FOIA/PA-2010-0116 - Resp 3 - Partial.
Accession Number: ML101170341
Date Released: Monday, April 26, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML101170321 - FOIA/PA-2010-0116 - Resp 3 - Partial. (9 page(s), 4/16/2010)
- ML101170323 - E-mail from Chou to Franke, Crystal River. (1 page(s), 10/5/2009)
- ML101170324 - E-Mail from O'Donohue to Masters, Pictures of CR3 Concrete Crack. (2 page(s), 10/6/2009)
- ML101170325 - E-Mail from ODonohue to Masters, Crystal River Containment Crack. (1 page(s), 10/6/2009)
- ML101170326 - E-Mail from Carrion to Blake, Crystal River Containment Crack. (1 page(s), 10/6/2009)
- ML101170327 - E-Mail from Carrion to Franke, Crystal River Containment Crack. (1 page(s), 10/6/2009)
- ML101170328 - E-Mail from Collins to Sykes, Thought on the Containment at Crystal River. (1 page(s), 10/6/2009)
- ML101170329 - E-Mail from Carrion to Chou, Crystal River U3 Containment Cracks. (1 page(s), 10/7/2009)
- ML101170330 - E-Mail from Franke to Sykes, Crystal River Talking Points. (1 page(s), 10/7/2009)
- ML101170331 - E-Mail from Sykes to Franke, Crystal River, Unit 3 Containment Cracks. (2 page(s), 10/7/2009)
- ML101170371 - E-Mail from Christensen to Kennedy, Establishing a Special Inspection Team for Crystal River. (1 page(s), 10/8/2009)
- ML101170372 - E-Mail from Fletcher to Ninh, Crystal River SI Charter. (4 page(s), 10/8/2009)
- ML101170373 - E-Mail from Doutt to Kuntz, Crystal River SIT Status Update. (2 page(s), 10/19/2009)
- ML101170374 - E-Mail from Carrion to Franke, Draft Crystal River SIT Charter. (1 page(s), 10/9/2009)
- ML101170375 - E-Mail from Carrion to Franke, Draft Crystal River SIT Charter. (1 page(s), 10/9/2009)
- ML101170376 - E-Mail from Carrion to Kennedy, Crystal River SI Charter. (1 page(s), 10/9/2009)
- ML101170377 - E-Mail from Carrion to Morrison, Crystal River SI Charter. (1 page(s), 10/9/2009)
- ML101170379 - E-Mail from Carrion to Ninh, Crystal River 3 Special Inspection Report Number 2009-007. (1 page(s), 10/9/2009)
- ML101170380 - E-Mail from Carrion to Lake, Documents Reviewed During First Week of SIT Activities. (3 page(s), 10/19/2009)
- ML101170381 - E-Mail from Franke to Sengupta, CR3. (1 page(s), 10/9/2009)
- ML101170385 - E-Mail from Franke to Sykes, 2009 Oct 13 - Containment - NRC SIT Briefing. (9 page(s), 10/13/2009)
- ML101170386 - E-Mail from Morrison to Reyes, Special Inspection Charter to Evaluate Crystal River Containment Building. (1 page(s), 10/13/2009)
- ML101170387 - E-Mail from Kennedy to Christensen, Crystal River - High Level Update. (1 page(s), 10/15/2009)
- ML101170389 - E-Mail from Chou to Franke, Questions on Containment. (1 page(s), 10/16/2009)
- ML101170390 - E-Mail from Chou to Franke, Turkey Point Contamination Wall Cut During Reactor Head Replacement in 2004 & 2005. (1 page(s), 10/16/2009)
- ML101170533 - E-Mail from Carrion re Lou's Phone Number at Crystal River. (1 page(s), 10/19/2009)
- ML101170534 - E-Mail from Carrion re SIT Status Call. (1 page(s), 10/19/2009)
- ML101170536 - E-Mail from Carrion to Lake, Electronic Version of Debrief Outline. (2 page(s), 10/20/2009)
- ML101170537 - E-Mail from Carrion to Collins re Lou's Phone Number at Crystal River. (1 page(s), 10/20/2009)
