Home > NRC Library > ADAMS Public Documents
Millstone Power Station, Units 1, 2, and 3, Updates to the Final Safety Analysis Report
Accession Number: ML22193A089
Date Released: Friday, August 12, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22193A079 - Millstone Power Station, Units 1, 2, and 3, Updates to the Final Safety Analysis Report (12 page(s), 6/23/2022)
- ML22193A023 - Millstone Power Station Unit 1, Revision 17 to Defueled Safety Analysis Report (211 page(s), 6/23/2022)
- ML22193A025 - Millstone Power Station Unit 1, Revision 17 to Defueled Safety Analysis Report, Drawings Incorporated by Reference - Redacted (14 page(s), 6/23/2022)
- ML22193A024 - Millstone Power Station Unit 1, Technical Requirements Manual (37 page(s), 6/23/2022)
- ML22193A081 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report (95 page(s), 6/23/2022)
- ML22193A063 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (139 page(s), 6/23/2022)
- ML22193A069 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment (83 page(s), 6/23/2022)
- ML22193A065 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 3, Reactor (137 page(s), 6/23/2022)
- ML22193A073 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (195 page(s), 6/23/2022)
- ML22193A068 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 5, Structures (399 page(s), 6/23/2022)
- ML22193A067 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems (153 page(s), 6/23/2022)
- ML22193A064 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (280 page(s), 6/23/2022)
- ML22193A066 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (166 page(s), 6/23/2022)
- ML22193A075 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (408 page(s), 6/23/2022)
- ML22193A070 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (56 page(s), 6/23/2022)
- ML22193A074 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Processing and Radiation Protection Systems (150 page(s), 6/23/2022)
- ML22193A080 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations (19 page(s), 6/23/2022)
- ML22193A077 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation (103 page(s), 6/23/2022)
- ML22193A078 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (535 page(s), 6/23/2022)
- ML22193A076 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Chapter 15, License Renewal (54 page(s), 6/23/2022)
- ML22193A072 - Millstone Power Station Unit 2, Revision 40 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted (218 page(s), 6/23/2022)
- ML22193A071 - Millstone Power Station Unit 2, Technical Requirements Manual (330 page(s), 6/23/2022)
- ML22193A135 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report (144 page(s), 6/23/2022)
- ML22193A136 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (318 page(s), 6/23/2022)
- ML22193A141 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (574 page(s), 6/23/2022)
- ML22193A139 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 2, Tables & Appendices (859 page(s), 6/23/2022)
- ML22193A129 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (1163 page(s), 6/23/2022)
- ML22193A125 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 4, Reactor (267 page(s), 6/23/2022)
- ML22193A131 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (209 page(s), 6/23/2022)
- ML22193A138 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (538 page(s), 6/23/2022)
- ML22193A123 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 7, Instruments and Controls (345 page(s), 6/23/2022)
- ML22193A126 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (136 page(s), 6/23/2022)
- ML22193A128 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (507 page(s), 6/23/2022)
- ML22193A130 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (130 page(s), 6/23/2022)
- ML22193A121 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (213 page(s), 6/23/2022)
- ML22193A127 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (103 page(s), 6/23/2022)
- ML22193A144 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (21 page(s), 6/23/2022)
- ML22193A134 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (184 page(s), 6/23/2022)
- ML22193A122 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (509 page(s), 6/23/2022)
- ML22193A137 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (3 page(s), 6/23/2022)
- ML22193A133 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (3 page(s), 6/23/2022)
- ML22193A124 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering (4 page(s), 6/23/2022)
- ML22193A140 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Chapter 19, License Renewal (53 page(s), 6/23/2022)
- ML22193A132 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report (396 page(s), 6/23/2022)
- ML22193A142 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference (185 page(s), 6/23/2022)
- ML22193A143 - Millstone Power Station Unit 3, Revision 35 to Updated Final Safety Analysis Report, Technical Requirements Manual Current Through Change No. 207 (284 page(s), 6/23/2022)