Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21274A027 - NBSR Report on February 3, 2021 Fuel Failure Event, Root Causes, Corrective Actions, and Restart Readiness (2 page(s), 10/1/2021)
- ML21274A019 - NCNR TWG Report "Root Cause Investigation of February 2021 Fuel Failure", Revision 2 (28 page(s), 9/13/2021)
- ML21274A020 - NCNR TWG Report "Addendum to Root Cause Investigation of February 2021 Fuel Failure" (1 page(s), 6/3/2021)
- ML21274A021 - Final Report "SEC Subcommittee Report: Review of the NCNR Event Response and Technical Working Root Cause Analysis and Corrective Action Plan" (28 page(s), 8/12/2021)
- ML21274A022 - "Root Cause Response", Revision 1 (10 page(s), 9/20/2021)
- ML21274A023 - "Latch Improvement Safety Analysis" (2 page(s), 9/21/2021)
- ML21274A024 - "Memorandum on Recovery Items" (1 page(s), 9/21/2021)
- ML21274A025 - Corrective Action Plan Corrective Actions Required Prior to Reactor Startup (2 page(s), 9/30/2021)
- ML21274A026 - Corrective Action Plan Corrective Actions Required Post-startup (2 page(s), 9/30/2021)