- ML073250067 - FOIA/PA-2007-0299 - Resp 1 - Partial. (10 page(s), 11/16/2007)
- ML033360599 - EA-03-214, FirstEnergy Nuclear Operating Company, Confirmatory Order Modifying License (effective immediately). (11 page(s), 3/8/2004)
- ML051090552 - Notice of Violation and Proposed Imposition of Civil Penalty - $5,450,000; (NRC Office of Investigations Report No. 3-2002-006; NRC Special Inspection Report No. 05000346-02-008 (DRS)); Davis-Besse Nuclear Power Station. (22 page(s), 4/21/2005)
- ML052630149 - First Energy Nuclear Operating Co., Reply to a Notice of Violation: EA-03-025, EA-05-066, EA-05-067, EA-05-068, EA-05-069, EA-05-070, EA-05-071, EA-05-072. (26 page(s), 9/14/2005)
- ML071350034 - Submittal of Expert Witness Report Prepared by Roger J. Mattson. (99 page(s), 5/4/2007)
- ML070930162 - Report Prepared by Exponent Failure Analysis Association and Altran Solutions Corporation (Exponent) Regarding Reactor Pressure Vessel Waste at Davis-Besse. (5 page(s), 4/2/2007)
- ML071240299 - Response To Request for Clarification Regarding Report Prepared by Exponent Failure Analysis Associates and Altran Solutions Corporation Regarding Reactor Pressure Vessel Head Wastage at the Davis-Besse Nuclear Power Plant. (11 page(s), 5/2/2007)
- ML071240254 - Assessment of Exponent Report Project Number BN63097.001, "Review & Analyses of The Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," To Ensure Current Reactor Pressure Vessel Head Inspection Requirements Are Adequate To Prevent.... (9 page(s), 5/4/2007)
- ML071340325 - Anthony Alexander Ltr. re: Order Demand for Information (DFI). (5 page(s), 5/14/2007)
- ML071340333 - First Energy Nuclear Operating Company (FENOC) {Davis-Besse Nuclear Power Plant; Perry Nuclear Power Plant; Beaver Valley Nuclear Plant, Units 1 and 2} - Demand for Information. (7 page(s), 5/14/2007)
- ML071300409 - EN-07-028 - FirstEnergy Nuclear Operating Company; Beaver Valley Power Station, Units 1 and 2; Davis-Besse Nuclear Power Station; Perry Nuclear Power Plant. (2 page(s), 5/14/2007)
- ML071640480 - Cynthia Carpenter Ltr. re: Response to Demand for Information (DFI). (63 page(s), 6/13/2007)
- ML071780028 - Union of Concerned Scientists' (Petitioner's) Slides from June 18, 2007 Public Meeting with 2.206 Petition Review Board Re: Exponent Report on 2002 RPV Head Corrosion Event at Davis-Besse. (16 page(s), 6/18/2007)
- ML071830470 - Billie Pirner Garde Ltr. re: Request for a Transcript of the June 27, 2007 Public Meeting with FirstEnergy Nuclear Operating Co. Regarding Demand For Information. (2 page(s), 7/9/2007)
- ML071970444 - Beaver Valley, Davis-Besse & Perry - Supplemental Information Regarding the FirstEnergy Nuclear Operating Company (FENOC) Response to Demand for Information (EA-07-123). (12 page(s), 7/16/2007)
- ML072260039 - Commitments to be Confirmed by Order Modifying License (Effective Immediately). (14 page(s), 8/13/2007)
- ML072260025 - EN-07-048 - FirstEnergy Nuclear Operating Company, Notification of Significant Enforcement Action. (2 page(s), 8/14/2007)
- ML072260545 - Transmittal of Consent and Hearing Waiver Form. (2 page(s), 8/14/2007)
- ML072260535 - Confirmatory Order (Effective Immediately) FirstEnergy Nuclear Operating Company. (12 page(s), 8/15/2007)
- ML031080174 - Speech-03-010: "What's Communication Got to Do With It?" (10 page(s), 4/17/2003)
- ML053180151 - SRM-M051101 - Briefing on Implementation of the Davis-Besse Lessons Learned Task Fore Recommendations. (1 page(s), 11/14/2005)
- ML023020644 - Speech-02-027: Research: Strengthening the Foundation of the Nuclear Industry. (8 page(s), 10/29/2002)
- ML032940500 - Speech-03-024: "Practical Not Perfect" Honorable Jeffrey S. Merrifield Commissioner U.S. Nuclear Regulatory Commission at Nuclear Safety Research Conference Washington, D.C. October 21, 2003. (6 page(s), 10/21/2003)
