Battelle Memorial Institute D/N 070-00008, Columbus Closure Project Characterization and Final Status Survey Reports.
Accession Number: ML062890357
Date Released: Friday, October 20, 2006
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML062860606 - Battelle Memorial Institute D/N 070-00008, "Final Certification of Completion, Columbus Closure Project, West Jefferson North Site, West Jefferson, Ohio." dated June 29, 2006. (61 page(s), 6/29/2006)
- ML062860617 - Battelle Memorial Institute D/N 070-00008, DD-05-01, Technical Basis Document for Unrestricted Release of Sanitary Sewer Line Beneath Lake Battelle and the Lake Battelle Dam, Revision 0, Dated November 10, 2004. (3 page(s), 10/12/2006)
- ML062860623 - Battelle Memorial Institute D/N 070-00008, FSSR#28, Columbus Closure Project Characterization and Final Status Survey Report for the JN-1 A and C Foundation Excavation, Revision 1, Dated June 16. (37 page(s), 6/29/2006)
- ML062860625 - Battelle Memorial Institute D/N 070-00008, "Table 8, CCP Final Status Survey Report, ORISE Independent Verification Letter Reports, & NRC Inspection Reports. (5 page(s), 6/29/2006)
- ML062860629 - Battelle Memorial Institute D/N 070-00008, FSSR#31-35, Columbus Closure Project Characterization and Final Status Survey Report for JN-3 Cooling Waste Sewer Line East Section, Revision 1, Dated June. (34 page(s), 6/29/2006)
- ML062860635 - Battelle Memorial Institute D/N 070-00008, "FSSR#1, Characterization and Final Status Survey Report, JN-4 North Grounds Area." (36 page(s), 6/29/2006)
- ML062860636 - Battelle Memorial Institute D/N 070-00008, FSSR#2 Columbus Closure Project Characterization and Final Status Survey Report for Building JN-2, Revision 0, Dated November 2004. (4 page(s), 6/29/2006)
- ML062860638 - Battelle Memorial Institute D/N 070-00008, FSSR#5 Columbus Closure Project Characterization and Final Status Survey Report for Building NJ-6, Revision 1, Dated July 2004. (3 page(s), 6/29/2006)
- ML062860639 - Battelle Memorial Institute D/N 070-00008, FSSR#13 Columbus Closure Project Characterization and Final Status Survey Report for Active North Filter Bed- South Subsurface Sand Filter, Revision 0, Dated August 2005. (35 page(s), 6/29/2006)
- ML062860640 - Battelle Memorial Institute D/N 070-00008, FSSR#16 Columbus Closure Project Characterization and Final Status Survey Report for The Active North Filter Bed Discharge Line, Revision 1, Dated June 16, 2006. (98 page(s), 6/29/2006)
- ML062860641 - Battelle Memorial Institute D/N 070-00008, FSSR#7 Columbus Closure Project Characterization and Final Status Survey Report for the Remaining Areas Within the Filter Beds Including the Well. (63 page(s), 6/29/2006)
- ML062860642 - Battelle Memorial Institute D/N 070-00008, FSSR#8 Columbus Closure Project Characterization and Final Status Survey Report for The JN-2 Sanitation Line Section B an C, Revision 1, Dated June 16. (69 page(s), 6/29/2006)
- ML062860643 - Battelle Memorial Institute D/N 070-00008, FSSR#9 Columbus Closure Project Characterization and Final Status Survey Report for JN-1/4 Sanitary Sewer Line, Revision 1, Dated June 16, 2006. (41 page(s), 6/29/2006)
- ML062890060 - Battelle Memorial Institute D/N 070-00008, FSSR# 24, Columbus Closure Project Characterization and Final Status Survey Report for The Areas Surrounding and Including the Active Middle Filter Bed. (39 page(s), 6/29/2006)
- ML062900289 - Battelle Memorial Institute D/N 070-00008, FSSR#10 Columbus Closure Project Characterization and Final Status Survey Report for The Abandoned Middle Filter Bed, Revision 2, Dated June 16, 2006. (65 page(s), 6/29/2006)
- ML062900279 - Battelle Memorial Institute D/N 070-00008, FSSR#11 Columbus Closure Project Characterization and Final Status Survey Report for Manhole 7 to Manhole "A" Sewer Line, Revision 2, Dated June 16, 2006. (46 page(s), 6/29/2006)
- ML062900302 - Battelle Memorial Institute D/N 070-00008, FSSR#12 Columbus Closure Project Characterization and Final Status Survey Report for Active North Filter Bed - North Subsurface Sand Filter, Revision 2, Dated June 16, 2006. (64 page(s), 6/29/2006)
