Home > NRC Library > ADAMS Public Documents
FOIA/PA-2009-0198 - Resp 2 - Partial.
Accession Number: ML092100660
Date Released: Tuesday, August 18, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML092100650 - FOIA/PA-2009-0198 - Resp 2 - Partial. (8 page(s), 7/27/2009)
- ML081820785 - Letter to Rynas re Meeting Regarding GE-Hitachi Proposed Enrichment Facility. (3 page(s), 7/3/2008)
- ML081820775 - Letter to Weaver re Meeting Regarding GE-Hitachi Proposed Enrichment Facility. (3 page(s), 7/3/2008)
- ML081820794 - Letter to Dusenbury re Meeting Regarding GE-Hitachi Proposed Enrichment Facility. (3 page(s), 7/3/2008)
- ML081820809 - Letter to Ihnat re Meeting Regarding GE-Hitachi Proposed Enrichment Facility. (2 page(s), 7/3/2008)
- ML081820829 - Letter to Braswell re Meeting Regarding GE-Hitachi Proposed Enrichment Facility. (2 page(s), 7/3/2008)
- ML081820834 - Letter to O'Keefe re Meeting Regarding GE-Hitachi Proposed Enrichment Facility. (2 page(s), 7/3/2008)
- ML081820838 - Letter to Springer re Meeting Regarding GE-Hitachi Proposed Enrichment Facility. (2 page(s), 7/3/2008)
- ML081820843 - Letter to Frye re Meeting Regarding GE-Hitachi Proposed Enrichment Facility. (2 page(s), 7/3/2008)
- ML081920716 - GE-Hitachi Environmental Report. (37 page(s), 6/16/2008)
- ML081370443 - G20080350/LTR-08-0289/EDATS: SECY-2008-0311 - Ltr. Tammy G. Orr re: Submittal of White Papers Related to Licensing and Hearing Processes for Proposed Uranium Enrichment Facility (24 page(s), 5/9/2008)
- ML082110559 - 07/17/2008 Meeting Slides, "GE-Hitatchi Enrichment Facility Construction Inspection," GEH Public Meeting (Enclosure 5). (14 page(s), 7/17/2008)
- ML082120148 - 07/17/2008 General Electric-Hitachi, Licensing Process Public Meeting. (4 page(s), 7/17/2008)
- ML063330605 - SECY-07-0031- Status of the SILEX Project Proposed by General Electric Nuclear (5 page(s), 2/9/2007)
- ML091660481 - C. Bernhart ltr., NOAA Fisheries, Southeast Region, re: Request for Information Regarding Endangered or Threatened Species and Critical Habitat Relevant to the Proposed General Electric-Hitachi Global Laser Enrichment Facility. (4 page(s), 6/18/2009)
- ML092100651 - E-mail to A. Kennedy from T. Johnson, Re: Environmental Review Issues. (1 page(s), 10/4/2007)
- ML092100652 - Letter to SECY from Tammy Orr Re: Submittal of White Papers Related to Licensing and Hearing Processes for Proposed Uranium Enrichment Facility. (21 page(s), 5/8/2008)
- ML092100653 - E-mail to A. Kennedy from T. Johnson, Re: Acceptance Review of Exemptions Request. (1 page(s), 12/11/2008)
- ML092100654 - Federal Register Notice, Re: Notice of Intent to Prepare an Environmental Impact Statement for Proposed General Electric-Hitachi Global Laser Enrichment Uranium Enrichment Facility. (2 page(s), 4/9/2009)
- ML092100655 - Letter to M. Tschiltz from A. Kennedy Re: GE-Hitachi Global Laser Enrichment Response to Request for Additional Information Related to Commencement of Construction. (2 page(s), 5/1/2009)
- ML092100656 - E-mail from T. Johnson to A. Kennedy, Re: Site Visit Collection Plan. (17 page(s), 5/4/2009)
- ML092100657 - E-mail to D. Dorman and M. Tschiltz from M. Weber, Re: GE-Hitachi Open House in Wilmington. (2 page(s), 5/18/2009)
