Home > NRC Library > ADAMS Public Documents
FOIA/PA-2012-0121 - Resp 3 - Partial.
Accession Number: ML122130398
Date Released: Friday, August 10, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12213A386 - FOIA/PA-2012-0121 - Resp 3 - Partial. (1 page(s), 7/27/2012)
- ML12213A332 - Questions on CR-2011-03346 (Mold Hold Restraint). (3 page(s), 7/27/2012)
- ML12213A333 - SB-0033 - Calculation C-CSS-099.20-054, Revision 0. (4 page(s), 7/27/2012)
- ML12213A334 - SB-0034 - Bechtel Response to Calculation C-CSS-099.20-054, Revision 0. (1 page(s), 7/27/2012)
- ML12213A335 - Review of Technical Assessment Report No. 25539-200 COR-0000-00001. (2 page(s), 7/27/2012)
- ML12213A336 - C-CSS-099.20054, Rev. 000. (3 page(s), 7/27/2012)
- ML12213A337 - SB-00-20: CR-2011-03346 Evaluation. (5 page(s), 7/27/2012)
- ML12213A338 - Communications Plan - Reactor Pressure Vessel Head Replacement. (12 page(s), 10/31/2011)
- ML12213A339 - Addendum to the Reactor Vessel Head Replacement Communication Plan. (8 page(s), 10/31/2011)
- ML12213A340 - E-mail from S. CuadradoDeJesus to B. Jose, et al, RE: Daily Morning Meeting Minutes - October 11 th - 2011 - Forgot Davis-Besse Text in Original. (1 page(s), 10/11/2011)
- ML12213A341 - E-mail from S. Cuadrado DeJesus to A. Sheikh, et al, FW: Davis-Besse Shield Building Crack. (2 page(s), 10/11/2011)
- ML12213A342 - E-mail from T. Lupold to P. Hiland, et al, FW: Davis-Besse Shield Building Crack (Identified During RPV Head Replacement). (3 page(s), 10/12/2011)
- ML12213A343 - E-mail from D. Hills to T. Lupold, et al, RE: Davis-Besse Shield Building Crack (Identified During RPV Head Replacement. (3 page(s), 10/12/2011)
- ML12213A344 - E-mail from S. Cuadrado DeJesus to R. Auluck, et al, FW: Davis-Besse Plant to Contact Media. (1 page(s), 10/12/2011)
- ML12213A345 - E-mail from A. Rezai to D. Hills, et al, RE: Davis-Besse Shield Building Crack (Identified During RPV Head Replacement). (4 page(s), 10/12/2011)
- ML12213A346 - E-mail from A. Sheikh to S. CuadradoDeJesus, et al,: RE: DB Presentation. (1 page(s), 10/18/2011)
- ML12213A347 - E-mail from E. Sanchez Santiago to M. Murphy, et al,: FW: Davis Besse Phone Call Feedback. (11 page(s), 10/19/2011)
- ML12213A348 - Table of Contents to Isolated Crack Indication Identified by Impulse Response Testing of the Shield Building. (16 page(s), 10/28/2011)
- ML12213A349 - E-mail from E. Sanchez Santiago to M. Murphy, et al, Subject: 11-2-2011 Conference Call Summary. (1 page(s), 11/4/2011)
- ML12213A350 - E-mail from E. Sanchez Santiago to M. Murphy, et al, Subject: FW: NRC Technical Reviewer Focus Questions. (2 page(s), 11/9/2011)
- ML12213A351 - Davis-Besse Nuclear Power Station Containment Shield Building Issue. (2 page(s), 11/10/2011)
- ML12213A352 - E-mail from E. Sanchez Santiago to M. Murphy, et al, Subject: FW: Davis Besse Shield Building: Technical Review Discussion Items. (2 page(s), 11/16/2011)
- ML12213A353 - Davis-Besse Shield Building Laminar Cracking. (12 page(s), 11/15/2011)
- ML12213A354 - E-mail from P. Hernandez to M. Hamm, Subject; RE: DB Containment (system) Writeup. (2 page(s), 11/18/2011)
- ML12213A355 - E-mail from J. Zimmerman to M. Evans, et al, Subject: FYI: Davis-Besse Draft CAL. (4 page(s), 11/26/2011)
- ML12213A356 - E-mail from P. Hernandez to E. Sanchez-Santiago, Subject:FW: C-1 11A Drawing Inconsistency? (1 page(s), 11/29/2011)
- ML12213A357 - E-mail from S. Sakai to A. Erickson, Subject: FW: Licensee Projected Timeline. (2 page(s), 12/2/2011)
- ML12213A358 - E-mail from T. Briley to M. Murphy, et al, Subject: Davis-Besse Shield Building. (1 page(s), 12/2/2011)
