Verification and Validation Scenarios." (308 page(s), 3/31/2017)
- ML17094A152 - APR1400-K-I-NR-14005-NP, Rev. 1, "Staffing and Qualifications Implementation Plan." (31 page(s), 2/28/2017)
- ML17094A153 - APR1400-K-I-NR-14009-NP, Rev. 1, "Design Implementation Plan." (20 page(s), 2/28/2017)
- ML17094A155 - APR1400-E-P-NR-14003-NP, Rev. 1, "Severe Accident Analysis Report." (666 page(s), 2/28/2017)
- ML17094A156 - APR1400-E-P-NR-14004-NP, Rev. 1, "Loss of Large Area Analysis Report." (90 page(s), 3/31/2017)