Home > NRC Library > ADAMS Public Documents
Inspection Manual Change Notice 24-024
Accession Number: ML24241A154
Date Released: Thursday, September 5, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML24247A306 - Inspection Manual Change Notice 24-024 (9/5/2024)
- ML24247A305 - Table of Contents for Inspection Manual Change Notice 24-024 (9/5/2024)
- ML24150A361 - IMC 0308 Attachment 3 Appendix F, Technical Basis Fire Protection Significance Determination Process (Supplemental Guidance for Implementing IMC 0609 Appendix F) At Power Operations (9/5/2024)
- ML24150A359 - IMC 0609 Appendix F, Fire Protection Significance Determination Process (9/5/2024)
- ML24145A028 - IMC 0609 Appendix F, Attachment 1, Fire Protection Significance Determination Process Worksheets (9/5/2024)
- ML24145A029 - IMC 0609 Appendix F, Attachment 2, Degradation Rating Guidance (9/5/2024)
- ML24145A030 - IMC 0609 Appendix F, Attachment 3, Guidance for Identifying Credible Fire Scenarios (9/5/2024)
- ML24145A031 - IMC 0609 Appendix F, Attachment 4, Guidance for Determining Fire Ignition Frequency (9/5/2024)
- ML24145A032 - IMC 0609 Appendix F, Attachment 5, Characterizing Fire Ignition Sources (9/5/2024)
- ML24145A033 - IMC 0609 Appendix F, Attachment 6, Guidance for Identification of Targets and Their Ignition and Damage Criteria (9/5/2024)
- ML24150A357 - IMC 0609 Appendix F, Attachment 7, Guidance for Fire Non-Suppression Probability Analysis (9/5/2024)
- ML24150A358 - IMC 0609 Appendix F, Attachment 8, Tables and Plots Supporting the Phase 2 Risk Quantification (9/5/2024)