- ML12213A359 - E-mail from V. Mitlyng to T. Briley, et al, Subject: PRESS RELEASE HAS BEEN ISSUED. (1 page(s), 12/2/2011)
- ML12213A360 - E-mail from J. Neurauter to W. Jessup, et al, Subject: RE: Davis-Besse Functionality Review Criteria Summary. (3 page(s), 12/15/2011)
- ML12213A361 - E-mail from P.. Hernandez to M. Mahoney, et al, Subject: Q & A assignments for Davis Besse. (17 page(s), 1/3/2012)
- ML12213A362 - E-mail from J. Neurauter to M. Murphy, et al, Subject: Davis Besse shield building issue documents. (1 page(s), 1/4/2012)
- ML12213A363 - E-mail from R. Auluck to D. Hills, et al, Subject: RE: Davis Besse Shield Building - License Renewal. (5 page(s), 1/17/2012)
- ML12213A364 - E-mail from A. Stone to S. CuadradoDeJesus, et al, Subject: RE: Davis Besse Shield Building - License Renewal. (5 page(s), 1/17/2012)
- ML12213A365 - E-mail from D. Hills to S. CuadradoDeJesus, et al, Subject: RE: Davis Besse Shield Building - License Renewal. (5 page(s), 1/17/2012)
- ML12213A366 - E-mail from P. Hernandez to S. CuadradoDeJesus, Subject: RE: Davis Besse Shield Building. (2 page(s), 1/18/2012)
- ML12213A367 - E-mail from M. Holmberg to S. CuadradoDeJesus, Subject: RE: Davis Besse Shield Building - License Renewal. (3 page(s), 1/18/2012)
- ML12213A368 - E-mail from M. Holmberg to S. CuadradoDeJesus, et al, Subject: RE: Status Call Results - DB SB Cracking. (2 page(s), 1/20/2012)
- ML12213A369 - E-mail from M. Holmberg to J. Neurauter, et al, Subject: SB Root Cause Effort. (1 page(s), 1/20/2012)
- ML12213A370 - E-mail from M. Holmberg to S. CuadradoDeJesus, Subject: RE: Status Call Results - DB SB Cracking. (2 page(s), 1/23/2012)
- ML12213A371 - E-mail from A. Sheikh to S. CuadradoDeJesus, et al, Subject: RE: Status Call Results - DB SB Cracking. (3 page(s), 1/23/2012)
- ML12213A373 - E-mail from M. Holmberg to S. CuadradoDeJesus, et al, Subject: RE: (1 page(s), 1/23/2012)
- ML12213A374 - E-mail from M. Holmberg to S. CuadradoDeJesus, Subject Bridge line for Thursdays Call? (1 page(s), 1/25/2012)
- ML12213A375 - E-mail from D. Morey to A. Stone, et al, Subject: RE: Decision on releasing draft SER. (1 page(s), 1/26/2012)
- ML12213A376 - E-mail from B. Jose to S. CuadradoDeJesus, et al, Subject: FW: Davis-Besse Draft SEIS is delayed. (1 page(s), 1/26/2012)
- ML12213A377 - E-mail from P. Cooper to P. Chandrathil, et al, Subject: Re: Davis-Besse Draft SEIS is delayed. (4 page(s), 1/26/2012)
- ML12213A378 - White Paper: Review of Technical Report No: 25539-200-COR-0000-00001, Structural Evaluation of Shield Building, Davis-Bess Nuclear Plant. (3 page(s), 7/27/2012)
- ML12213A379 - E-Mail from V. Meghani, RIII, to H. Graves, RES/DE/SGSEB, et. Al., Subject: RE: Davis Besse shield building cracks. (1 page(s), 11/14/2011)
- ML12213A380 - E-Mail from E. Sanchez-Santiago, RIII, to M. Murphy, NRO/DORL, et. Al., Subject: FW: Davis Besse Shield Building Technical Review Discussion Items (2 page(s), 11/16/2011)
- ML12213A381 - E-Mail from E. Sanchez-Santiago, RIII to M. Murphy, NRO/DORL, et. Al., Subject: Davis Besse shield building issue evaluation. (1 page(s), 11/21/2011)
- ML12213A382 - E-Mail from T. Briley, RIII, to M. Murphy, NRO/DORL, et. Al., Subject: Davis-Besse Shield Building Calculation References. (1 page(s), 12/1/2011)
- ML12213A383 - E-Mail from J. Rutkowski, RIII, to T. Briley, RIII et. Al., Subject: Licensee Project Timeline. (2 page(s), 12/2/2011)
- ML12213A384 - E-Mail from P. Hernandez, OE/CRB, to M. Evans, NRR/DORL, et. Al., Subject: RE: Davis-Besse POP. (2 page(s), 12/2/2011)
- ML12213A385 - E-mail from E. Williamson, OGC to L. Subin, OGC Subject: FW: Davis Besse Shield Building Path Forward Discussion w/attached meeting scheduler. (2 page(s), 11/22/2011)