- ML062900254 - Battelle Memorial Institute D/N 070-00008, FSSR#14 Columbus Closure Project Characterization and Final Status Survey Report for Grids 33, 42, 50, 51, 52 and 61 of the Abandoned North Filter Bed, Revision 1, Dated June 16, 2006. (34 page(s), 6/29/2006)
- ML062900242 - Battelle Memorial Institute D/N 070-00008, FSSR#15 Columbus Closure Project Characterization and Final Status Survey Report for Manhole 7 to Manhole 8 sewer Line, Revision 2, Dated June 16, 2006. (51 page(s), 6/29/2006)
- ML062900228 - Battelle Memorial Institute D/N 070-00008, FSSR#19 Columbus Closure Project Characterization and Final Status Survey Report for The JN-2 Foundation Area and Sanitary Line, Revision 2, Dated June 16, 2006. (68 page(s), 6/29/2006)
- ML062910011 - Battelle Memorial Institute D/N 070-00008, FSSR#30 Columbus Closure Project Characterization and Final Status Survey Report for The JN-3 Cooling Waste Sewer Line - West Section, Revision 1, Dated June 16, 2006. (36 page(s), 6/16/2006)
- ML062910010 - Battelle Memorial Institute D/N 070-00008, FSSR#22 Columbus Closure Project Characterization and Final Status Survey Report for Remaining Land Areas Inside the WJN Site Restricted Area, Revision 1, Dated June 16, 2006. (58 page(s), 6/16/2006)
- ML062910008 - Battelle Memorial Institute D/N 070-00008, FSSR#20 Columbus Closure Project Characterization and Final Status Survey Report for The WJN Well House Building, Revision 1, Dated June 16, 2006. (68 page(s), 6/16/2006)
- ML062910005 - Battelle Memorial Institute D/N 070-00008, FSSR#23 Columbus Closure Project Characterization and Final Status Survey Report for Unaffected Land Areas Outside the WJN Site Fence Line, Revision 1, Dated June 16, 2006. (70 page(s), 6/16/2006)
- ML062910004 - Battelle Memorial Institute D/N 070-00008, FSSR#29 Columbus Closure Project Characterization and Final Status Survey Report for The JN-1 B Foundation Excavation, Revision 1, Dated June 16, 2006. (36 page(s), 6/16/2006)
- ML062910395 - Battelle Memorial Institute D/N 070-00008, FSSR#25, Columbus Closure Project Characterization and Final Status Survey Report for The JN1-4 Bog Area and SS-JN1-2 Outfall, Revision 1, Dated June 16, 2006. (39 page(s), 6/29/2006)
- ML062910434 - Battelle Memorial Institute D/N 070-00008, FSSR#27, Columbus Closure Project Characterization and Final Status Survey Report for The JN-1 South and East Grounds, Revision 1, Dated June 29, 2006. (34 page(s), 6/29/2006)
- ML062910444 - Battelle Memorial Institute D/N 070-00008, FSSR#26, Columbus Closure Project Characterization and Final Status Survey Report for The JN-2 Sanitation Line Section A, Revision 1, Dated June 16, 2006. (30 page(s), 6/16/2006)
- ML062910462 - Battelle Memorial Institute D/N 070-00008, FSSR#6, Columbus Closure Project Characterization and Final Status Survey Report for The JN-1B Fuel Pool, Transfer Canal, and Both the Inside and Outside. (75 page(s), 6/29/2006)
- ML062910486 - Battelle Memorial Institute D/N 070-00008, FSSR#4, Columbus Closure Project Characterization and Final Status Survey Report for the JN-3 Foundation Area, Revision 2, Dated June 16, 2006. (87 page(s), 6/29/2006)
- ML062910500 - Battelle Memorial Institute D/N 070-00008, FSSR#3, Columbus Closure Project Characterization and Final Status Survey Report for Building JN-3, Revision 0, Dated November 2004. (3 page(s), 6/29/2006)
- ML062890109 - Drawing 1, Rev 0, "Columbus Closure Project - West Jefferson North (WJN) Characterization and Final Status Survey Plan Final Site Grade - Final Certificate of Completion Documentation." Sheet 1 of 3. (1 page(s), 6/29/2006)
- ML062890111 - Drawing 3, Rev 0, "Columbus Closure Project - West Jefferson North (WJN) Characterization and Final Status Survey Plan Below Grade - Final Certification of Completion Documentation." Sheet 3 of 3. (1 page(s), 6/29/2006)
- ML062890114 - Drawing 2, Rev 0, "Columbus Closure Project - West Jefferson North (WJN) Characterization and Final Status Survey Plan Above Grade - Final Certification of Completion Documentation." Sheet 2 of 3. (1 page(s), 6/29/2006)