Home > NRC Library > ADAMS Public Documents
Forwards justification for two additional leak chase channel configurations used in pressure suppression pool that were not bounded by justification provided in 971126 ltr.
Accession Number: ML20203E435
Date Released: Tuesday, August 4, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20203E430 - Forwards justification for two additional leak chase channel configurations used in pressure suppression pool that were not bounded by justification provided in 971126 ltr. (91 page(s), 2/20/1998)
- ML20203E457 - Rev 4 to MRT, "Material Requirement Table." (1 page(s), 8/24/1981)
- ML20203E492 - Rev 7 to WPAT, "Welding Procedure Application Table Downcomer Bracing & Quencher Support & Liner Work." (6 page(s), 5/27/1980)
- ML20203E501 - Rev 6 to WPAT, "Welding Procedure Application Table Downcomer Bracing & Quencher Support & Liner Work." (6 page(s), 4/9/1980)
- ML20203E509 - Rev 5 to WPAT, "Welding Procedure Application Table Downcomer Bracing & Quencher Support & Liner Work." (5 page(s), 3/10/1980)
- ML20203E520 - Rev 4 to WPAT, "Welding Procedure Application Table Downcomer Bracing & Quencher Support & Liner Work." (4 page(s), 8/17/1979)
- ML20203E526 - Rev 3 to WPAT, "Welding Procedure Application Table Downcomer Bracing & Quencher Support & Liner Work." (4 page(s), 5/4/1979)
- ML20203E536 - Rev 2 to WPAT, "Welding Procedure Application Table Downcomer Bracing." (3 page(s), 2/16/1979)
- ML20203E552 - Rev 1 to WPAT, "Welding Procedure Application Table Downcomer Bracing." (3 page(s), 1/8/1979)
- ML20203E565 - Rev 0 to WPAT, "Welding Procedure Application Table Downcomer Bracing." (3 page(s), 8/15/1978)
- ML20203E571 - Rev 2 to WPS-E300/83670, "Downcomer Bracing - Nuclear Power Plant." (3 page(s), 4/7/1980)
- ML20203E580 - Rev 1 to WPS-E308/83670, "Downcomer Bracing - Nuclear Power Plant." (3 page(s), 10/19/1979)
- ML20203E614 - Rev 6 to WPS-E309/83670, "Downcomer Bracing - Nuclear Power Plant. (3 page(s), 7/30/1980)
- ML20203E620 - Rev 5 to WPS-E309/83670, "Downcomer Bracing - Nuclear Power Plant." (3 page(s), 6/20/1980)
- ML20203E622 - Rev 4 to WPS-E309/83670, "Downcomer Bracing - Nuclear Power Plant." (3 page(s), 4/25/1980)
- ML20203E639 - Rev 3 to WPS-E309/83670, "Downcomer Bracing - Nuclear Power Plant." (3 page(s), 4/11/1980)
- ML20203E651 - Rev 2 to WPS-E309/83670, "Downcomer Bracing - Nuclear Power Plant." (3 page(s), 3/28/1980)
- ML20203E696 - Rev 0 to WPS-E309/83670, "Downcomer Bracing - Nuclear Power Plant. (29 page(s), 6/13/1978)
- ML20203E782 - Rev 2 to GR 27 X, "General Repair Procedure for Matls & Welds." (5 page(s), 6/30/1980)
- ML20203E819 - Rev 0 to GR1N, "General Repair Procedure Bottom Liner Plates." (3 page(s), 5/25/1979)
- ML20203E834 - Rev 2 to LC5X, "Leak Chase Channel Solution Film & Pressure Decay Procedure." (5 page(s), 5/10/1979)
- ML20203E902 - Rev 2 to L-001337, "Containment Liner Leak Chase Channel Assessment." (109 page(s), 2/3/1998)