Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for NRC insp rept & related records re evaluation of auxiliary feedwater sys.Documents listed on encl app available in PDR.Search for addl document continuing.
Accession Number: ML20197K090
Date Released: Tuesday, August 4, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20203H152 - Further response to FOIA request for NRC insp rept & related records re evaluation of auxiliary feedwater sys.Documents listed on encl app available in PDR.Search for addl document continuing. (2 page(s), 1/6/1986)
- ML20197K118 - Submits daily highlight.On 850721,reactor tripped due to turbine trip & on 850721 & 22,auxiliary feedwater pumps autostarted due to lo-lo steam generator level & high level, respectively.Cooldown effected on 850722 for valve repairs. (1 page(s), 7/23/1985)
- ML20198A364 - Submits response to 851016 ltr & forwards requested response to ACRS 850920 ltr re facility event.Staff assigned to explore implications of 850722 event within a few days of occurrence.ACRS informed of 850913 special insp. (2 page(s), 10/29/1985)
- ML20198A368 - Responds to 850920 ltr to Chairman Palladino re 850722 auxiliary feedwater pump failure at plant.NRC reviewed pump failure immediately following event.IE info notice being developed & maint program survey scheduled. (2 page(s), 10/28/1985)
- ML20198A371 - Requests info by 851023 re event outlined in ACRS 850920 ltr,including NRC response to ltr,staff responsible for investigation & dates rept to Commission & response to ACRS will be available. (23 page(s), 10/16/1985)
- ML20197K085 - Submits daily highlights.Part 21 rept re MSIV design deficiency submitted.Evaluations for accidents performed & results acceptable for LOCA & steam generator tube rupture. (20 page(s), 7/25/1985)