Home > NRC Library > ADAMS Public Documents
Amend 1 to License 34-08520-01 for Marathon Pipe Line Co, amending license in entirety.
Accession Number: ML20235Y710
Date Released: Wednesday, October 23, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20235Y780 - Responds to request for addl info.Drawing of Guernsey pump station plat on pipeline sys,showing location of control bldg encl.Bldg kept under lock & key at all times.W/one oversize drawing. (1 page(s), 2/27/1987)
- ML20266J633 - "GUERNSEY STATION LAYOUT." (1 page(s), 2/10/1969)
- ML20235Z267 - Responds to telcon request for clarification on use & storage of nuclear matl,per 850424 application for renewal of License 34-08520-01.Use of Fe-55 needed to make Model 10 sulfur analyzer function.Record of 870107 telcon encl. (3 page(s), 9/10/1986)
- ML20235Z365 - Requests that expiration date for License 34-08520-01 be extended 30 days,until 850530,in order to complete proper paperwork.Renewal application & fee will be forwarded soon. License encl. (1 page(s), 4/11/1985)
- ML20235Z330 - Ack receipt of application for renewal of License 34-08520-01. (1 page(s), 5/20/1985)
- ML20235Z337 - Application for renewal of License 34-08520-01.Fee paid. (1 page(s), 4/24/1985)
- ML20235Z374 - Forwards application for renewal of License 49-13857-01. (1 page(s), 1/21/1980)
- ML20244A906 - Application for renewal of Matl/Byproduct License 49-13587-01 for Marathon Pipe Line Co,authorizing Fe-55 in sealed source for determination of percentage of sulfur in crude oil samples.Fee paid. (4 page(s), 1/21/1980)