Final response to FOIA request for documents re plant. Forwards App D documents.App D documents also available in PDR.
Accession Number: ML20204E909
Date Released: Thursday, August 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20204E954 - Board Notification 82-60:forwarding info re design verification program from Teledyne Engineering Svcs,RL Cloud Associates,Inc & RF Reedy,Inc. (2 page(s), 6/18/1982)
- ML20204E951 - Board Notification 82-57:forwarding info re status of independent design verification program activities relevant to safety issue on design adequacy.Results will be reported prior to reinstatement of license. (3 page(s), 6/4/1982)
- ML20204E933 - Board Notification 82-06 forwarding "Design Verification Program for Power Ascension:Diablo Canyon Nuclear Power Plant Unit 1," & "Qualification Document - Design Verification Program for Power Ascension." (1 page(s), 1/27/1982)
- ML20204G540 - Board Notification 83-158:forwards Oct 1983 SSER 19 re matters identified in SSER 18 & listed in SECY-83-366,that must be resolved prior to fuel loading.Matters adequately resolved. (2 page(s), 10/14/1983)
- ML20204E905 - Forwarding draft Board Notification 81-38, "Seismic Reverification Program" presented during 811103 meeting w/ PG&E re current status of review & evaluation of seismic discrepancies in facility containment annulus area. (1 page(s), 11/5/1981)
- ML20204E938 - Board Notification 82-53:forwarding summary of 820430 discussion of Bechtel rate in completion of project.Info relevant to design adequacy safety issue. (3 page(s), 6/2/1982)
- ML20204F016 - Board Notification 82-97:forwards transcript of NRC 820909 meeting w/State of CA re design verification program & "Independent Design Verification Program:Auxiliary Bldg," interim technical rept. (2 page(s), 9/29/1982)
- ML20204E945 - Recommends encl Board Notification 82-53 re design verification program be transmitted to Commission.Consists of summary of NRC meeting w/util & Bechtel to discuss role Bechtel will assume in project. (1 page(s), 5/22/1982)
- ML20204F009 - Board Notification 82-93:forwards addl info re semiscale test results concerning feed & bleed mode of core cooling. (1 page(s), 9/24/1982)
- ML20204F036 - Board Notification 83-27:forwards 830221 memo & final EG&G rept re addl RELAP-5 calculation for Semiscale S-SR-2 test. (11 page(s), 3/4/1983)
- ML20204E912 - Draft "Seismic Verification Program." (26 page(s), 11/26/1981)