- ML072070145 - Summary of June 27, 2007, Public Meeting Regarding FENOC's Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event. (12 page(s), 8/7/2007)
- ML071710346 - 06/27/2007 Revised Notice of Meeting with FirstEnergy to Discuss Response to NRC's 05/14/2007, Demand for Information Regarding FENOC's Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event. (9 page(s), 6/21/2007)
- ML071790596 - 06/27/2007 Slides from Public Meeting between NRC and FENOC Regarding Response to May 14, 2007, Demand for Information. (24 page(s), 6/27/2007)
- ML070860216 - FirstEnergy Nuclear Operating Company, Submittal of Exponent Failure Analysis Associates Report, "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event." (3 page(s), 3/20/2007)
- ML070860242 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Cover and Table of Contents. (18 page(s), 12/15/2006)
- ML070860248 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 1. Introduction, Purpose and Scope. (5 page(s), 3/15/2007)
- ML070860250 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 2. Principal Conclusions and Opinions. (15 page(s), 3/15/2007)
- ML070860253 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 3. Background. (16 page(s), 3/15/2007)
- ML070860256 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 4. The Davis-Besse March 2002 Event. (34 page(s), 3/15/2007)
- ML070860261 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 5. Worldwide Industry Response to CRDM and Other Alloy 600 Nozzle Cracking. (50 page(s), 3/15/2007)
- ML070860264 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 6. Boric Acid Wastage of Carbon Steel Components in US PWR Plants. (55 page(s), 3/15/2007)
- ML070860268 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 7. FENOC/Davis-Besse Response to CRDM Cracking and Boric Acid Corrosion Issues. (53 page(s), 3/15/2007)
- ML070860271 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 8. Stress Analysis and Crack Growth Rates for Davis-Besse CRDM Nozzles 2 and 3. (37 page(s), 3/15/2007)
- ML070860276 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 9. CFD Modeling of Fluid Flow in CRDM Nozzle and Weld Cracks and through Annulus. (68 page(s), 3/15/2007)
- ML070860280 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Section 10. The Unique Nature of the Davis-Besse Nozzle 3 Crack and the RPV Head Wastage Cavity. (29 page(s), 3/15/2007)
- ML070860281 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Appendix A, Finite Element Stress Analysis of Davis-Besse CRDM Nozzle 3 Penetration. (31 page(s), 3/15/2007)
- ML070860282 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Appendix B, Crack Driving Force and Growth Rate Estimates. (16 page(s), 3/15/2007)
- ML070860284 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Appendix C, CFD Analysis. (140 page(s), 3/15/2007)
- ML070860286 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Appendix D, Leak Rate vs. Crack Length Calculations. (12 page(s), 3/15/2007)
- ML070860288 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Appendix E, Fluid Jet Cutting of Davis-Besse RPV Head Materials. (9 page(s), 3/15/2007)
- ML070860289 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Appendix F, Ronald M. Latanision, Ph.D. (44 page(s), 3/15/2007)
- ML070860291 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Appendix G, Daniel B. Bullen, Ph.D., P.E. (13 page(s), 3/15/2007)
- ML070860293 - "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," Appendix H, Professor R.G. Ballinger. (16 page(s), 3/15/2007)
- ML070950293 - FENOC Submittal of 2/23/07 Letter from Nuclear Electric Insurance Limited (NEIL). (7 page(s), 4/4/2007)
- ML021130029 - Davis-Besse Confirmatory Action Letter Response - Root Cause Analysis Report. (184 page(s), 4/18/2002)
- ML033650298 - Confirmatory Action Letter Response - Revision 1 to Root Cause Analysis Report Regarding Reactor Pressure Vessel Head Degradation - Serial Number 1-1289. (186 page(s), 9/23/2002)
