Home > NRC Library > ADAMS Public Documents
FOIA/PA-2005-0103 - Resp 1 - Final.
Accession Number: ML050900171
Date Released: Wednesday, April 6, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML050900173 - FOIA/PA-2005-0103 - Resp 1 - Final. (43 page(s), 3/29/2005)
- ML003683591 - WNP-2,TIA, Adequacy Of Method Used To Calculate Release From High-Pressure Core Spray Valves (6 page(s), 2/14/2000)
- ML003699062 - Waterford, TIA, Denial of Violation regarding Auditor Independence, MA6664 (7 page(s), 4/4/2000)
- ML003679361 - Task Interface Agreement (TIA 99-22) Farley Nuclear Plant Basis for Determining Target Sets for Security. Subject area does not constitutes a standalone target set. (2 page(s), 1/31/2000)
- ML003736721 - Shearon Harris, Unit 1 - TIA 99--028, Resolution of Pilot Fire Protection Inspection (18 page(s), 8/1/2000)
- ML003724473 - Kewaunee IR-00-007 Enclosure (5 page(s), 5/8/2000)
- ML010740339 - Monticello,TIA, Reportability of Reactor Core Isolation Cooling System Failures (6 page(s), 3/15/2001)
- ML003687703 - D. C. Cook - TASK INTERFACE AGREEMENT (TIA) 99-031- EVALUATION OF THE ACCEPTABILITY OF THE CLASSIFICATION AND FIELD INSTALLATION OF NON-SAFETY-RELATED CONTROL CABLES USED IN THE LOAD SHEDDING CIRCUITRY (TAC NOS. MA7376 AND MA7377) (7 page(s), 2/29/2000)
- ML003727408 - Palisades, TIA, Re use of a non-environmentally-qualified cable in the Safety Injection System and Interpretation of 10 CFR 50.49 (3 page(s), 6/28/2000)
- ML003782090 - Request for Technical Assistance - Resolution of Pipe Support Design Issues at LaSalle County Station - TIA 2000-03 (6 page(s), 12/29/2000)
- ML003735476 - D.C. Cook, Task Interface Agreement (TIA) 2000-05: Evaluation of the Operability Determination and Supporting Calculations for a Concrete Containment Wall (TAC NO. MA8786) (4 page(s), 7/26/2000)
- ML003746701 - DC Cook , TIA - Evaluation of the Essential Service Water System Configuration (4 page(s), 9/1/2000)
- ML010720218 - DC Cook, Units 1 and 2, TIA, Evaluation of Emergency Operating Procedure Shutdown Criteria (3 page(s), 3/12/2001)
- ML010650101 - TIA 2000-10 - Reevaluation of TIA 98-11 Regarding Reactor Vessel Support Concrete Temperature at Farley Plant (MA9311 and MA9312) (5 page(s), 3/6/2001)
- ML011780508 - Task Interface Agreement 2000-11, De-Watering of a River Screenhouse Intake Bay at the Byron Nuclear Power Plant (7 page(s), 7/9/2001)
- ML003779797 - TIA 2000-13, Request for Technical Assistance - Com Ed Interpretation of ASME Code Requirements for LaSalle (3 page(s), 12/21/2000)
- ML003732184 - North Anna, Units 1 & 2 - Manually Actuated Halon 1301 Fire Suppression System installed in Emergency Switchgear Rooms (2 page(s), 7/13/2000)
- ML010380251 - DC Cook, Units 1 & 2, TIA 2000-08 Seismic Qualification of Ice at the DC Cook Plant (3 page(s), 12/29/2000)
- ML010570084 - Shearon Harris, Unit 1, TIA, Supplemental NRR Response to Task Interface Agreement (TIA) 2000-16 RE Review of Fire Test Reports Provided by Licensee for Resolution of Fire Protection Inspection Fire Barrier Qualification Issues (7 page(s), 2/26/2001)
- ML013480323 - Task Interface Agreement 2000-18, Design-Basis Assumptions for Non-Seismic Piping Failures at the Perry Plant. (6 page(s), 1/4/2002)
