Home > NRC Library > ADAMS Public Documents
FOIA/PA-2013-0135 - Resp 1 - Final
Accession Number: ML13196A388
Date Released: Wednesday, July 3, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13196A190 - FOIA/PA-2013-0135 - Resp 1 - FINAL. (1 page(s), 6/25/2013)
- ML070540205 - 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review. (14 page(s), 3/1/2007)
- ML12145A072 - Letter from D. Morris, NMFS, to A. Imboden, NRC, Conclusion of Informal Section 7 Consultation at Pilgrim. (40 page(s), 5/17/2012)
- ML12213A477 - Letter from D. Morris, NMFS, to A. Hull, NRC, regarding Ecolaw letter and Pilgrim section 7 Consultations. (12 page(s), 7/16/2012)
- ML13196A172 - Email from B. Balsam, NRR to A. Williamson, NRR et at., RE: Pilgrim Section 7. (3 page(s), 2/16/2012)
- ML13196A173 - Email from J. Crocker, NOAA to B. Balsam, NRR Re: NRC Letter for Pilgrim Regarding Atlantic Sturgeon. (2 page(s), 3/1/2012)
- ML13196A174 - Email from B. Balsam, NRR to D. Logan, NRR on Pilgrim Emails. (1 page(s), 3/5/2012)
- ML13196A176 - Email from B. Balsam, NRR to M. Smith, OGC et al., on Pilgrim - NMFS Letter Replying to JRWA. (4 page(s), 3/21/2012)
- ML13196A175 - Email from A. Williamson, NRR to A. Imboden, NRR RE: SUNSI Review Request for ML061390355. (7 page(s), 3/16/2012)
- ML13196A177 - Email from B. Balsam, NRR to D. Logan, NRR RE: Notes for NMFS Call. (2 page(s), 3/22/2012)
- ML13196A178 - Email from D. Logan, NRR to A. Imboden, NRR RE: PDF of Today's Webinar. (3 page(s), 3/26/2012)
- ML13196A179 - Email from B. Balsam, NRR to J. Egan, Entergy RE: Pilgrim - A Few Clarification Questions. (4 page(s), 4/10/2012)
- ML13196A180 - Email from B. Balsam, NRR to J. Egan, Entergy RE: Pilgrim - 2010 Annual Report Marine Ecology Studies. (2 page(s), 4/10/2012)
- ML13196A181 - Email from B. Balsam, NRR to J. Crocker, NOAA RE: Pilgrim - A Few Clarification Questions. (9 page(s), 4/10/2012)
- ML13196A182 - Attachment - Impingement of Organisms on the Intake Screens at Pilgrim Nuclear Power Station. (357 page(s), 4/22/2011)
- ML13196A183 - Email from J. Crocker, NOAA to B. Balsam, NRR Re: Pilgrim - A Few Clarification Questions. (4 page(s), 4/11/2012)
- ML13196A184 - Email from J. Egan, Entergy to B. Balsam, NRR RE: Pilgrim - MIT Study. (3 page(s), 4/12/2012)
- ML13196A185 - Email from J. Crocker, NOAA to B. Balsam, NRR ESA 7 Consultation with NRC on Entergy's Pilgrim Nuclear Power Station. (3 page(s), 4/12/2012)
- ML13196A186 - Email from B. Balsam, NRR to J. Crocker, NOAA on Pilgrim: NRC's Complete Responses to 4-9-12 NMFS Questions. (6 page(s), 4/12/2012)
- ML13196A187 - Email from B. Balsam, NRR to J. Crocker, NOAA RE: Pilgrim: NRC Complete Responses to 4-9-12 NMFS Questions. (4 page(s), 4/12/2012)
- ML13196A188 - Email from B. Balsam, NRR to J. Crocker, NOAA RE: Pilgrim: NRC Complete Responses to 4-9-12 NMFS Questions. (11 page(s), 4/12/2012)
- ML13196A189 - Email from B. Balsam, NRR to J. Crocker, NOAA RE: Pilgrim: NRC complete responses to 4-9-12 NMFS questions. (84 page(s), 4/12/2012)
- ML13196A191 - Letter from J. Alexander, Entergy to D. Webster, EPA on Distribution of Pilgrim Nuclear Power Station Supplemental 316 Demonstration. ML061390357 publicly available. (3 page(s), 4/11/2000)
