NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 1 to "Main Steam Tunnel Flooding Analysis," as addl info in response to SER Confirmatory Issue 28.Revised analysis includes feedwater crosstie isolation valve installed subsequent to 850524 ltr.

Accession Number: ML20154N219

Date Released: Tuesday, June 16, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer