Systematic assessment of licensee performance notes re facility evaluation for Aug 1979-Jul 1980.
Accession Number: ML082180535
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082180534 - Addl response to FOIA request for 19 categories of info re nuclear reactor events & safety problems.Forwards documents listed in App A.Documents in App B completely withheld (ref FOIA Exemption 5). (9 page(s), 7/12/1982)
- ML082180538 - Systematic assessment of licensee performance notes re facility evaluation for Aug 1979-Jul 1980. (6 page(s), 7/31/1980)
- ML20027A749 - Forwards "Engineering Evaluation of Salt Svc Water Sys Flow Blockage at Pilgrim Nuclear Power Station by Blue Mussels (Mytilus Edilus)." Further recommendations re sys fouling by aquatic organisms not needed. (2 page(s), 3/18/1982)
- ML20027A750 - "Engineering Evaluation of Salt Svc Water Sys Flow Blockage at Pilgrim Nuclear Power Station by Blue Mussels (Mytilus Edilus)." (14 page(s), 3/31/1982)
- ML20027A787 - Advises that engineering evaluation of saltwater sys flow blockage by blue mussels indicates surveillance requirements in Tech Specs are not sufficient to demonstrate sys operability. (3 page(s), 5/6/1982)
- ML20064K308 - Discusses licensee responses to NRC request to commit to interim position re Generic Item B-24:venting & purging containments while at full power.Plants meet interim position & existing TACs should be closed out. (10 page(s), 8/25/1980)
- ML20064K666 - Std order for DOE work: "Program for Cost Estimation for Proposed Safety Requirements," issued to ID Operations Ofc. Statement of work encl. (6 page(s), 3/12/1981)
- ML20064K692 - Discusses review of util response re insp rept unresolved item identified during post-tensioning fuel pool girders. Capacity of anchorage sys is capable of meeting design requirements.Unresolved item can be closed. (2 page(s), 3/24/1981)
- ML20064K696 - Discusses actions proposed as result of boric acid corrosion damage of stud bolts & piping at PWR plants.IE proposal & schedule for actions will be discussed at 810409 meeting in Bethesda,MD. (3 page(s), 4/2/1981)
- ML20064K749 - Requests that regions confirm licensee submittal of rept for satisfactory implementation of Item 4 of IE Bulletin 79-26, Revision 1. (1 page(s), 5/18/1981)
- ML20064K763 - Supports efforts in resolving purge valve leakage & operability issues.Incorporation of leak testing position into Tech Specs should assure leakage integrity of containment. (2 page(s), 6/9/1981)
- ML20064K766 - Provides results of discussion w/licensee re apparent problem w/proper sealing of containment purge valves. Licensee estimated that excessive leakage condition occurred at frequency of one time for every five valve cycles. (2 page(s), 10/27/1978)
- ML20064K770 - Forwards proposed IE bulletin identifying potential safety concern re leakage of reactor bldg purge valves. (5 page(s), 3/20/1981)
- ML20064K797 - Comments on proposed IE bulletin re leakage of reactor bldg purge valves.Issuance not merited for reasons indicated. Generic Issues B-20 & B-24 provide assurance of increased surveillance testing & reduced excessive leakage. (2 page(s), 7/1/1981)
- ML20064K818 - Forwards special IE Insp Rept 50-368/81-17 on 810514-16.No noncompliance noted. (1 page(s), 7/17/1981)
- ML20064K837 - Forwards draft suppl to IE Bulletin 81-02, "Failure of Gate Type Valves to Close Against Differential Pressure," for review & comment. (2 page(s), 7/23/1981)
- ML20064L123 - Comments on 811218 corrections to facility assessment contained in NUREG-0834 re hearings & discussion of systematic assessment of license performance.Revision to NUREG inappropriate.Issue closed. (1 page(s), 1/4/1982)
- ML20064L125 - Forwards performance element summary for Jul 1979-June 1980 in response to ASLB request for testimony on systematic assessment of license performance in general & facility assessment in particular. (2 page(s), 12/18/1981)
- ML20064L242 - Forwards std order for DOE work: "Evaluation of TMI-1 Steam Generator Corrosion." (2 page(s), 4/8/1982)
- ML20064L245 - Std order for DOE work: "Evaluation of TMI-1 Steam Generator Corrosion," issued to BNWL. (1 page(s), 4/8/1982)
