Home > NRC Library > ADAMS Public Documents
General Electric Company - ESBWR Standard Plant Design - Revision 2 to Design Control Document Tier 2, Chapters 2 through 5, 7 through 15, 17, and 18.
Accession Number: ML063100232
Date Released: Wednesday, November 15, 2006
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML063100233 - General Electric Company - ESBWR Standard Plant Design - Revision 2 to Design Control Document Tier 2, Chapters 2 through 5, 7 through 15, 17, and 18. (4 page(s), 10/31/2006)
- ML063100236 - 26A6642AL, Rev 2, "ESBWR Design Control Document Tier 2 Chapter 3, Design of Structures, Components, Equipment, and Systems, Appendices 3A-3F". (193 page(s), 10/31/2006)
- ML063100238 - Revision 1 to Revision 2 Change List Appendix 3A. (7 page(s), 10/31/2006)
- ML063100240 - 26A6642AN, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 3, Design of Structures, Components, Equipment, and Systems Appendices 3G - 3L." (339 page(s), 10/31/2006)
- ML063100242 - Revision 1 to Revision 2 Change List - Appendix 3G. (5 page(s), 10/31/2006)
- ML063100244 - 26A6642BB, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 9 Auxiliary Systems Appendix 9A." (255 page(s), 10/31/2006)
- ML063100245 - ESBWR DCD Appendix 9A 22A6642BB Revision 1 to Revision 2 Change List. (2 page(s), 10/18/2006)
- ML063100247 - 26A6642BD, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 9, Auxiliary Systems, Appendix 9B." (30 page(s), 10/31/2006)
- ML063100248 - ESBWR DCD Appendix 9B 22A6642BD Revision 1 to Revision 2 Change List. (1 page(s), 10/3/2006)
- ML063100249 - Chapter 18 from Revision 1 to Revision 2 Change List, Section 18.1 HFE Overview. (13 page(s), 10/31/2006)
- ML063100251 - 26A6642AH, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 2, Site Characteristics." (31 page(s), 10/31/2006)
- ML063100253 - ESBWR DCD Chapter 2 - Site Characteristics 22A6642AH Revision 1 to Revision 2 Change List. (5 page(s), 10/27/2006)
- ML063100254 - 26A6642AP, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 4 Reactor." (282 page(s), 10/31/2006)
- ML063100257 - Chapter 4 from Revision 1 to Revision 2 Change List. (7 page(s), 10/31/2006)
- ML063100258 - 26A6642AR, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 5 Reactor Coolant System and Connected Systems." (154 page(s), 10/31/2006)
- ML063100260 - Chapter 5: From Revision 1 to Revision 2 Change List. (19 page(s), 10/24/2006)
- ML063100261 - 26A6642AW, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 7 Instrumentation and Control System." (393 page(s), 10/31/2006)
- ML063100262 - DCD Chapter 7 Rev 2, Revision 1 to Revision 2 Change List. (22 page(s), 10/31/2006)
- ML063100266 - 26A6642AX, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 8 Electric Power." (96 page(s), 9/30/2006)
- ML063100268 - Changes from Revision 1 to Revision 2, DCD Tier 2 Chapter 8. (18 page(s), 10/31/2006)
- ML063100271 - 26A6642AY, Rev 2, "ESBWR Design Control Document Tier 2, Chapter Auxiliary Systems." (288 page(s), 10/31/2006)
- ML063100272 - ESBWR DCD Chapter 9 - Auxiliary Systems 22A6642AY Revision 1 to Revision 2 Change List. (43 page(s), 10/24/2006)
- ML063100275 - 26A6642BF, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 10 Steam and Power Conversion System." (160 page(s), 10/31/2006)
- ML063100276 - Change from Revision 01 to Revision 02 DCD Tier 2, Chapter 10. (19 page(s), 10/31/2006)
- ML063100279 - 26A6642BH, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 11, Radioactive Waste Management." (126 page(s), 10/31/2006)
- ML063100280 - 22A6642BH, "ESBWR Design Control Document Tier 2, Revision 1 to Revision 2 Change List." (20 page(s), 10/31/2006)
- ML063100285 - 26A6642BJ, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 12 Radiation Protection." (179 page(s), 10/31/2006)
- ML063100287 - DCD Chapter 12 Revision 1 to Revision 2 Change List. (4 page(s), 10/31/2006)
- ML063100288 - 26A6642BL, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 13 Conduct of Operations." (29 page(s), 10/31/2006)
- ML063100292 - Chapter 13 from Revision 1 to Revision 2 Change List. (2 page(s), 10/26/2006)
- ML063100296 - 26A6642BN, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 14 Initial Test Program." (129 page(s), 10/31/2006)
- ML063100298 - Chapter 14 From Revision 1 to Revision 2 Change List. (2 page(s), 10/28/2006)
- ML063100299 - 26A6642BP, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 15 Safety Analyses." (472 page(s), 10/31/2006)
- ML063100301 - Chapter 15 Revision 1 to Revision 2 Change List. (8 page(s), 10/31/2006)
- ML063100303 - 26A6642BW, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 17, Quality Assurance." (36 page(s), 10/31/2006)
- ML063100305 - Chapter 17 from Revision 1 to Revision 2 Change List. (1 page(s), 10/31/2006)
- ML063100307 - 26A6642BX, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 18, Human Factors Engineering." (185 page(s), 10/31/2006)
- ML063100309 - 26A6642AJ, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 3, Design of Structures, Components, Equipment, and System Section 3.1 - 3.8." (306 page(s), 10/31/2006)
- ML063100313 - Revision 1 to Revision 2 Change List - Section 3.1. (33 page(s), 10/31/2006)
- ML063100314 - 26A6642AK, Rev 2, "ESBWR Design Control Document Tier 2, Chapter 3, Design of Structures, Components, Equipment, and Systems Sections 3.9 - 3.11." (126 page(s), 10/31/2006)
- ML063100315 - Revision 1 to Revision 2 Change List - Section 3.9. (7 page(s), 10/31/2006)