Partial response to FOIA request for documents of H Schierling from Sept 1981 - Dec 1983 re plant.Encl App Q documents & documents listed in App P available in PDR.
Accession Number: ML20204G536
Date Released: Saturday, August 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20207Q719 - Partial response to FOIA request for documents of H Schierling from Sept 1981 - Dec 1983 re plant.Encl App Q documents & documents listed in App P available in PDR. (4 page(s), 2/26/1987)
- ML20207Q740 - Forwards Insp Repts 50-275/83-30 & 50-323/83-22 of monthly insp for Sept 1983. (1 page(s), 11/1/1983)
- ML20207Q742 - Informs that 831202 submittal of current description of QA plan for operations of plant,replacing Chapter 17.2 of FSAR, presents upgrade of program previously accepted.Program satisfies requirements of App B to 10CFR50. (1 page(s), 12/20/1983)
- ML20207Q729 - Forwards summary of facility mods as of 821208,per FJ Miraglia 820616 request.Updated status will be provided by 830114. (12 page(s), 12/22/1982)
- ML20207Q728 - Forwards summary of facility mods as of 820910 for info,per FJ Miraglia 820616 request.Updated status will be provided by 821108. (3 page(s), 10/1/1982)
- ML20207Q726 - Requests assistance in responding to concerns of constituent re role of Bechtel Corp at plant. (3 page(s), 5/19/1982)
- ML20207Q733 - Recommends that Board be notified of potentially reportable events,including potentially inadequate welds in component cooling water sys & potential violation on min wall thickness in RCS pipe. (1 page(s), 5/12/1983)
- ML20207Q721 - Forwards ltrs to D Fleischaker & P Crane re deficiencies found at plant for distribution to persons associated w/ hearing. (1 page(s), 4/22/1982)
- ML20207Q727 - Forwards summary of plant mods per 820616 request.Summary of mods will be provided on monthly basis. (3 page(s), 8/4/1982)
- ML20207Q739 - Responds to request for Region V input to address Item 1 of Chilk 830920 memo.During 1982,insp staff examined 70% to 90% of mods to facility as result of IDVP & internal technical program. (1 page(s), 10/20/1983)
- ML20207Q723 - Ack receipt of 820406 ltr to PG Shewmon re audit & reevaluation of seismic design of plant.Subcommittee on plant will meet to consider deficiencies & related corrective actions at appropriate time. (1 page(s), 4/21/1982)
- ML20207Q731 - Recommends that Board be notified of incident involving intentional damage to reactor coolant pipe.Initially reported on 830421.Util 830421 ltr encl. (1 page(s), 4/27/1983)
- ML20207Q738 - Forwards util requests for review & approval of change to Chapter 17 of FSAR.Review should be subj to fees prescribed in 10CFR170.22. (1 page(s), 10/14/1983)
- ML20207Q724 - Informs that ACRS Subcommittee on Diablo Canyon has not held any meetings re deficiencies,in response to 820413 ltr. Recipient will be informed in advance of subcommittee meetings. (1 page(s), 4/23/1982)
- ML20207Q730 - Forwards summary of mods as of 830110,per FJ Miraglia 820616 request.Updated status of mods will be provided by 830218. (8 page(s), 1/14/1983)
- ML20207Q722 - Informs that review of plant seismic design deficiencies referred to cognizant subcommittee,in response to recipient 820323 ltr.Subcommittee findings will also address basis for changes in ACRS position re operation of plant. (1 page(s), 4/7/1982)
- ML20207Q741 - Discusses plant status rept for Dec 1983.IDVP completed & NRC issued Suppls 18 & 19 to SER addressing independent design verification of seismic & nonseismic areas of interest. (2 page(s), 12/8/1983)
- ML20207Q725 - Requests info re meetings of subcommittee reviewing seismic design deficiencies,including dates of meetings held & date, time & location of meetings to be held. (1 page(s), 4/13/1982)
- ML20207Q732 - Confirms 830420 telcon informing of discovery of grinder & rotary file gouges in four areas of reactor coolant pump piping near pump casing weldment.Investigation underway will attempt to determine if damage result of sabotage. (1 page(s), 4/21/1983)
- ML20207Q737 - Informs that const & preoperational testing complete in agreement w/commitments & regulatory requirements necessary for rescission of license suspension,w/exception of items listed in encls. (9 page(s), 10/31/1983)
- ML20207Q735 - Notice of violation from insp on 830330-0406 & 0425-29. Violations noted:red hold tags removed prior to completion & approval of nonconformance rept & HP Foley Co welder improperly certified. (3 page(s), 5/19/1983)
- ML20207Q736 - Recommends that Boards be notified re licensee rept that piping wall thickness in several areas of RCS less than code min wall.Licensee 830701 & Parameter,Inc 830714 repts & transcript of 830714 public meeting encl.W/o encls. (1 page(s), 7/19/1983)
- ML20207Q734 - RO:on 830429,while welding reinforcements pad on branch line connection to Loop C of component cooling water sys,leak observed.Ultrasonic exam indicates possibility that full penetration shop weld not made per piping code. (2 page(s), 5/9/1983)
- ML20207Q720 - Requests rescission of ACRS approval for issuance of OL to plant based on fact that approval premised on assumption now known to be invalid.ACRS consideration of plant seismic design should be reopened. (3 page(s), 3/23/1982)