Home > NRC Library > ADAMS Public Documents
Three Mile Island, Unit 1, Inservice Inspection (ISI) - Third Ten Year Inspection Interval Program Plan.
Accession Number: ML012280246
Date Released: Friday, August 24, 2001
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML012280028 - Part 1 - Three Mile Island, Unit 1, Inservice Inspection (ISI) - Third Ten Year Inspection Interval Program Plan. Cover Letter through Section 6. (151 page(s), 8/2/2001)
- ML012280054 - Drawing E13117E, Rev. 9, "Assembly and Detail of Lower Head." (1 page(s), 10/13/1969)
- ML012280060 - Drawing NU-C-1121-44, Rev. C, "Lower maniford 3056C-40LL Weldseal." (1 page(s), 10/8/1987)
- ML012280064 - Drawing NU-C-1121-4, Rev. C, " Center Manifold 3056C-40LL Weldseal." (1 page(s), 10/8/1987)
- ML012280067 - Drawing NU-D-1044-1, "Letdown Cooler." (1 page(s), 10/21/1980)
- ML012280073 - Drawing ID-ISI-MU-036, Rev. 1, "ISI Configuration Sketch TMI-1 Letdown Cooler Detail." (1 page(s), 2/27/1987)
- ML012280095 - Drawing B-20555-A, Rev. 1, "Tube Sheet Part D." (1 page(s), 11/11/1970)
- ML012280099 - Drawing "Mirror Insulation Outline Dimensions for B&W PWR Three Mile Island Nuclear Plant Metropolitan Edison Company Unit 1." (1 page(s), 4/4/1969)
- ML012280209 - Part 2 - Three Mile Island, Unit 1, Inservice Inspection (ISI) - Third Ten Year Inspection Interval Program Plan. Appendix A through end. (71 page(s), 8/2/2001)