Home > NRC Library > ADAMS Public Documents
First partial response to FOIA request for documents.App B forwarded & also being made available at PDR.App A available at PDR.Records also being made available at LPDR for plant.
Accession Number: ML082390697
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082610149 - First partial response to FOIA request for documents.App B forwarded & also being made available at PDR.App A available at PDR.Records also being made available at LPDR for plant. (3 page(s), 5/26/1988)
- ML20151H171 - Notice of granting exemption from calendar requirements as applied to radiation exposure assessment program. (2 page(s), 12/31/1981)
- ML082390698 - Summarizes current scheduling outlook for next 10 cases & measures taken to minimize or eliminate schedule impacts. (4 page(s), 9/14/1981)
- ML20151H164 - Approves 811028 request for exemption under 10CFR20.501 from calendar quarter as applied to radiation exposure assessment program. (8 page(s), 12/31/1981)
- ML20151H168 - Safety evaluation supporting exemption from calendar requirements as applied to radiation exposure assessment program. (1 page(s), 12/31/1981)
- ML082390699 - Forwards listing of NRC estimated completion dates for OL applicants listed in Bevill Rept.Dates represent collective NRC judgement. (3 page(s), 1/18/1982)
- ML20151H883 - Requests all technical staff be advised to use listed procedures for future contract actions. (3 page(s), 9/16/1983)
- ML20151H228 - Requests review of util technical program,especially method of resolution of errors & open items identified in independent design verification program & interfaces between two programs. (1 page(s), 4/13/1982)
- ML20151H053 - Forwards responses to 810408 ltr to President Reagan re concerns about effects of facility low level emissions,waste storage,emergency plan inadequacy & proximity to earthquake fault.VA Hill marked-up responses included. (8 page(s), 8/20/1981)
- ML20151H879 - Forwards std order for DOE work to transfer funds from "LWR Sys Corrosion" to "Diablo Canyon Verification." (13 page(s), 9/28/1983)
- ML20151H135 - Std order for DOE work: "Review of Pumps & Valve Inservice Testing Program for OL Plants," issued to INEL.Statement of work encl. (7 page(s), 11/9/1981)
- ML082390696 - Summarizes current scheduling outlook for next 10 cases & measures taken to minimize or eliminate scheduling impacts. Concurrence requested on forthcoming biweekly repts.Plants requiring ofc level attention listed. (4 page(s), 10/2/1981)
- ML082390700 - Forwards list of casework open issues for wk ending 820122, per 811120 request.Only Category 2 & 3 open issues listed for plants having Bevill decision dates more than 3 months away. (14 page(s), 1/28/1982)