Home > NRC Library > ADAMS Public Documents
Transmittal of HI-STORM 100 Final Safety Analysis Report, Revision 8.
Accession Number: ML101090466
Date Released: Friday, April 23, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML101090394 - Transmittal of HI-STORM 100 Final Safety Analysis Report, Revision 8. (2 page(s), 4/1/2010)
- ML101090395 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. (20 page(s), 1/18/2010)
- ML101090396 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System - TOC. (10 page(s), 1/18/2010)
- ML101090397 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 1: General Description. (271 page(s), 1/18/2010)
- ML101090398 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 2: Principal Design Criteria. (223 page(s), 1/18/2010)
- ML101110022 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 3: Structural Evaluation. (327 page(s), 1/18/2010)
- ML101090499 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 4: Thermal Evaluation. (83 page(s), 1/18/2010)
- ML101110021 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 5: Shielding Evaluation. (268 page(s), 1/18/2010)
- ML101110036 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 6: Criticality Evaluation. (245 page(s), 1/18/2010)
- ML101110037 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 7: Confinement. (17 page(s), 1/18/2010)
- ML101110038 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 8: Operating Procedures. (129 page(s), 1/18/2010)
- ML101110039 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 9: Acceptance Criteria and Maintenance Program. (39 page(s), 1/18/2010)
- ML101110042 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 10: Radiation Protection. (66 page(s), 1/18/2010)
- ML101110043 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 11: Accident Analysis. (46 page(s), 1/18/2010)
- ML101110044 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 12: Operating Controls and Limits. (60 page(s), 1/18/2010)
- ML101110045 - Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System. Chapter 13: Quality Assurance. (5 page(s), 1/18/2010)