- ML101170538 - E-Mail from Carrion to Masters, Crystal River 3 Status Update. (1 page(s), 10/25/2009)
- ML101170539 - E-Mail from Carrion to Franke re NDE Procedure. (1 page(s), 10/26/2009)
- ML101170540 - E-Mail from Carrion re Status Meeting Conducted by Garry Miller. (1 page(s), 10/27/2009)
- ML101170541 - E-Mail from Franke to Lake, Special Inspection Charter to Evaluate Crystal River Containment Building. (4 page(s), 10/27/2009)
- ML101170542 - E-Mail from Franke to Lake, Crystal River 3 Containment Delamination Update. (21 page(s), 10/27/2009)
- ML101170543 - E-Mail from Carrion re Status of CR3 NDE. (1 page(s), 10/28/2009)
- ML101170544 - E-Mail from Carrion to Franke re Status Meeting Conducted by Garry Miller. (1 page(s), 10/29/2009)
- ML101170545 - E-mail from Carrion re SIT Status Meeting Conducted by Garry Miller, (Oct 30 2009). (1 page(s), 10/30/2009)
- ML101170546 - E-mail from Christensen to Franke re Crystal River Pics. (1 page(s), 11/2/2009)
- ML101170547 - E-Mail from Franke to Lake, Question re-Statement in CR3 Talking Points on Concrete Issue. (1 page(s), 11/3/2009)
- ML101170548 - E-Mail from Lake to Masters, FSAR Section 5.2. (2 page(s), 11/3/2009)
- ML101170608 - E-Mail from Lake to Masters, FSAR Section 5.2. (1 page(s), 11/3/2009)
- ML101170609 - E-Mail from Carrion to Lake, Morning Status. (1 page(s), 11/3/2009)
- ML101170610 - E-Mail from Carrion to Franke, Status. (1 page(s), 11/3/2009)
- ML101170611 - E-Mail from Masters to Davis re CR3 SIT Update. (1 page(s), 11/4/2009)
- ML101170613 - E-Mail from Carrion to Thomas, Morning Status. (2 page(s), 11/4/2009)
- ML101170614 - E-Mail from Chou to Franke, Crystal River Containment Wall Concrete Delamination. (1 page(s), 11/4/2009)
- ML101170615 - E-Mail from Carrion re CR3 Status. (1 page(s), 11/4/2009)
- ML101170616 - E-Mail from Masters to Carrion, Observations from Core Boring This Afternoon. (1 page(s), 11/5/2009)
- ML101170617 - E-Mail from Masters re CR3 SIT Update. (2 page(s), 11/5/2009)
- ML101170618 - E-Mail from Carrion to Franke, CR3 SIT Status. (1 page(s), 11/5/2009)
- ML101170671 - E-Mail from Carrion to Franke, CR3 SIT Status. (1 page(s), 11/5/2009)
- ML101170673 - E-Mail from Carrion to Franke, Crystal River Containment Wall Opening Core Boring Pictures. (2 page(s), 11/5/2009)
- ML101170675 - E-Mail from Carrion to Masters, Observations from Core Boring This Afternoon. (2 page(s), 11/6/2009)
- ML101170676 - E-Mail from Masters to Carrion, Observations from Core Boring this Afternoon. (2 page(s), 11/9/2009)
- ML101170677 - E-Mail from Plisco to Masters, CR3 SIT Update. (2 page(s), 11/9/2009)
- ML101170678 - E-Mail from Franke to Coursey, Special Inspection Charter to Evaluate Crystal River Containment Building. (4 page(s), 11/9/2009)
- ML101180309 - E-Mail from Carrion to Franke, CR3 SIT Status. (2 page(s), 11/10/2009)
- ML101170679 - E-Mail from Franke to Lake, SIT Debrief Template. (1 page(s), 11/10/2009)
- ML101170680 - E-Mail from Franke to Lake, Crystal River SIT Exit. (1 page(s), 11/10/2009)
- ML101170681 - E-Mail from Carrion to Franke, CR3 SIT Status (November 11, 2009). (1 page(s), 11/11/2009)
