Home > NRC Library > ADAMS Public Documents
FOIA/PA-2001-0256 - Resp 18 - Partial.
Accession Number: ML020910055
Date Released: Wednesday, March 27, 2002
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML020880117 - FOIA/PA-2001-0256 - Resp 18 - Partial. (3 page(s), 3/19/2002)
- ML020880149 - Note to Scott from Brian re operational assessment for forms of degradation. (1 page(s), 3/19/2002)
- ML020880157 - Restart of Indian Point 2 Following Steam Generator Tube Failure on February 15, 2000, and Category C-5 Steam Generator Inspection Results. (63 page(s), 3/19/2002)
- ML020880150 - Charts--Communication Safety Significance of IP2 Tube Failure, etc. (11 page(s), 3/19/2002)
- ML020880151 - Chart - Indian Point 2 Lessons learned, with handwritten notes. (2 page(s), 3/19/2002)
- ML020880155 - Comments on Brian Sheron's comments. (1 page(s), 3/19/2002)
- ML020880158 - Proposed response for Chairman's 11/08/00 interview with inside NRC. (4 page(s), 3/19/2002)
- ML020880161 - Indian Point 2 SG Tube Failure Lessons Learned Task Group Summary. (2 page(s), 3/19/2002)
- ML020880163 - Draft memo to William Travers from Samuel Collins re Transmittal of the Indian Point 2 SG Failure Lessons Learned Report. (4 page(s), 3/19/2002)
- ML020880165 - Presentation slides - Indian Point, Unit 2 Steam Generator Tube Failure Lessons Learned task Force - Approach and Outputs. (8 page(s), 3/19/2002)
- ML020880167 - Graphs - Review to Tube R2C5 in Steam Generator 24 - Phase settings between 1997 and 2000. (4 page(s), 3/19/2002)
- ML020880171 - Talking Points for 3/7 Congressional Briefing. (3 page(s), 3/19/2002)
- ML020880177 - Note to Ted Quay from Scott Newberry. (2 page(s), 3/19/2002)
- ML020880178 - Memo to William Russell and from Brian Sheron re specialized eddy current data analysis capabilities and regional inspector training in steam generators. (2 page(s), 3/7/1996)
- ML020880181 - Memo to James Wiggins from Jack Strosnider re issues presented in supplement to differing professional opinion re steam generator tube integrity. (12 page(s), 5/17/2000)
- ML020880182 - Indian Point 2 - Steam Generator Tube Inspection Report. (2 page(s), 3/19/2002)
- ML020880185 - Indian Point 2 Lessons Learned Table. (2 page(s), 7/5/2000)
- ML020880187 - Con Ed handout for Exit regarding questions related to the NRC Special Inspection Team assessment of IP2 1997 steam generator inspection. (5 page(s), 7/20/2000)
- ML020880200 - Presentation Slides - Optimization of Eddy Current Inspection techniques for Inner Diameter - Initiated Stress Corrosion. (12 page(s), 7/12/2000)
- ML020910014 - Presentation material from the EPRI 19th Annual Steam Generator NDE Workshop. (83 page(s), 7/12/2000)
- ML020910018 - Memo to Jack Strosnider & John Zwolinski from Scott Newberry re safety evaluation report. (3 page(s), 8/4/2000)
- ML020910026 - Presentation slides - Indian Point 2 Steam Generator Tube Inspection Findings and Preliminary Significance Characterization - EDO Pre-brief for Commission Technical Assistant Briefing. (30 page(s), 8/23/2000)
- ML020910030 - Meeting Agenda between Con Ed and NRC's IP2 Steam Generator Tube Failure Lessons-Learned Task Group. (1 page(s), 8/29/2000)
- ML020910036 - Presentation slides - Indian Point 2 Steam Generator Tube Failure Lessons Learned. (29 page(s), 10/23/2000)
- ML020910040 - Draft letter from Hubert Miller to A Alan Blind re final significance determination for a Red Finding and Notice of Violation at Indian Point 2. (17 page(s), 11/6/2000)
- ML020910044 - Draft letter from Hubert Miller to A Alan Blind re final significance determination for A Red Finding and Notice of Violation at Indian Point 2. (18 page(s), 11/8/2000)
- ML020910048 - Draft letter to Baumstark re response to NRC special Inspection 05000247/2000-010 - Steam Generator Tube Failure. (2 page(s), 3/19/2000)