Home > NRC Library > ADAMS Public Documents
Seabrook Station 10 CFR 50.59 Report, Revision 16 to UFSAR, Revision 13 to Appendix R, "Fire Protection Safe Shutdown Capability," Revision 14 to Appendix A, "Evaluation & Comparison to BTP APCSB 9.5-1 ," & Revision 142 to the TRM.
Accession Number: ML14317A463
Date Released: Tuesday, April 26, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14317A481 - Seabrook Station - Updated Final Safety Analysis Report, Revision 16, Cover, LOEP, and Chapter 1, Introduction and General Description of Plant. (294 page(s), 10/21/2014)
- ML14317A479 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Figures 2.3-1 through 2.3-11. (12 page(s), 10/21/2014)
- ML14317A494 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2B, Onsite Meteofological Data Summaries; April 1979 - March 1980. (41 page(s), 10/21/2014)
- ML14317A495 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2C, Geologic Investigations of the Scotland Road Fault. (145 page(s), 10/21/2014)
- ML14317A496 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area. (116 page(s), 10/21/2014)
- ML14317A491 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity. (135 page(s), 10/21/2014)
- ML14317A492 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2F, Geotechnical Report - Reactor Borings. (82 page(s), 10/21/2014)
- ML14317A497 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2G, Static Dynamic Rock Properties. (101 page(s), 10/21/2014)
- ML14317A498 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2J through Appendix 2K. (66 page(s), 10/21/2014)
- ML14317A499 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix L through Appendix R. (218 page(s), 10/21/2014)
- ML14317A509 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Design of Structures, Components, Equipment and Systems. (744 page(s), 10/21/2014)
- ML14317A510 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Figures 3.3-1 through 3.6(N)-2. (49 page(s), 10/21/2014)
- ML14317A507 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Figures, 3.7(B)-1 through 3.7(N)-1. (53 page(s), 10/21/2014)
- ML14317A508 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Figures, 3.8-1 Sh. 1 of 2 through 3.11-1. (51 page(s), 10/21/2014)
- ML14317A594 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Appendix 3A through 3C. (33 page(s), 10/21/2014)
- ML14317A595 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Appendix D through Appendix F. (37 page(s), 10/21/2014)
- ML14317A598 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Appendix 3G through Appendix 3G-28. (29 page(s), 10/21/2014)
- ML14317A596 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Appendix 3G-29 through Appendix 3H. (33 page(s), 10/21/2014)
- ML14317A597 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Appendix 3I. (77 page(s), 10/21/2014)
- ML14317A604 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 4, Reactor. (225 page(s), 10/21/2014)
- ML14317A605 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 5, Reactor Coolant System and Connected Systems. (219 page(s), 10/21/2014)
- ML14317A602 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 6, Engineered Safety Features. (497 page(s), 10/21/2014)
- ML14317A603 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 7, Instrumentation and Controls. (319 page(s), 10/21/2014)
- ML14317A633 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 9, Auxiliary Systems. (666 page(s), 10/21/2014)
- ML14317A634 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 10, Steam and Power Conversion System. (148 page(s), 10/21/2014)
- ML14317A635 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 11, Radioactive Waste Management. (195 page(s), 10/21/2014)
- ML14317A636 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 12, Radiation Protection. (206 page(s), 10/21/2014)
- ML14317A637 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 13, Conduct of Operations. (38 page(s), 10/21/2014)
- ML14317A638 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 14, Initial Test Program. (153 page(s), 10/21/2014)
- ML14317A639 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 15, Accident Analyses. (487 page(s), 10/21/2014)
- ML14317A640 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance. (70 page(s), 10/21/2014)
- ML14317A747 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings. (15 page(s), 10/21/2014)
- ML14317A748 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings. (14 page(s), 10/21/2014)
- ML14318A014 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings. (18 page(s), 10/21/2014)
- ML14318A013 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings. (53 page(s), 10/21/2014)
- ML14318A015 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings. (42 page(s), 10/21/2014)
- ML14318A016 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings. (23 page(s), 10/21/2014)
- ML14318A024 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R), Revision 13. (755 page(s), 10/21/2014)
- ML14318A025 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Technical Requirements, Revision 142. (209 page(s), 10/21/2014)
- ML16117A579 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Design of Structures, Components, Equipment and Systems, Drawings 9763-F-101696, Rev 12, Through 9763-F-101463, Rev 12 - Redacted. (17 page(s), 10/21/2014)
- ML16117A585 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Design of Structures, Components, Equipment and Systems, Drawings 9763-F-101303, Rev 9, Through 9763-F-101528, Rev 7 - Redacted (3 page(s), 10/21/2014)
- ML16117A587 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 3, Design of Structures, Components, Equipment and Systems, Drawings 9763-F-101438, Rev 4, Through 9763-F-101635, Rev 7 - Redacted. (11 page(s), 10/21/2014)
- ML16161A128 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Figures 2.5-1 through 2.5-49. Sheet 2 of 2 - Redacted (20 page(s), 10/21/2014)
- ML16161A186 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 8, Electric Power - Redacted. (271 page(s), 10/21/2014)
- ML16161A240 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 1, Introduction and General Description, Drawings LEGEND1, Rev 5, Through 1-NHY-805062, Rev 19 - Redacted. (10 page(s), 10/21/2014)
- ML16161A295 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings - Redacted. (71 page(s), 10/21/2014)
- ML16161A340 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings - Redacted. (83 page(s), 10/21/2014)
- ML16161A348 - Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings - Redacted. (21 page(s), 10/21/2014)