Home > NRC Library > ADAMS Public Documents
Comanche Peak, Units 3 and 4 - First Partial Response to Request for Additional Information re the Environmental Review of the Combined License Application.
Accession Number: ML092090654
Date Released: Wednesday, August 12, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML092090653 - Comanche Peak, Units 3 and 4 - First Partial Response to Request for Additional Information re the Environmental Review of the Combined License Application. (27 page(s), 7/20/2009)
- ML092090669 - Project Review Under Section 106 of the National Historical Preservation Act on Draft Report: Archeological Survey Report on the Luminant Proposed New Water Exchange Line Project, Comanche Peak Nuclear Power Plant, Hood and Somervell Counties, Texas. (1 page(s), 6/10/2009)
- ML092090674 - Request for Review and Comment on Proposed Project Regarding Environmental Report for Application on Behalf of TXU Generation Co. LP. (1 page(s), 1/24/2007)
- ML092090678 - Impacts of Comanche Peak, Units 3 and 4 Operations on Downstream Water Quality. (12 page(s), 4/30/2009)
- ML092090683 - Impacts of Comanche Peak, Units 3 and 4 Operations on Downstream Water Quality. (12 page(s), 4/30/2009)
- ML092090690 - Calculation TXUT-001-FSAR-2.3-CALC-022, Revision 0, "CPNPP Short-Term Atmospheric Dispersion Calculation." (123 page(s), 12/31/2007)
- ML092090691 - TXUT-001-PR-016, Revision 1, "CPNPP Humidity Comparison with Dallas Forth Worth and Mineral Wells Airport Data." (10 page(s), 5/4/2009)
- ML092090693 - Letter Responding to 11/13/2006 Correspondence Requesting Information Regarding TXU Power Inc.'s Proposed Construction and Operation of a New Nuclear Power Generation Facility at the Existing Comanche Peak Site. (2 page(s), 12/4/2006)
- ML092090695 - Letter in Response to Review Request, dated 06/05/2007, for Potential Impacts to Rare, Threatened and Endangered Species from the Proposed Addition to the Comanche Peak Station. (3 page(s), 8/3/2007)
- ML092090699 - Calculation TXUT-001-ER-5.3-CALC-005, Rev. 2, "Plume Characteristics of Proposed New Cooling Towers at Comanche Peak." (35 page(s), 3/18/2009)
- ML092090713 - Calculation TXUT-001-ER-3.8-CALC-009, Rev. 0, "Transportation Routing." (51 page(s), 4/11/2008)
- ML092090714 - Calculation TXUT-001-ER-3.8-CALC-008, Rev. 1, "CPNNP Transportation Analysis." (52 page(s), 3/20/2009)