- ML092100658 - Technical Update of Hydrogeological and Groundwater Quality Conditions in the Northwest Site Area. (66 page(s), 10/30/1997)
- ML092100659 - Fourth Quarter 1997 Groundwater Monitoring Report for the FMO/FMOX Building Area General Electric Company. (28 page(s), 6/15/1998)
- ML092110739 - RTI Document No. 6448-012/005/01F, "Technical Update of Groundwater Contamination Beneath the FCO Building Cleaning Room Area General Electric - Wilmington, NC". (21 page(s), 9/8/1998)
- ML092110745 - RTI Report No. 0209739.000.005/001/01F, "Northwest Site Area 2004-2005 Monitoring Report General Electric/Global Nuclear Fuel Site Wilmington, North Carolina". (148 page(s), 4/25/2006)
- ML092110740 - Application for Radioactive Materials License 065-0317-3 (Items 8 Through 15) for the Wilmington Field Service Center, Rev. 6. (50 page(s), 12/7/2007)
- ML092110741 - GLE Environmental Report, Section 4.12 - Public and Occupational Health, Annual and Committed Dose Equivalents for Exposures to the Nearest Resident from Gaseous Effluents, Draft Dated 03/31/2008. (1 page(s), 3/31/2008)
- ML092110742 - GLE Environmental Report - Section 4.12 - Public and Occupational Health, Annual and Committed Dose Equivalents for Exposures to the MEI from Gaseous Effluents, Draft Dated 03/31/2008. (1 page(s), 3/31/2008)
- ML092151045 - May 8, 2008, Ltr. re: GE-Hitachi Nuclear Energy - Submittal of White Papers Related to Licensing and Hearing Processes for Proposed Uranium Enrichment Facility. (21 page(s), 5/8/2008)
- ML092151046 - Email Re: Population Info for NHCO w/Attached: Television; Radio; Newspapers. (9 page(s), 6/9/2008)
- ML092151047 - Email Re: NCDENR July Meeting Intro with Attached. (2 page(s), 6/25/2008)
- ML092151048 - Email to U.S. Army Re: GE-Hitachi Enrichment July Meeting Intro W/Attached. (2 page(s), 6/26/2008)
- ML092151049 - Email to New Hanover Soil and Water Conservation District Re: Meeting with NRC re: Proposed GE-Hitachi Uranium Enrichment Facility w/Attached GE-Hitachi Enrichment July Meeting Intro New Hanover. (2 page(s), 6/26/2008)
- ML092151050 - Email Re: Meeting with NRC re: Proposed GE-Hitachi Uranium Enrichment Facility w/Attached GE-Hitachi Enrichment July Meeting Intro New Hanover. (3 page(s), 6/26/2008)
- ML092151051 - Email Re: Scoping Meeting for NRC Permitting at GE-Hitachi Plant. (2 page(s), 6/26/2008)
- ML092151052 - 07/17/2008 Meeting Notice, Public Meeting to Discuss U.S. Nuclear Regulatory Commission's Licensing Process for GE-Hitachi's Proposed Uranium Enrichment Facility in Wilmington, NC. (4 page(s), 7/2/2008)
- ML092151053 - Email Re: Telecom with Developer. (1 page(s), 7/15/2008)
- ML092151054 - Email Re: Additional Wilmington Environmental Contacts. (2 page(s), 7/21/2008)
- ML092151055 - Email Forwarding Information on Construction. (2 page(s), 7/21/2008)
- ML092151056 - Email from Cape Fear River Watch, Inc. Re: Meeting with U.S. Nuclear Regulatory Commission Regarding GE-Hitachi's Proposed Uranium Enrichment Facility Near Wilmington, NC. (4 page(s), 7/28/2008)
- ML092151057 - Email Re: GEH - Sledge Forest - FYI. (1 page(s), 7/29/2009)
- ML092151058 - Email to GE-Hitachi Nuclear Energy Re: Mtg. with Cape Fear River Keeper. (1 page(s), 8/7/2008)
