Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for nine categories of records re damages occurring to nuclear power plants following earthquakes & 860131 earthquake near Perry site.Forwards Apps A & B documents.App B documents also available in PDR.
Accession Number: ML20195C722
Date Released: Tuesday, August 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20195C752 - Rev 1 to "Triaxial Seismic Switch Channel Calibr for D51-N150." (13 page(s), 2/7/1986)
- ML20210T561 - Rev 2 to General Temporary Instruction GTI-0003, "Identifying & Evaluating 860131 Suspected Earthquake Damage." (13 page(s), 2/19/1986)
- ML20195C873 - Rev 1 to "Triaxial Response Spectrum Recorder Channel Calibr for D51-R190 (RCIC Pump Base Mat)." Related documentation encl. (23 page(s), 2/17/1986)
- ML20195C779 - Rev 2 to "Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump)." (43 page(s), 2/20/1986)
- ML20210T614 - Forwards util 860218 response to 860204 petition filed by Western Reserve Alliance w/NRC per 10CFR2.206.Petition raises issues re 860131 earthquake,integrity of plant QA/QC program & util compliance w/10CFR140.Petition w/o basis. (2 page(s), 2/19/1986)
- ML20195C852 - Rev 2 to "Triaxial Peak Accelerograph Channel Calibr for D51-R130 (HPCS Piping in Reactor Bldg)." (13 page(s), 2/18/1986)
- ML20210T548 - Discusses 860203 telcon w/Congressmen Eckart & Siberling & NRC re results on augmented investigation of earthquake.No damage to safety-related sys noted.Some movement in small diameter pipes in nonsafety sys evident. (10 page(s), 2/3/1986)
- ML20195C760 - Rev 1 to "Seismic Instruments Channel Check." (17 page(s), 2/20/1986)
- ML20210C096 - Discusses 860131 earthquake near plant.Facility will be inspected for structural damage & equipment failure or malfunction & seismic instrumentation recordings & util findings evaluated. (3 page(s), 2/19/1986)
- ML20210T580 - "Spectral Analysis of Perry Nuclear Power Plant Velocity- Time Histories Resulting From Ohio Earthquake." (14 page(s), 2/25/1986)
- ML20195C860 - Rev 1 to "Triaxial Response Spectrum Recorder Channel Calibr for D51-R160 (Reactor Bldg Foundation)." (88 page(s), 2/14/1986)
- ML20210T519 - PNO-III-86-009:on 860131,earthquake felt at plant.No significant damage reported.Some site personnel evacuated. Site area emergency declared.Supporting documentation encl. (15 page(s), 1/31/1986)
- ML20210T572 - Rev 2 to Off-Normal Instruction ONI-D51, "Earthquake (Unit 1)." Supporting documentation encl. (12 page(s), 8/19/1985)
- ML20210T556 - Rev 1 to General Temporary Instruction GTI-0003 "Identifying & Evaluating 860131 Suspected Earthquake Damage." (12 page(s), 2/8/1986)
- ML20195C867 - Rev 1 to "Triaxial Response Spectrum Recorder Channel Calibr for D51-R180 (HPCS Pump Base Mat)." (38 page(s), 2/17/1986)
- ML20210T587 - Advises of transfer of Region III lead responsibility for resolution of 860131 earthquake/seismic event at plant to NRR per 860204 telcon w/G Lainas.Util 860211 seismic event evaluation technical presentation agenda & viewgraphs encl. (47 page(s), 2/6/1986)
- ML20210T535 - PNO-III-86-009A:on 860131,earthquake experienced at plant. Site response activities accomplished by implementing emergency plan,although action not required prior to licensing.No significant damage noted. (7 page(s), 2/3/1986)
- ML20210T540 - Rev 0 to General Temporary Instruction GTI-0003, "Identifying & Evaluating 860131 Earthquake-Related Damage." (12 page(s), 2/7/1986)
- ML20195C768 - Rev 1 to "Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump)." (14 page(s), 2/18/1986)
- ML20210C105 - Forwards action plan for evaluating effect of 860131 earthquake on plant design & lists milestones scheduled for each activity.Team meeting scheduled for 850221 to obtain draft SERs on review findings.SER input requested by 860225. (53 page(s), 2/19/1986)
- ML20195C739 - Rev 1 to "Triaxial Time-History Accelerograph Channel Calibr." (22 page(s), 2/7/1986)
- ML20210T593 - Requests that update of 860131 earthquake info be forwarded via Ofc of Congressional Affairs to Markey Subcommittee in response to Markey 860205 ltr. (3 page(s), 2/28/1986)
- ML20210T527 - Rev 2 to "Triaxial Peak Accelerograph Channel Calibr for D51-R140 (HPCS Pump Base Mat)." (26 page(s), 2/19/1986)
- ML20210T567 - Confirms 860205 plans to meet at Perry,OH on 860211 to review 860131 earthquake & operational readiness to load fuel at Unit 1.Draft response to congressional questions re earthquake in vicinity of plant encl. (10 page(s), 2/5/1986)
- ML20195C894 - Rev 2 to "Triaxial Response Spectrum Recorder Channel Calibr for D51-R170 (Reactor Recirculation Piping Support)." (75 page(s), 2/18/1986)
- ML20210T621 - Documents util response to 860131 & 0204 Confirmatory Action Ltrs CAL-RIII-86-01 & CAL-RIII-86-01A,respectively,re 860131 event occurring near plant.Commitments noted in confirmatory action ltrs satisfied. (5 page(s), 2/12/1986)
- ML20210T607 - Condition Rept Event Investigation CR-86-0106 on 860131-0214.Major areas investigated:potential damage to Rosemount differential pressure transmitters,installation of level transmitters & calibr procedure or technique. (28 page(s), 2/20/1986)