Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request.Documents listed in App B encl.Documents also available in PDR.
Accession Number: ML20209C222
Date Released: Tuesday, August 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20210E460 - Partial response to FOIA request.Documents listed in App B encl.Documents also available in PDR. (3 page(s), 9/16/1986)
- ML20210E649 - Forwards memo re radiation safety issues,for review.Response requested by 830902. (1 page(s), 8/23/1983)
- ML20209C217 - Forwards specific instructions re independent NDE of RCS & other safety-related piping,per W Laudan request.Any exceptions should be identified & documented in contractor final rept. (5 page(s), 6/30/1983)
- ML20210E686 - Summary of Review Panel 831012 meeting re reinstatement of license.Knighton aware of licensee request for exemption from requirements of 10CFR50,App R & will determine required licensee action & schedule.Related info encl. (12 page(s), 10/14/1983)
- ML20210E538 - Discusses apparent violations of regulatory requirements re seismic design errors discovered on 810922,matl false statement made on 811103 & other potential violations identified during design reverification program. (2 page(s), 2/24/1982)
- ML20210E562 - Responds to 820811 request for comments & recommendations re acceptability of IDVP Phase II plan proposed by Teledyne. Scope,Phase II subphase dates,responsibilities for review & documentation of design changes addressed. (4 page(s), 8/20/1982)
- ML20210E657 - Submits comments for consideration prior to reinstatement of License DPR-76,including recommendation for full implementation of NUREG-0737,Item II.F.1 re addl accident monitoring. (7 page(s), 8/19/1983)
- ML20210E602 - Comments on draft Phase II Commission paper per 821004 request.Staged licensing,intervenor comments & consolidated staff position discussed. (5 page(s), 10/6/1982)
- ML20210E697 - Forwards 831019 Allegation RV-83-A-0046 re facility,per L Chandler 831020 request.Encl considered confidential until alleger contacted. (12 page(s), 10/20/1983)
- ML20210E671 - Forwards response to Governor Deukmejian third set of Interrogatories 49,50,55,56,59 & 60.Region V has no knowledge of NRC design OA insps of Westinghouse from 1968- 1970. (5 page(s), 9/23/1983)
- ML20210E731 - Advises that results of const & preoperational tests agree w/docketed commitments & regulatory requirements,w/exception of encl listed items.Implementation of QA program for operations meets requirements of 10CFR50,App B. (3 page(s), 11/15/1983)
- ML20210E583 - Forwards comments on list of action items in response to 820914 request.Detailed list of open items identified in insp of IDVP also encl. (14 page(s), 9/17/1982)
- ML20210E515 - Forwards memo expressing concerns re technical adequacy of RL Cloud Assoc,Inc & other util contractors involved in design reverification program.Meeting w/util & contractors to discuss concerns recommended,per 811231 memo. (1 page(s), 1/16/1982)
- ML20210E749 - Forwards followup of Allegations 2 & 7 re errors in design/documentation of safety-related sys,structures & components. (7 page(s), 12/12/1983)
- ML20210E525 - Comments on util 811204 ltr responding to Order CLI-81-30 re seismic design reverification program.Overview role of Teledyne Engineering Svcs should be expanded & clarified to address listed items. (3 page(s), 2/23/1982)
- ML20210E486 - Forwards comments on design verification program plan for seismic work prior to June 1978,per M Furbush 811204 ltr. Comments on qualification of companies proposed to conduct reviews reserved until current util investigation completed. (3 page(s), 12/16/1981)
- ML20210E632 - Forwards SSER input per Eisenhut 830622 request.Listed items of noncompliance do not indicate unresolvable problems. (9 page(s), 7/21/1983)
- ML20210E544 - Comments on 820726 memo re possible mods to Suspension Order CLI-81-30 re Phase I of design verification program.Listed actions must be taken to assure safety during fuel loading & low power testing. (2 page(s), 7/30/1982)