- ML20064L266 - Discusses info available re unit steam generators.Trip repts,status updates & notebooks of info on tube fabrication,identification & operating history encl.W/o encl. (2 page(s), 4/5/1982)
- ML20064L323 - Forwards diesel generator interim reliability program for operating plants & proposed Tech Specs. (4 page(s), 5/6/1982)
- ML20064L327 - "Diesel Generator Interim Reliability Program for Operating Plants." (22 page(s), 5/6/1982)
- ML20064L332 - Proposed Tech Specs re electrical power sys. (11 page(s), 5/6/1982)
- ML20064L337 - Comments on RCS insps & requalification program subsequent to sulfur restart.More thorough characterization of seal ring destructive exam necessary. (2 page(s), 5/17/1982)
- ML20064L340 - Recommends formal review of facility steam generator corrosion problem.Detailed discussion of rationale for request encl. (5 page(s), 5/19/1982)
- ML20064L360 - Forwards procedures for screening operational data, particularly LERs received after 820501.Submittal replaces procedures issued by 810429 & 820315 memos. (15 page(s), 4/23/1982)
- ML20064L381 - Operating Reactor Event Memo 82-01 re 810810 reactor scram w/water hammer event.Study of Unresolved Safety Issue A-1 shows no other water hammer events in BWR isolation condensers. (7 page(s), 5/25/1982)
- ML20064L411 - Discusses facility steam generator tube review.Meeting w/ licensee to discuss details of procedures to be followed proposed.NRC will develop complimentary independent program intended to verify repair process. (2 page(s), 6/4/1982)
- ML20064L472 - Defines Div of Engineering responsibilities & interfaces to assure efficient & high quality review of licensee proposal for repairing TMI steam generator tubes. (2 page(s), 6/14/1982)
- ML20065K699 - Forwards General Public Utils 820407 News Release 45-82 discussing suspected cause of TMI-1 steam generator tube degradation problem & proposed repairs.Repairs estimated to be completed by Oct 1982. (8 page(s), 4/20/1982)
- ML20065K715 - Forwards "Cost of Upgrading Capability to Isolate LPWR Main Feedwater Sys in Event of Breaks Inside Containment," final rept,in response to statement of work in TE Murley 810616 ltr re INEL technical assistance to NRR. (1 page(s), 4/14/1982)
- ML20065K724 - "Cost of Upgrading Capability to Isolate LPWR Main Feedwater Sys in Event of Breaks Inside Containment," final rept,per statement of work for DOE Work Order 20-81-165, "Program for Cost Estimation for Proposed Safety Requirements." (15 page(s), 3/19/1982)
- ML20065K736 - Trip rept of 820207 visit to NRR in Bethesda,MD & 820208-10 site visit re installation of 10-inch automatic isolation valve in main feedwater sys.Spec 6750-M-253 for nuclear carbon steel gate,globe & check valves & related info encl. (47 page(s), 3/22/1982)
- ML20065K746 - Forwards list of generic concerns & implications associated w/Ginna 820125 steam generator tube rupture event per NUREG-0909,in response to 820503 memo. (8 page(s), 5/21/1982)
- ML20065K750 - Forwards std order for DOE work, "Evaluation of TMI-1 Steam Generator," issued to BNWL.Period of performance extended to 821015 w/no addl cost to NRC. (1 page(s), 6/14/1982)
- ML20065K755 - Std order for DOE work: "Evaluation of TMI-1 Steam Generator," issued to BNWL. (1 page(s), 6/14/1982)
- ML20065K758 - "LER Output on All 1981 Events Categorized As A,B,C,D or E," computer printout. (486 page(s), 6/21/1982)
- ML20065K764 - Oral presentation of "New Trends in Evaluation & Implementation of Safety-Related Operating Experience." (13 page(s), 7/12/1982)
- ML20065K771 - Systematic assessment of licensee performance notes re facility evaluation for 790101-800819. (8 page(s), 8/19/1980)
- ML20065K777 - Systematic assessment of licensee performance notes re facility evaluation for Sept 1979-Aug 1980. (16 page(s), 8/31/1980)
- ML20065K780 - Systematic assessment of licensee performance notes re facility evaluation for Apr 1979-Mar 1980. (6 page(s), 3/31/1980)
- ML20065K786 - Systematic assessment of licensee performance notes re facility evaluation for Apr 1979-Mar 1980. (6 page(s), 3/31/1980)