- ML101170730 - E-Mail from Carrion to Franke, CR3 SIT Status (10 Nov 2009). (2 page(s), 11/11/2009)
- ML101170731 - E-Mail from Franke to Lake, Crystal River SIT. (1 page(s), 11/11/2009)
- ML101170732 - E-Mail from Carrion to Franke, CR3 SIT Status (November 12, 2009). (1 page(s), 11/12/2009)
- ML101170733 - E-Mail from Carrion to Franke, CR3 SIT Status. (1 page(s), 11/13/2009)
- ML101170734 - E-Mail from Carrion to Lake, Background.doc. (2 page(s), 11/16/2009)
- ML101170735 - E-Mail from Masters to Lake, SIT Experience for Mr. Ryes. (2 page(s), 11/16/2009)
- ML101170736 - Handwritten Notes Re: Crystal River. (2 page(s), 4/16/2010)
- ML101170737 - E-Mail from Chou to Sabisch, Concrete Curing Time Between the New Concrete Pour and the Application of Tensioning. (1 page(s), 11/16/2009)
- ML101170738 - E-Mail from Lake to Franke, SIT Experience for Mr. Ryes. (2 page(s), 11/17/2009)
- ML101170739 - E-Mail from Carrion to Lake, SIT Status Call. (1 page(s), 11/18/2009)
- ML101170784 - E-Mail from Franke to Khanna, Public Meeting with Progress - SIT Talking Points/Notes. (3 page(s), 11/19/2009)
- ML101170786 - E-Mail from Carrion to Lake, Charter #7. (3 page(s), 11/23/2009)
- ML101170787 - E-Mail from Carrion to Lake, Charter Item #1. (3 page(s), 11/23/2009)
- ML101170788 - E-Mail from Carrion to Chou, Nov 20 CR3 Presentation. (1 page(s), 11/24/2009)
- ML101170789 - E-Mail from Carrion to Lake, 2009 Nov 23 - Containment Unfolded Graphics. (1 page(s), 11/24/2009)
- ML101170790 - E-Mail from Chou to Franke, New Concrete Pour Schedule for Crystal River. (2 page(s), 11/24/2009)
- ML101170791 - E-Mail from Lake to Herrin, Changes to Crystal River SIT Exit. (1 page(s), 11/24/2009)
- ML101170792 - E-Mail from Chou to Franke, Curing Time for the Containment Wall Opening With Tendons. (2 page(s), 11/24/2009)
- ML101170793 - E-Mail from Carrion to Williams, Draft Refute 4.2 for Review. (1 page(s), 11/30/2009)
- ML101170794 - E-Mail from Carrion to Williams, Draft Refute 4.2 for Review. (1 page(s), 11/30/2009)
- ML101170817 - E-Mail from Carrion to Thomas, Question Clarification. (1 page(s), 11/30/2009)
- ML101170818 - E-Mail from Lake to Chou, Monday NCRs. (2 page(s), 12/2/2009)
- ML101170819 - Root Cause Analysis - PII Metrics as of Dec 3rd 2009. (1 page(s), 12/3/2009)
- ML101170820 - E-Mail from Lake to Dan naus, Clarification on Vertical Tendons. (1 page(s), 12/4/2009)
- ML101170821 - E-Mail from Lake to Masters, Update on Crystal River. (1 page(s), 12/14/2009)
- ML101180258 - E-Mail from Chou to Lake, Proposal for the Inspection of Crystal River 3 Containment Wall Opening Closure and Repair of Wall Delamination. (1 page(s), 12/14/2009)
- ML101180259 - E-Mail from Franke, Additional Resources Needed for Crystal River SIT. (1 page(s), 12/17/2009)
- ML101180260 - E-Mail from Williams to Franke, CR Containment Comm Plan Update. (2 page(s), 12/21/2009)
- ML101180261 - E-Mail from Chou to Franke, NRC Activities During Repair CR Containment. (2 page(s), 12/21/2009)
- ML101180262 - Root Cause Analysis - PII Metrics as of Dec 28th 2009. (2 page(s), 12/28/2009)
- ML101180263 - E-Mail from Calloway to Ninh, Crystal River 2009005 Inspection Input. (18 page(s), 1/5/2010)
