Home > NRC Library > ADAMS Public Documents
H. B. Robinson, Unit 2, Request for Technical Specifications Changes Regarding Reactor Protection System and Engineered Safety Feature Actuation System Instrumentation Tables.
Accession Number: ML042390202
Date Released: Friday, September 3, 2004
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML042390204 - H. B. Robinson, Unit 2, Request for Technical Specifications Changes Regarding Reactor Protection System and Engineered Safety Feature Actuation System Instrumentation Tables. (23 page(s), 8/20/2004)
- ML042390207 - Calculation RNP-I/INST-1135, Rev 1, "Nuclear Instrumentation Intermediate Range Error Analyses." (25 page(s), 2/11/2003)
- ML042390211 - Calculation RNP-I/INST-1128, Rev 5, "RCS Flow Instrument Uncertainty and Scaling Calculation." (71 page(s), 7/1/2004)
- ML042390215 - Calculation RNP-I/INST-1043, Rev 5, "Main Steam Pressure Uncertainty and Scaling Calculation," for H. B. Robinson Unit 2. (58 page(s), 8/13/2002)
- ML042390217 - Calculation RNP-I/INST-1041, Rev 3, "Feedwater Flow Loop Uncertainty and Scaling Calculation," for H. B. Robinson Unit 2. (100 page(s), 9/13/2002)
- ML042390222 - Standard Procedure, Volume 99, Book/Part 99, EGR-NGGC-0153, Rev 10, "Engineering Instrument Setpoints". (190 page(s), 8/20/2004)