- ML010800194 - Cooper Nuclear Station, Task Interface Agreement (TIA) Response, Evaluation of DC System Grounds (9 page(s), 3/20/2001)
- ML012890266 - Millstone Nuclear Power Station, Unit No. 3 - Response to Task Interface Agreement (TIA 2001-003) Regarding Fire Protection Compensatory Measures (Tac No. MB1606) (4 page(s), 10/16/2001)
- ML022140006 - Prairie Island, Units 1 & 2 - Response to Task Interface Agreement (TIA 2001-02) &TIA 2001-04 re: Evaluation of Service Water System Design Basis Requirements. (11 page(s), 8/29/2002)
- ML021060641 - Quad Cities - Task Interface Agreement (TIA) 2001-07 from Region III Regarding Quad Cities Maintenance Rule (MR) Issues. (11 page(s), 5/1/2002)
- ML021140426 - Byron Station, Memo re response to Task Interface Agreement 2001-009 regarding Potential Unisolable Reactor Coolant Leak Outside Containment. (13 page(s), 5/24/2002)
- ML032040412 - Prairie Island, Unit 2, Response to TIA 2001-10, Design Basis Assumptions for Ability of Emergency Diesel Generators to Meet Single Failure Criteria for External Events. (6 page(s), 9/4/2003)
- ML020570514 - Susquehanna Steam Electric Station, Unit Nos. 1 and 2 - Response to Task Interface Agreement - TIA 2001-12, Re: Licensing Bases for the Standby Liquid Control System (TAC Nos. MB2764 and MB2844) (4 page(s), 5/6/2002)
- ML031010026 - NRC Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane. (16 page(s), 2/21/2003)
- ML023290377 - Donald C. Cook, Units 1 & 2, Task Interface Agreement (TIA 2001-15) Re: Evaluation of Containment Structure Conformance to Design-Basis Requirement. (22 page(s), 1/13/2003)
- ML022470002 - Browns Ferry, Units 2 and 3, Task Interface Agreement, Nuclear Regulatory Commission Policy Questions on Licensee Use of Risk Techniques to Justify Operation in Unanalyzed Conditions. (3 page(s), 9/25/2002)
- ML030310355 - Prairie Island, Units 1 and 2 - Response to TIA 2003-01 - Application of ASME Code Section XI, IWB-2430 Requirements Associated with Scope of Volumetric Weld Expansion. (6 page(s), 5/27/2003)
- ML042180468 - Response to Task Interface Agreement - TIA 2004-01, Request for Evaluation of Technical Specifications and Other Requirements Intended to Control Degradation of Class 1E Station Batteries at Arkansas Nuclear One, Unit 2. (6 page(s), 8/11/2004)
- ML050120255 - Response to Task Interface Agreement - TIA 2004-006, Request for Evaluation of Sargent and Lundy Report on Hope Creek 'B' Reactor Recirculation Pump and PSEG Nuclear , LLC Evaluation of High Pressure Coolant Injection System Exhaust Snubbers. (7 page(s), 1/12/2005)
- ML040490220 - Davis-Besse, Unit 1, Response to Task Interface Agreement (TIA) 2003-06 (TAC No. MC1676). (7 page(s), 2/6/2004)
- ML040160210 - Brunswick Nuclear Plant - Task Interface Agreement (TIA 2003-05); NRC Policy Questions on Technical Specification Adequacy and Related Technical Specification Operability. (7 page(s), 1/16/2004)
- ML021220399 - LaSalle - Task Interface Agreement - Evaluation of LaSalle Waterhammer Analysis. (20 page(s), 7/1/2002)
- ML003685227 - Arkansas Nuclear One, Unit Nos. 1 and 2 - Task Interface Agreement (TIA) No. 99-018 RE: Evaluation of the Conduct of Personnel Assembly and Site Evacuation Under Emergency Conditions (TAC Nos. MA6004 and MA6005) (8 page(s), 2/22/2000)
