Home > NRC Library > ADAMS Public Documents
Beaver Valley Power Station, Unit 2, Submittal of Revision 25 to Updated Final Safety Analysis Report
Accession Number: ML20335A124
Date Released: Monday, March 22, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20335A122 - Beaver Valley Power Station, Unit 2, Submittal of Revision 25 to Updated Final Safety Analysis Report (5 page(s), 11/23/2020)
- ML20335A121 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Summary List of Effective Pages (77 page(s), 11/23/2020)
- ML20335A120 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (339 page(s), 11/23/2020)
- ML20335A123 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, The Site (1373 page(s), 11/23/2020)
- ML20335A134 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (1086 page(s), 11/23/2020)
- ML20335A127 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Reactor (270 page(s), 11/23/2020)
- ML20335A128 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (234 page(s), 11/23/2020)
- ML20335A139 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (511 page(s), 11/23/2020)
- ML20335A126 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (470 page(s), 11/23/2020)
- ML20335A141 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (172 page(s), 11/23/2020)
- ML20335A135 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (460 page(s), 11/23/2020)
- ML20335A132 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (177 page(s), 11/23/2020)
- ML20335A138 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (188 page(s), 11/23/2020)
- ML20335A143 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (160 page(s), 11/23/2020)
- ML20335A125 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (34 page(s), 11/23/2020)
- ML20335A136 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (162 page(s), 11/23/2020)
- ML20335A133 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis (471 page(s), 11/23/2020)
- ML20335A129 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (5 page(s), 11/23/2020)
- ML20335A130 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (3 page(s), 11/23/2020)
- ML20335A137 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering (6 page(s), 11/23/2020)
- ML20335A140 - Beaver Valley Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 19, Managing the Effects of Component Aging (61 page(s), 11/23/2020)
- ML20335A131 - Beaver Valley Power Station, Unit 2, Revision 95 to Licensing Requirements Manual (LRM) Quick Index (261 page(s), 11/23/2020)
- ML20335A142 - Beaver Valley Power Station, Unit 2, Revision 38 to Technical Specification Bases Update Status (697 page(s), 11/23/2020)