Farley, Units 1 and 2 - Southern Nuclear Operating Company Response to Request for Additional Information Regarding the Revision of the Condensate Stora-ge Tank Level.
Accession Number: ML13198A441
Date Released: Thursday, July 25, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13198A443 - Farley, Units 1 and 2 - Southern Nuclear Operating Company Response to Request for Additional Information Regarding the Revision of the Condensate Storage Tank Level. (24 page(s), 7/2/2013)
- ML13198A450 - DOEJ- FRSNC419117 - M001 - Southern Nuclear Operating Company - Documentation of Engineering Judgment, "CST Volume Requirements per Plant Transient Events," Enclosure 2 to NL-13-1257. (28 page(s), 9/4/2012)
- ML13198A453 - FNP-0-ESB-0.2, Version 2.0 - Farley Nuclear Plant, Specific Background Document for FNP-1/2 - ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257. (54 page(s), 6/14/2013)
- ML13198A454 - FNP-0-ESB-0.3, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.3 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding (With RVLIS), Enclosure 3 to NL-13-1257. (45 page(s), 6/14/2013)
- ML13198A455 - FNP-0-ESB-0.4, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.4- Natural Circulation Cooldown With Allowance For Reactor Vessel Head Steam Voiding (Without RVLIS), Enclosure 3 to NL-13-1257. (60 page(s), 6/14/2013)
- ML13198A456 - FNP-1-ESP-.02, Revision 19 - Farley Nuclear Plant - Event Specific Procedure FNP-1- ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257. (51 page(s), 6/14/2013)
- ML13198A457 - FNP-1-ESP-0.3, Revision 13 - Farley Nuclear Plant - Event Specific Procedure FNP-1 - ESP-0.3 - Natural Circulation Cooldown With Allowance Reactor Vessel Head Steam Voiding (With RVLIS), Enclosure 3 to NL-13-1257. (24 page(s), 6/14/2013)
- ML13198A458 - FNP-1-ESP-0.4, Revision 21 - Farley Nuclear Plant Event Specific Procedure FNP-1-ESP-0-4 Natural Circulation Cooldwn with Allowance for Reactor Vessel Head Steam Voiding (Without RVLIS), Enclosure 3 to NL-13-1257. (29 page(s), 6/14/2013)
- ML13198A459 - FNP-2-ESP-0.2, Revision 16 - Farley Nuclear Plant Event Specific Procedure FNP-2 - ESP-0.2 Natural Circulation Cooldown to Prevent Reaction Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257. (51 page(s), 6/14/2013)
- ML13198A460 - FNP-2-ESP-0.3, Revision 12 - Farley Nuclear Plant Event Specific Procedure FNP-2-ESP-0.3 Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (With RVLIS), Enclosure 3 to NL-13-1257. (24 page(s), 6/14/2013)
- ML13198A452 - FNP-2-ESP-0.4, Revision 18 - Farley Nuclear Plant Event Specific Procedure FNP-2-ESP-0-4 Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (Without RVLIS), Enclosure 3 to NL-13-1257. (29 page(s), 6/14/2013)
- ML13198A462 - Drawings, U-161693, U-213481, U161703B and 72-4860, Enclosure 5 to NL-13-1257. (4 page(s), 7/2/2013)
- ML13198A463 - FAI/13-0392 - Request for Additional Information by the Office of Nuclear Reactor Regulation Joseph M. Farley Nuclear Plants, Units 1 and 2 Southern Nuclear Operating Company, Project No.: SNC-WRAI-CST-Vortex. (19 page(s), 6/30/2013)