Forwards "Perry Nuclear Power Plant-Unit 1,Offgas Sys Charcoal Adsorber Combustion Events Final Rept." Temp & combustion product plots of 860706 & 0602 events also encl.
Accession Number: ML20203G077
Date Released: Tuesday, August 4, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20203G074 - Forwards "Perry Nuclear Power Plant-Unit 1,Offgas Sys Charcoal Adsorber Combustion Events Final Rept." Temp & combustion product plots of 860706 & 0602 events also encl. (1 page(s), 7/29/1986)
- ML20203G079 - "Perry Nuclear Power Plant-Unit 1 Offgas Sys Charcoal Adsorber Combustion Events Final Rept." (3 page(s), 7/28/1986)
- ML20203G088 - "General Description & Background of Offgas Sys." (8 page(s), 7/29/1986)
- ML20203G093 - "Analysis of Physical & Chemical Properties of Original & Replacement Activated Carbon." (12 page(s), 7/29/1986)
- ML20203G099 - Rev 1 to Radiation Temporary Instruction RTI-0008, "Offgas Sys Activated Carbon Analysis." (28 page(s), 6/27/1986)
- ML20203G106 - "Carbon Sample Test Rept of Original Barneby Cheney Co Carbon." (10 page(s), 7/15/1986)
- ML20203G112 - "Carbon Sample Test Rept of Replacement Carbon Supplied by Nuclear Consulting Svcs,Inc." (5 page(s), 7/24/1986)
- ML20203G117 - "Analysis of Mode of Ignition & Combustion Propagation for Both Charcoal Adsorber Bed Combustion Events." (21 page(s), 7/29/1986)
- ML20203G122 - "Metallurgical Analysis of Offgas Sys Adsorber Bed Vessels." (12 page(s), 7/29/1986)
- ML20203G127 - "Adsorber Bed Thermocouple Testing Results." (7 page(s), 7/29/1986)
- ML20203G133 - "Description of Charcoal Removal,Sys Drying & Replacement Carbon Installation Activities." (6 page(s), 7/29/1986)
- ML20203G139 - Rev 2 to Maint Temporary Instruction MTI-0006, "Unloading, Drying & Loading of N-64 Activated Carbon Adsorber Vessels." (47 page(s), 7/19/1986)
- ML20203G156 - "Description of Testing Methods to Verify Adequacy of Offgas Vault Refrigeration & Processing Sys." W/19 photographs of offgas sys components & recovery activities.Attachment 2 contains 25 oversize graphs of N-64 offgas sys event. (73 page(s), 7/29/1986)