- ML20065K790 - Systematic assessment of licensee performance notes re facility evaluation for May 1979-Apr 1980. (7 page(s), 4/30/1980)
- ML20065K796 - Systematic assessment of licensee performance notes re facility evaluation for Nov 1979-Oct 1980. (15 page(s), 10/30/1980)
- ML20065K801 - Systematic assessment of licensee performance notes re facility evaluation for Dec 1979-Nov 1980. (9 page(s), 11/30/1980)
- ML20065K804 - Systematic assessment of licensee performance notes re facility evaluation for 1980. (7 page(s), 12/31/1980)
- ML20065K810 - Systematic assessment of licensee performance notes re facility evaluation for Feb 1980-Oct 1981. (5 page(s), 1/31/1981)
- ML20065K813 - Systematic assessment of licensee performance notes re facility evaluation for Aug 1979-Jul 1980. (7 page(s), 7/31/1980)
- ML20065K820 - Systematic assessment of licensee performance notes re facility evaluation for 790901-800901. (10 page(s), 9/1/1980)
- ML20065K829 - Systematic assessment of licensee performance notes re facility evaluation for Aug-Dec 1980. (10 page(s), 12/31/1980)
- ML20065K835 - Systematic assessment of licensee performance notes re facility evaluation for 790415-800415. (8 page(s), 4/15/1980)
- ML20065K837 - Systematic assessment of licensee performance notes re facility evaluation for Sept 1979-Aug 1980. (8 page(s), 8/31/1980)
- ML20065K843 - Systematic assessment of licensee performance notes re facility evaluation for May 1979-Apr 1980. (6 page(s), 4/30/1980)
- ML20065K846 - Systematic assessment of licensee performance notes re facility evaluation for Sept 1979-Aug 1980. (5 page(s), 8/31/1980)
- ML20065K854 - Systematic assessment of licensee performance notes re facility evaluation for Jul 1979-June 1980. (9 page(s), 6/30/1980)
- ML20065K858 - Systematic assessment of licensee performance notes re facility evaluation for Jul 1979-June 1980. (8 page(s), 6/30/1980)
- ML20065K865 - Systematic assessment of licensee performance notes re facility evaluation for Aug 1979-Jul 1980. (13 page(s), 7/31/1980)
- ML20065K875 - Systematic assessment of licensee performance notes re facility evaluation for Oct 1979-Sept 1980. (9 page(s), 9/30/1980)
- ML20065K879 - Forwards draft IE bulletin on channel independence in ESFs actuation sys for OMB clearance.Specific items listed in Part II of app to draft NRC Manual Chapter 0213 discussed. Expedited review & OMB clearance requested. (7 page(s), 5/28/1981)
- ML20065K883 - Forwards IE Circulars 80-15 & 81-10,Generic Ltr 81-21 & IE Info Notice 79-13,in response to 810630 request re issuance of IE bulletins concerning steam voids & events at foreign or domestic BWR. (2 page(s), 7/29/1981)
- ML20065K888 - NRC operations ctr usage chart re events at facilities. (1 page(s), 7/12/1982)
- ML20065K895 - Forwards questions on licensee performance rating process for use in preparing for systematic assessment of licensee performance briefing.Draft responses dtd 810904 encl. (18 page(s), 8/28/1981)
- ML20065K900 - Forwards SJ Chilk 810923 staff requirements memo re 810922 briefing on systematic assessment of licensee performance rept.Excerpts of 810922 briefing transcript re Commission guidance encl. (9 page(s), 10/1/1981)
- ML20065K903 - Forwards Commission guidance for future conduct of licensee assessment process per systematic assessment of licensee performance program.Commission should be advised of progress. (4 page(s), 10/20/1981)
- ML20065K910 - Forwards revised description of responsibilities & functions of Div of Engineering & QA. (4 page(s), 2/19/1982)
- ML20065K913 - Forwards revised IE organizational charts & functional statements for review & comment.Reorganizations of 820104 & 25 will be incorporated in NUREG-0325. (7 page(s), 4/29/1982)
- ML20065K917 - Forwards draft IE Manual Chapter 0101 re IE organization & functions.Comments requested by 820624.Chapter will be included in Jul quarterly issue of changes to IE manual. (17 page(s), 6/10/1982)
- ML20065K923 - Forwards new IE organization chart,functional statements for new organizational units & list of proposed personnel assignments within new organization,per NJ Palladino 811008 memo.Functional statements for reactor sys specialists encl. (32 page(s), 12/14/1981)