- ML13196A192 - Email from B. Balsam, NRR to J. Egan, Entergy RE: Pilgrim - MIT Study. (3 page(s), 4/13/2012)
- ML13196A193 - Email from J. Egan, Entergy to B. Balsam, NRR RE: Pilgrim License Renewal Questions. (2 page(s), 4/13/2012)
- ML13196A194 - Email from J. Egan, Entergy to B. Balsam, NRR FW: Pilgrim - MIT Study. (3 page(s), 4/13/2012)
- ML13196A195 - Email from J. Egan, Entergy to B. Balsam, NRR RE: Pilgrim: NRC's Complete Responses to 4-9-12 NMFS Questions. (2 page(s), 4/16/2012)
- ML13196A196 - Email from B. Balsam, NRR to J. Egan, Entergy RE: FW: Pilgrim Question. (1 page(s), 4/16/2012)
- ML13196A197 - Email from J. Egan, Entergy to B. Balsam, NRR RE: FW: Pilgrim Question. (7 page(s), 4/16/2012)
- ML13196A198 - Email from B. Balsam, NRR to D. Logan, NRR on Letters to NMFS from Various Groups. (14 page(s), 4/16/2012)
- ML13196A199 - Email from J. Crocker, NOAA to B. Balsam, NRR on Pilgrim Question. (1 page(s), 4/16/2012)
- ML13196A200 - Email from J. Crocker, NOAA to B. Balsam, NRR FW: Pilgrim Question. (48 page(s), 4/16/2012)
- ML13196A201 - Email from B. Balsam, NRR to J. Egan, Entergy RE: Pilgrim Question. (4 page(s), 4/16/2012)
- ML13196A202 - Email from J. Egan, Entergy to B. Balsam, NRR RE: Pilgrim consultation. (2 page(s), 4/17/2012)
- ML13196A203 - Email from B. Balsam, NRR to J. Crocker, NOAA RE: update on Pilgrim consultation. (1 page(s), 4/17/2012)
- ML13196A204 - Email from J. Egan, Entergy to B. Balsam, NRR RE: Status of Pilgrim consultation. (2 page(s), 5/1/2012)
- ML13196A205 - Email from J. Egan, Entergy to B. Balsam, NRR RE: Pilgrim clarification question... (2 page(s), 5/8/2012)
- ML13196A206 - Email from J. Crocker, NOAA to B. Balsam, NRR Re: Pilgrim clarification question... (3 page(s), 5/9/2012)
- ML13196A207 - Email from B. Balsam, NRR to J. Egan, Entergy RE: Pilgrim question... Dredging. (2 page(s), 5/9/2012)
- ML13196A208 - Email from B. Balsam, NRR to J. Egan, Entergy RE: NMFS Outreach - Pilgrim. (1 page(s), 5/9/2012)
- ML13196A209 - Email from B. Balsam, NRR to M. Smith, OGC FW: NMFS Outreach Pilgrim. (1 page(s), 5/9/2012)
- ML13196A210 - Email from D. Logan, NRR to B. Balsam, NRR RE: Pilgrim memo to file. (6 page(s), 5/10/2012)
- ML13196A211 - Email from B. Balsam, NRR to D. Logan, NRR RE: Pilgrim Memo to file. (1 page(s), 5/10/2012)
- ML13196A212 - Email from B. Balsam, NRR to J. Crocker, NOAA et al., RE: Pilgrim. (1 page(s), 5/15/2012)
- ML13196A214 - Email from B. Balsam, NRR to J. Susco, NRR et al., FW: Pilgrim. (1 page(s), 5/15/2012)
- ML13196A215 - Email from J. Egan, Entergy to B. Balsam, NRR re: Rilgrim. (1 page(s), 5/17/2012)
- ML13196A216 - Email from J. Egan, Entergy to B. Balsam, NRR FW: NMFS Consultation Letter- Pilgrim. (1 page(s), 5/21/2012)
- ML13196A217 - Email from B. Balsam, NRR to J. Crocker, NOAA et al., RE: Pilgrim Informal Consultation Letter. (4 page(s), 5/22/2012)
- ML13196A218 - Email from J. Egan, Entergy to B. Balsam, NRR RE: Pilgrim License Renewal - Supplemental Response. (2 page(s), 5/24/2012)
- ML13196A219 - Email from B. Balsam, NRR to J. Susco, NRR et al., RE: Pilgrim Informal Consultation Letter. (3 page(s), 5/29/2012)
