Forwards info re GE Type AK-2-25 reactor trip breakers,in response to NRC request at 830312 & 13 meetings.W/24 oversize drawings,including one illegible drawing.Aperture cards are available in PDR.
Accession Number: ML13309B240
Date Released: Saturday, October 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13309B239 - Forwards info re GE Type AK-2-25 reactor trip breakers,in response to NRC request at 830312 & 13 meetings.W/24 oversize drawings,including one illegible drawing.Aperture cards are available in PDR. (2 page(s), 3/17/1983)
- ML13311A168 - Rev 8 to "Surveillance Requirement Reactor Plant Protection Sys Channel Functional Test." (427 page(s), 2/23/1983)
- ML20263Q027 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear DC Elementary TCB-6," as-built.Bechtel field change request encl. (2 page(s), 1/12/1976)
- ML20263Q019 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear DC Elementary TCB-9," as-built. (1 page(s), 1/12/1976)
- ML20263Q054 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear Wiring Diagram Section 04," as-built. (1 page(s), 7/15/1982)
- ML13311A186 - "Instruction Manual C-E,Inc Reactor Trip Circuit Breaker Switchgear,San Onofre Unit 2." (138 page(s), 7/15/1976)
- ML13311A165 - Rev 7 to "Emergency Plant Shutdown." (39 page(s), 1/14/1983)
- ML20069E294 - Rev 1 to "Plant Protection Sys Response Time Test for Channel B." (346 page(s), 2/1/1983)
- ML13311A182 - "Instruction Manual C-E,Inc Reactor Trip Circuit Breaker Switchgear,San Onofre Unit 3." (137 page(s), 8/2/1976)
- ML20263Q022 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear DC Elementary TCB-7," as-built.Bechtel field change request encl. (2 page(s), 1/12/1976)
- ML20263Q048 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear Wiring Diagram Section 02," as-built. (1 page(s), 7/15/1982)
- ML20263Q046 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear Wiring Diagram Section 01," as-built. (1 page(s), 7/15/1982)
- ML13311A167 - Rev 5 to "Control Element Drive Mechanism Motor Generator Set Operation." (13 page(s), 8/9/1982)
- ML20263Q030 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear:DC Elementary TCB-5," as-built.Bechtel Field change request encl. (2 page(s), 1/12/1976)
- ML20263Q040 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear DC Elementary TCB-1," as-built.Bechtel field change request encl. (3 page(s), 1/12/1976)
- ML13311A175 - Rev 0 to "Insp & Adjustment of Under Voltage Tripping Device." (118 page(s), 3/8/1983)
- ML20263Q037 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear DC Elementary TCB-2," as-built.Bechtel field change request encl. (2 page(s), 1/12/1976)
- ML20069E306 - Rev 1 to "Reactor Breakers Undervoltage & Shunt Trip Device Circuit Test." (14 page(s), 6/4/1982)
- ML20263Q025 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear DC Elementary TCB-8," as-built.Bechtel field change request encl. (2 page(s), 1/12/1976)
- ML20069E301 - "Reactor Breakers Undervoltage & Shunt Trip Device Circuit Test." (10 page(s), 2/26/1982)
- ML13311A169 - Rev 2 to "Surveillance Requirement Reactor Breakers Undervoltage & Shunt Trip Device Circuit Test." (18 page(s), 2/2/1983)
- ML13311A172 - Rev 0 to "Under-Voltage Tripping Device of GE AK-2-25 Circuit Breakers in Reactor Trip Switchgear." (111 page(s), 3/9/1983)
- ML20069E319 - "Availability Data Program:Rept to Nuclear Util Mgt Concerning Power Plants W/C-E NSSS," quarterly rept. (27 page(s), 3/31/1981)
- ML20069E296 - Rev 1 to "Plant Protection Sys Response Time Test for Channel C." (379 page(s), 2/1/1983)
- ML20263Q051 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear Wiring Diagram Section 03," as-built. (1 page(s), 1/12/1976)
- ML13311A170 - Rev 1 to "Plant Protection Sys Response Time Test for Channel A." (406 page(s), 2/1/1983)
- ML20263Q036 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear DC Elementary TCB-3," as-built.Bechtel field change request encl. (2 page(s), 1/12/1976)
- ML20069E312 - Rev 2 to "Reactor Breakers Undervoltage & Shunt Trip Device Circuit Test." (7 page(s), 3/1/1983)
- ML20263Q043 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear Wiring Diagram Section 05," as-built. (1 page(s), 7/15/1982)
- ML20263Q033 - "Combustion Engineering,Inc Reactor Trip Circuit Breaker Switchgear DC Elementary TCB-4," as-built.Bechtel field change request encl. (2 page(s), 1/12/1976)
- ML13311A171 - Rev 1 to "Plant Protection Sys Response Time Testing for Channel D." (373 page(s), 2/1/1983)