- ML071030138 - Davis-Besse, Submittal of February 23, 2007 letter from Nuclear Electric Insurance Limited. (7 page(s), 4/4/2007)
- ML071210042 - 2007/04/30 - David Geisen - Letter from Lisa B. Clark to Administrative Judges regarding status of Geisen hearing. (1 page(s), 4/30/2007)
- ML071210285 - G20070297 - 04/30/2007 David A. Lochbaum Ltr. Re: Petition Pursuant to 2.206 - Protection Against Control Rod Drive Mechanism (CRDM) Nozzle Leakage Fast Corrosion Scenario or More FirstEnergy Falsehoods. (5 page(s), 4/30/2007)
- ML071210427 - 2007/04/26 - David Geisen - Letter from Richard Poole to Lisa B. Clark regarding David Geisen Proceeding. (2 page(s), 4/26/2007)
- ML071240290 - 2007/05/04 - Davis Besse - Letter of 05/04/2007 to DOJ Regarding FENOC Exponent Report. (2 page(s), 5/4/2007)
- ML071240295 - 05/03/2007, Acknowledgement of Receipt of FENOC Response to Davis-Besse Exponent Failure Analysis Report. (4 page(s), 5/3/2007)
- ML071280385 - G20070318/LTR-07-0322 - Ltr. Representative Dennis J. Kucinich Re: 2.206 Petition Requesting the NRC Take Safety Related Actions to Ensure that Reactor Heads Do Not Degrade to the Point of Failure - Document Request - 2.206/FirstEnergy (4 page(s), 5/1/2007)
- ML071290054 - Davis-Besse - Response to NRC Request Regarding Report Prepared by Exponent Failure Analysis Associates and Altran Solutions Corporation Regarding Reactor Pressure Vessel Head Wastage. (11 page(s), 5/2/2007)
- ML071300245 - G20070297 - Letter to Mr. D. Lochbaum re: Protection Against Control Rod Drive Mechanism Nozzle Leakage Fast Corrosion Scenario or More FirstEnergy Falsehoods - Davis-Besse. (5 page(s), 5/18/2007)
- ML071340193 - G20070297 - David Lochbaum Ltr. re Supplement to Petition Pursuant to Section 2.206 - Protection Against Control Rode Drive Mechanism (CRDM) Nozzle Leakage Fast Corrosion Scenario or More FirstEnergy Falsehoods. (3 page(s), 5/10/2007)
- ML071340331 - Federal Register Notice - Demand for Information (DFI), Anthony Alexander, FirstEnergy Nuclear Operating Company. (7 page(s), 5/14/2007)
- ML071340379 - Press Release-07-061 - NRC Demands Information from First Energy Regarding Davis-Besse Nuclear Power Plant. (1 page(s), 5/14/2007)
- ML071380428 - G20070318/LTR-07-0322 - Safety Related Actions to Ensure Reactor Heads to Not Degrade - Letter to Honorable Dennis Kucinich from Luis Reyes. (2 page(s), 5/21/2007)
- ML071520343 - 06/18/2007 Notice of Meeting with Union of Concerned Scientists Re Davis-Besse Nuclear Power Station 10 CFR 2.206 Petition Concerning Protection Against Control Rod Drive Mechanism (CRDM) Nozzle Leakage Fast Corrosion Scenario. (5 page(s), 6/7/2007)
- ML071620212 - 06/27/2007 Notice of Meeting with FirstEnergy Regarding May 14, 2007 Demand for Information re: Davis-Besse. (9 page(s), 6/13/2007)
- ML071640348 - Y020070131 - Estimated Time it May Take for 7 Inches of PWR Upper Head Steel to Dissolve. (4 page(s), 5/22/2007)
- ML071790100 - Y020070131 - Letter Response to T. Gurdziel, Re: RPV Head Inspections and the Exponent Report (2 page(s), 6/27/2007)
- ML071800082 - 06/18/2007 Summary of Public Meeting with Union of Concerned Scientists (UCS) re: Petition for Enforcement Action Pursuant to 10 CFR 2.206 on Protection Against Control Rod Drive Mechanism Nozzle Leakage Fast Corrosion Scenario for Davis-Besse. (6 page(s), 7/13/2007)
- ML071840004 - 06/18/2007 Transcript of Meeting with Union of Concerned Scientists Requesting Action Under 10CFR2.206 Regarding Protection Against Control Rod Drive Mechanism Nozzle Leakage Fast Corrosion Scenario. (46 page(s), 6/18/2007)
- ML071870443 - G20070297 - Mr. David Lochbaum Ltr re: Davis-Besse - 2.206 - Protection Against CRDM Nozzle Leakage Fast Corrosion Scenario. (7 page(s), 7/12/2007)
- ML072270150 - Press Release-07-102 - NRC Issues Order to FirstEnergy Regarding Information Relevant to Regulatory Activities. (1 page(s), 8/15/2007)