- ML13196A220 - Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities related to the National Marine fisheries Service's Final Rule to List the Atlantic Sturgeon. (10 page(s), 6/6/2012)
- ML13196A221 - Email from B. Balsam, NRR to T. Chapman, FWS Pilgrim Nuclear Power Station: Transmittal of Final Supplemental EIS. (15 page(s), 6/29/2012)
- ML13196A222 - Email from B. Balsam, NRR to M. Smith, OGC on Pilgrim: Have You Seen this Letter? (1 page(s), 6/29/2012)
- ML13196A223 - Email from B. Balsam, NRR to S. Uttal, OGC et al FW: Pilgrim Nuclear Power Station: Transmittal of Final Supplement EIS. (1 page(s), 6/29/2012)
- ML13196A224 - Email from D. Logan, NRR to M. Murray-Brown, NOAA et al., RE: Pilgrim Follow Up. (1 page(s), 7/17/2012)
- ML13196A225 - Email from B. Balsam, NRR to J. Egan, Entergy FW: Pilgrim Letter. (2 page(s), 7/31/2012)
- ML13196A226 - Email from B. Balsam, NRR to D. Logan, NRR et al., FW: Pilgrim letter. (12 page(s), 7/31/2012)
- ML13196A227 - Letter from D. Morris, NOAA to A. Hull, NRR regarding the relicensing and continued operation of Pilgrim. (1 page(s), 8/30/2012)
- ML13196A228 - Email from D. Logan, NRR to M. Wong, NRR FW: Pilgrim Informal Consultation Letter. (1 page(s), 12/19/2012)
- ML13196A229 - Email A. Williamson to C. Boelke, Subj: Pilgrim Nuclear Power Station Biological Assessment and Essential Fish Habitat. (3 page(s), 12/12/2006)
- ML13196A230 - Email from B. Balsam, NRR to J. Crocker, NOAA RE: Media Questions re: Pilgrim license renewal review. (6 page(s), 2/9/2012)
- ML13196A231 - Email from B. Balsam, NRR to J. Crocker, NOAA RE: Media Questions re: Pilgrim license renewal review. (5 page(s), 2/9/2012)
- ML13196A232 - Email from J. Crocker, NOAA to B. Balsam, NRR RE: Media questions re: Pilgrim license renewal review. (9 page(s), 2/13/2012)
- ML13196A233 - Email from J. Crocker, NOAA to B. Balsam, NRR RE: Pilgrim. (1 page(s), 3/22/2012)
- ML13196A234 - Email from M. Smith to S. Uttal et al., FW: Entergy - NRC Pilgrim Nuclear Relicensing ESA Consultation. (2 page(s), 4/12/2012)
- ML13196A235 - Email from B. Balsam, NRR to M. Smith, OGC RE: Attached Image. (2 page(s), 3/27/2012)
- ML13196A236 - Email from M. Smith, OGC to S. Uttal OGC et al., on Additional Pilgrim Exhibits. (123 page(s), 4/12/2012)
- ML13196A237 - Email M. Smith to S. Uttal, et al., FW: Entergy-NRC Pilgrim Nuclear Relicensing ESA Consultation. (53 page(s), 4/12/2012)
- ML13196A238 - Email from B. Balsam, NRR to M. Smith, OGC RE: Section 7 (d) Memo. (2 page(s), 4/30/2012)
- ML13196A239 - Email from B. Balsam, NRR to M. Smith, OGC RE: Post Article on Right Whales. (1 page(s), 5/1/2012)
- ML13196A240 - Email from B. Balsam, NRR to M. Smith, OGC on Pilgrim Letter for Concurrence. (1 page(s), 10/1/2012)
- ML13196A241 - Email from J. Crocker, NOAA to B. Balsam, NRR Fwd: FW: ESA 7 Consultation with NRC on Entergy's Pilgrim Nuclear Power Station. (2 page(s), 4/12/2012)
- ML13196A242 - Attachment - Letter from R. Asmutis-Silvia, WDCS to D. Morris NOAA on ESA 7 Consultation with NRC on Entergy's Pilgrim Nuclear Power Station. (9 page(s), 4/3/2012)