Home > NRC Library > ADAMS Public Documents
Transmittal of NEDO-33201, Revision 4, "ESBWR Design Certification Probabilistic Risk Assessment."
Accession Number: ML092030211
Date Released: Thursday, July 30, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML092030199 - Transmittal of NEDO-33201, Revision 4, "ESBWR Design Certification Probabilistic Risk Assessment." (2 page(s), 6/26/2009)
- ML092030218 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Cover through Table of Contents. (4 page(s), 6/26/2009)
- ML092030224 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 1, Introduction. (9 page(s), 6/26/2009)
- ML092030225 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 2, Initiating Events. (43 page(s), 6/26/2009)
- ML092030226 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 3, Accident Sequence Analysis. (128 page(s), 6/26/2009)
- ML092030227 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 4, Steam Analysis. (6826 page(s), 6/26/2009)
- ML092030228 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 5, Data Analysis. (825 page(s), 6/26/2009)
- ML092030231 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 6, Human Reliability Analysis. (22 page(s), 6/26/2009)
- ML092030232 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 7, Core Damage Frequency Quantification. (117 page(s), 6/26/2009)
- ML092030233 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 8, Containment Performance. (52 page(s), 6/26/2009)
- ML092030235 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Appendix 8A, Quantification of the Level 2 PRA Model. (275 page(s), 6/26/2009)
- ML092030236 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Appendix 8B, Representative Sequence Results. (65 page(s), 6/26/2009)
- ML092030240 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Appendix 8C, Containment Penetration Screening Analysis. (8 page(s), 6/26/2009)
- ML092030241 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Appendix 8D, Introduction. (30 page(s), 6/26/2009)
- ML092030242 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 9, Source Terms. (21 page(s), 6/26/2009)
- ML092030243 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 9A, Representative Sequences. (179 page(s), 6/26/2009)
- ML092030244 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 10, Consequence Analysis. (29 page(s), 6/26/2009)
- ML092030247 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 11, Uncertainty and Sensitivity Analysis. (127 page(s), 6/26/2009)
- ML092030248 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Appendix 11A, Thermal Hydraulic Sensitivity. (54 page(s), 6/26/2009)
- ML092030249 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Appendix 11B, Focus Sensitivities - Top 100 Cutsets. (516 page(s), 6/26/2009)
- ML092030251 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 12, Probabilistic Fire Analysis. (235 page(s), 6/26/2009)
- ML092030250 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Appendix 12A, List of Tables. (82 page(s), 6/26/2009)
- ML092030267 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 13, Probabilistic Flood Analysis. (226 page(s), 6/26/2009)
- ML092030268 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 14, High Wind Risk. (290 page(s), 6/26/2009)
- ML092030269 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 15, Seismic Margins Analysis. (65 page(s), 6/26/2009)
- ML092030270 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 16, Shutdown Risk. (162 page(s), 6/26/2009)
- ML092030271 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 17, Results Summary. (94 page(s), 6/26/2009)
- ML092030272 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 18, PRA Insights Affecting ESBWR Design. (25 page(s), 6/26/2009)
- ML092030273 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 19, Reliability and Maintainability. (15 page(s), 6/26/2009)
- ML092030274 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 20, Regulatory Treatment of Non-Safety Systems. (41 page(s), 6/26/2009)
- ML092030275 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 21, Severe Accident Management. (78 page(s), 6/26/2009)
- ML092030276 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 21.4, Containment and BIMAC-Device Performance Against Ex-Vessel Steam Explosions (EVE). (29 page(s), 6/26/2009)
- ML092030280 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 21.5, Containment and BIMAC Performance Against Basement Melt Penetration (BMP). (40 page(s), 6/26/2009)
- ML092030281 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 21.6, Conclusions Summarized in the Form of CPETS. (6 page(s), 6/26/2009)
- ML092030282 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 21A, Verification of the Transient CLCH Model. (56 page(s), 6/26/2009)
- ML092030283 - NEDO-33201, Revision 4, "ESBWR Certification Probabilistic Risk Assessment," Section 22, ESBWR PRA Changes. (1 page(s), 6/26/2009)