- ML101180264 - E-Mail from Kennedy to Franke, Crystal River De-lamination Project Presentations. (1 page(s), 1/6/2010)
- ML101180266 - E-Mail from Kennedy to Franke, DD Counterpart Meeting with NRR and NSIR. (1 page(s), 1/11/2010)
- ML101180267 - E-Mail from Williams to Franke, Crystal River Communications Team. (1 page(s), 1/7/2010)
- ML101180268 - E-Mail from Lake to Dan naus, Status of NRC Questions. (1 page(s), 1/15/2010)
- ML101180269 - E-Mail from Christensen to R2DRS, FOIA on Crystal River Containment. (1 page(s), 1/20/2010)
- ML101180270 - E-Mail from Ogle to Masters, Crystal River Containment Crack. (1 page(s), 1/20/2010)
- ML101180292 - E-Mail from Ogle to-Masters, News Release 11-09-055 Crystal River Special Inspection. (3 page(s), 1/20/2010)
- ML101180271 - E-Mail from Ogle to Masters, Talking Points for Crystal River Issue. (2 page(s), 1/20/2010)
- ML101180272 - E-Mail from Ogle to Masters, Crystal River. (1 page(s), 1/20/2010)
- ML101180311 - E-Mail from Ogle to Masters, Crystal River SIT Support. (1 page(s), 1/20/2010)
- ML101180312 - E-Mail from Ogle to Masters, Chairman's Periodic - Top 5 Topics. (1 page(s), 1/20/2010)
- ML101180313 - E-Mail from Kuntz to Craver, Crystal River Containment Repair Plan Update. (38 page(s), 3/19/2010)
- ML101180314 - E-Mail from Chou to Morrissey, CTR Level II Schedule. (2 page(s), 1/21/2010)
- ML101180315 - E-Mail from Lake to Franke, NRC Issue. (1 page(s), 1/22/2010)
- ML101180316 - E-Mail from Carrion to Lake, CR SIT NRC Questions. (1 page(s), 1/22/2010)
- ML101180317 - E-Mail from Chou to Carrion, NRC Issue. (2 page(s), 1/22/2010)
- ML101180318 - E-Mail form Chou to Franke, Crystal River 3 Concrete Repair Level 2 schedule. (1 page(s), 1/25/2010)
- ML101180319 - E-Mail from Chou to Powell, New NCR. (1 page(s), 1/25/2010)
- ML101180320 - E-Mail from Carrion to Lake, Recent High Level Schedule Info. (1 page(s), 1/26/2010)
- ML101190439 - E-Mail from Sykes to Wert, CR3 Concrete Delamination Repair Schedule. (1 page(s), 1/26/2010)
- ML101190440 - E-Mail from Lake to Masters, New NCR. (3 page(s), 1/27/2010)
- ML101190441 - E-Mail from Khanna to Khanna, Crystal River Information. (3 page(s), 10/8/2009)
- ML101190442 - E-Mail from Franke to R2DRSEB3, Talking Points for Crystal River issue. (4 page(s), 10/9/2009)
- ML101190443 - E-Mail from Franke to Fletcher, EB3 and SIT update. (1 page(s), 10/9/2009)
- ML101190444 - E-Mail from Chou to Zeller, Questions re: Summer Past Containment Concrete Work Activities. (1 page(s), 10/16/2009)
- ML101190445 - E-Mail from Carrion to Carrion, SIT Status Call. (1 page(s), 10/19/2009)
- ML101190446 - E-Mail from Sykes to Boyce, Telecon w/Progress Energy to Discuss Status of Activities at CR3S-November 5, 2009, 2pm. (1 page(s), 10/16/2009)
- ML101190447 - E-Mail from Lake to Khanna, CR-3 Reactor Building Design Model. (1 page(s), 11/11/2009)
- ML101190448 - E-Mail from Carrion to Lake, Background.doc. (2 page(s), 11/16/2009)
- ML101190449 - E-Mail from Chou to Herrin, SGR Inspection. (1 page(s), 1/20/2010)
- ML101190450 - E-Mail from Carrion to Lake, Process for NRC review of Root Cause Info. (2 page(s), 11/23/2009)