- ML092151059 - Email Re: GEH (Silex) Phone Call with Julie Olivier. (1 page(s), 8/29/2008)
- ML092151060 - Email Re: GE-Hitachi Proposed Uranium Enrichment Facility. (1 page(s), 8/29/2008)
- ML092151061 - GEH GLE Request for Exemption From Requirements Governing Commencement of Construction. (12 page(s), 12/8/2008)
- ML092151062 - Letter from State of NC to Global Nuclear Fuel-Americas,. LLC Re: Amendment No. 93 to Radioactive Materials License No. 065-0317-1. (5 page(s), 3/20/2009)
- ML092151063 - Inactive Hazardous Waste Sites Priority List General Electric Company/Wilmington, Wilmington, New Hanover County. (2 page(s), 4/16/2009)
- ML092250488 - U.S. Nuclear Regulatory Commission Information Collection Plan for the General Electric - Hitachi Global Laser Enrichment Facility (GLE) Environmental Site Visit. (125 page(s), 5/1/2009)
- ML092110761 - Scoping Meeting Key Messages. (1 page(s), 5/19/2009)
- ML092110762 - Coordinates of Features Not Considered Security Sensitive Information. (2 page(s), 6/30/2009)
- ML092110763 - RTI Memo to File Addendum: Documentation of Radiation Dose Modeling. (1 page(s), 6/3/2009)
- ML092110764 - GE-Hitachi Global Laser Enrichment Submittal of Additional Information Related to NRC Review of GLE Environmental Report. (13 page(s), 6/8/2009)
- ML092110765 - GNF-A Wilmington, NC - COMPLY Inputs. (4 page(s), 6/22/2009)
- ML092110790 - GNF-A Wilmington, NC Off-Site Public Dose COMPLY Results. (1 page(s), 6/22/2009)
- ML092110791 - Radio Announcement for the GE- Hitachi Scoping Meeting. (1 page(s), 7/27/2009)
- ML092110792 - Article Announcement for the GE- Hitachi Scoping Meeting. (1 page(s), 7/27/2009)
- ML092110793 - GE-Hitachi Global Enrichment LLC (GLE) Environmental Report for the Commercial Facility Administrative Acceptance Review Comments. (1 page(s), 3/31/2009)
- ML092110794 - Letter from PM to Mr. Clements. (1 page(s), 7/27/2009)
- ML092110797 - Assumptions Used for Proposed GLE Facility Construction Air Emissions Estimates. (9 page(s), 7/27/2009)
- ML092110798 - Chart - Construction Phase. (1 page(s), 7/27/2009)
- ML092110799 - Unpaved Road Fugitive Dust Emissions Factor Calculation for Proposed GLE Facility Construction Phase. (1 page(s), 7/27/2009)
- ML092110800 - Paved Road Fugitive Dust Emission Factor Calculation for Proposed GLE Facility Construction Phase. (1 page(s), 7/27/2009)
- ML092110801 - Off-Road Emission Factors for Access Road Construction and Site Preparation Phases. (2 page(s), 7/27/2009)
- ML092220620 - Off-Road Emission Factors for GLE Building Construction Phase. (2 page(s), 7/27/2009)
- ML092220621 - On-Site Automobile and Truck Emissions for Construction Phase. (1 page(s), 7/27/2009)
- ML092220622 - Draft FRN: NRC Extension of Public Scoping Period for the EIS for the Proposed GEH Global Laser Enrichment Facility. (3 page(s), 7/27/2009)
- ML092220624 - Map, Explanation. (1 page(s), 7/27/2009)
- ML092220625 - Map, Stack Distance. (4 page(s), 7/27/2009)
- ML092220626 - Drawing, FMO Stack Distance. (1 page(s), 7/27/2009)
- ML092220627 - Drawing, FMO 2 Stack. (1 page(s), 7/27/2009)
- ML092220628 - Drawing, GLE Stack. (1 page(s), 7/27/2009)