- ML003698607 - TASK INTERFACE AGREEMENT 99-13, BRUNSWICK LICENSING BASIS FOR CONSIDERATION OF BYPASS LEAKAGE IN CONTROL ROOM AND OFFSITE DOSE CALCULATIONS (11 page(s), 3/30/2000)
- ML003717440 - Waterford, TIA, Response to Ltr dated 11/3/99 Adequacy Of Automatic Resequencing Of NonSafety Electrical Loads To Class 1 E Bus (6 page(s), 5/15/2000)
- ML003732826 - Braidwood, TIA, Comparison of Licensee's Absence Control Program with 10 CFR Part 26 (5 page(s), 7/17/2000)
- ML003735027 - Brunswick, Unit 1 -] TIA 99-024 , Brunswick's Repetitive Use of a Bounding Heatup and Cooldown Reactor Pressure Vessel Temperature Transient Analysis (5 page(s), 7/25/2000)
- ML003738026 - St. Lucie, TIA, 2000-04, "Evaluation of St. Lucie reply to TIA 99-01 (7 page(s), 8/4/2000)
- ML003756084 - DC Cook 1 & 2, TIA 2000-09 - Eval. of the Requirement for On-Line Testing of Slave Relays in the Engineered Safety Feature Actuation System (TAC NOs. MA9323 & MA9324) (6 page(s), 9/29/2000)
- ML003762843 - Ginna, NRR Response to Task Interface Agreement (TIA) 2000-01, Acceptability of Calculations Used to Determine the Operability of the Main Steam Non-Return Check Valves (5 page(s), 10/24/2000)
- ML003769795 - D. C. Cook, TIA, Evaluation of the Engineered Safety Features Safeguards Test Cabinet (4 page(s), 11/17/2000)
- ML011060246 - Palisades, TIA, Request for Evaluation of Emergency Plan Shift Staffing Commitments (3 page(s), 4/16/2001)
- ML011060283 - Point Beach, Units 1 and 2, TIA, Interpretation of Current Licensing Basis for the Service Water System In-Line Strainers (4 page(s), 4/16/2001)
- ML011170494 - NRR Response to TIA 2000-19, Adequacy of Personnel Access Control To Vital Areas (2 page(s), 4/27/2001)
- ML012050008 - Task Interface Agreement 2001-05, Fire Zones 11.5-0 and 11.6-0 at the Braidwood Nuclear Power Plant. (6 page(s), 9/6/2001)
- ML012880121 - Indian Point, Unit 2, Memoranda Re: Response To Task Interface Agreement Re: Unresolved Item For Wire Separation Inside Reactor Protection Cabinets. (7 page(s), 10/22/2001)
- ML012970318 - Task Interface Agreement TIA 2001-008, Evaluation of a Change To The Byron Station Diesel Generator Ventilation System, Per 10 CFR 50.59 (9 page(s), 11/19/2001)
- ML021990405 - Supplemental Fire Modeling for Fire Zone 98-J, Emergency Diesel Generator Corridor & Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1(TAC No. MB2872). (56 page(s), 7/18/2002)
- ML022880072 - Oconee, Units 1, 2 & 3, TIA, Re: Review of Oconee Steam Generator Tube Stresses Resulting From Use of the Station ASW Pump. (5 page(s), 10/29/2002)
- ML023310723 - Response to Request for Technical Assistance - Risk Assessment of Davis-Besse Reactor Head Degradation (TIA 2002-01). (31 page(s), 12/6/2002)
- ML030290320 - Hatch, TIA, Re: Safety/Relief Valve Operability. (8 page(s), 1/30/2003)
- ML040270181 - Davis-Besse, Memo, Evaluation of Davis-Besse Modifications to the High Pressure Injection Pump and Associated Mock-Up Testing (TIA NO. 2003-04, TAC NO. MC0584). (40 page(s), 2/11/2004)
- ML050900176 - Fire Hazard Analysis for Fire Zone 98-J, Emergency Diesel Generator Corridor and Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 (TAC MB2872). (32 page(s), 5/28/2002)