NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 0 to Special Procedure SPP-89-9, "Control Room Boundary In-Leakage Test." Requests that next in-leakage test be deferred until Unit 1 refuel outage currently scheduled to start on 890904.

Accession Number: ML20246H616

Date Released: Wednesday, September 16, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer