Home > NRC Library > ADAMS Public Documents
BLN SER Chapters 1 - 19 MASTER
Accession Number: ML093480159
Date Released: Tuesday, January 12, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML090900401 - Bellefonte, Units 3 and 4 Safety Evaluation Report With Open Items For Chapter 1, "Introduction And General Description of Plant." (33 page(s), 6/23/2009)
- ML091540376 - Bellefonte SER Chapter 2: Site Characteristics. (213 page(s), 9/4/2009)
- ML091590086 - Bellefonte SER Chapter 2 Figures Section 1 (2.5.1.1 thru 2.5.2-8) 5/27/09. (14 page(s), 9/4/2009)
- ML091590093 - Bellefonte Safety Evaluation Report Figures Section 2 (2.5.3-1 thru 2.5.4-7b) 5/27/09. (9 page(s), 9/4/2009)
- ML091590097 - BLN Safety Evaluation Report 2 Tables 5/27/09. (23 page(s), 9/15/2009)
- ML083440181 - BLN SER Chapter 3, "3.0 Design of Structures, Components, Equipment and Systems." (60 page(s), 10/29/2009)
- ML091190476 - Bellefonte SER Chapter 4.0, Reactor. (6 page(s), 6/10/2009)
- ML091260137 - Bellefonte Units 3 and 4 Safety Evaluation Report with Open Items for Chapter 5, "Reactor Coolant System and Connected Systems." (46 page(s), 6/23/2009)
- ML083390149 - BLN SER Chapter 7 Master, "Instrumentation And Controls." (6 page(s), 11/2/2009)
- ML091570002 - Bellefonte, Units 3 and 4 - Safety Evaluation Report With Open Items for Chapter 8, "Electric Power". (28 page(s), 9/9/2009)
- ML091120420 - Bellefonte, Units 3 & 4, SER Chapter 9, "Auxilary Systems." (70 page(s), 11/20/2009)
- ML091260128 - Bellefonte Units 3 and 4, Safety Evaluation Report with Open Items for Chapter 10, "Turbine Generator" - SER. (31 page(s), 6/23/2009)
- ML091330653 - Bellefonte, Safety Evaluation Report, Chapter 11, "Radioactive Waste Management". (34 page(s), 6/23/2009)
- ML091110669 - Bellefonte Units 3 and 4 Safety Evaluation Report with Open Items for Chapter 12, "Radiation Protection" - SER. (22 page(s), 6/23/2009)
- ML090750609 - Bellefonte Units 3 and 4 Safety Evaluation Report with Open Items for Chapter 13, "Conduct of Operations". (137 page(s), 9/10/2009)
- ML091120120 - SER - BELLEFONTE UNITS 3 AND 4 SAFETY EVALUATION REPORT WITH OPEN ITEMS FOR CHAPTER 14, "INITIAL TEST PROGRAMS". (38 page(s), 6/17/2009)
- ML092590516 - Bellefonte, Units 3 and 4, Safety Evaluation Report with Open Items for Chapter 15, "Accident Analysis." (25 page(s), 12/10/2009)
- ML091190268 - Bellefonte, Units 3 and 4, Safety Evaluation Report with Open Items for Chapter 16 " Technical Specifications". (11 page(s), 6/18/2009)
- ML091190346 - BLN QA Program Design, Chapter 17 from ISL Chapter Day Comments 5/29/09. (29 page(s), 6/17/2009)
- ML091190760 - Bellefonte SER Chapter 18 MASTER, Human Factors Engineering. (23 page(s), 8/26/2009)
- ML091110711 - Bellefonte Chapter 19, "Probabilistic Risk Assessment and Severe Accident Evaluation." (22 page(s), 6/19/2009)