Home > NRC Library > ADAMS Public Documents
05000352, 05000353 Limerick Initial Exam (05/07-13/2001): Facility Developed.
Accession Number: ML010110392
Date Released: Friday, January 19, 2001
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML010100291 - Senior Reactor and Reactor Operator Initial Examinations - Limerick Generating Station dtd 1/10/01 (4 page(s), 1/10/2001)
- ML011430103 - Final - RO Written (90 page(s), 5/4/2001)
- ML011430129 - Final - SRO Written (99 page(s), 5/4/2001)
- ML011430140 - Final - Section A Operating (RO) (23 page(s), 5/4/2001)
- ML011430155 - Final - Section A Operating (SRO) (37 page(s), 5/4/2001)
- ML011430172 - Final - Section B Operating (RO & SRO) (61 page(s), 5/4/2001)
- ML011430207 - Final - Section C - Operating (RO & SRO) (25 page(s), 5/4/2001)
- ML011450323 - Final - NRC Results Ltr dtd 5/24/2001. (3 page(s), 5/24/2001)
- ML011550512 - Limerick Generating Station Reactor Operator and Senior Reactor Operator Initial Examinations Report Nos. 05000352/2001-301 and 05000353/2001-301 (8 page(s), 6/4/2001)
- ML011920210 - Waiver Approval Ltr dtd 7/13/2000. (2 page(s), 7/13/2000)
- ML020850544 - Final Q/A Related Forms, Limerick. (20 page(s), 5/4/2001)
- ML020950111 - Draft - Outlines. (24 page(s), 5/4/2001)
- ML020950147 - Draft - NRC Comments. (9 page(s), 5/4/2001)
- ML020950238 - Draft - RO & SRO Written. (134 page(s), 5/4/2001)
- ML020950279 - Draft - Section A Operating. (50 page(s), 5/4/2001)
- ML020950322 - Draft - Section B Operating. (58 page(s), 5/4/2001)
- ML020950352 - Draft - Section C Operating. (37 page(s), 5/4/2001)
- ML020950378 - Final - Outlines (Change Summaries - Optional), Limerick. (20 page(s), 5/4/2001)
- ML020950503 - NRC Ltr Transmitting Certificates dtd 06/06/01. (2 page(s), 6/6/2001)