NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 3 to SERI-M-189.1, "Pump & Valve Inservice Testing Program,Safety-Related." Changes incorporated into Rev 3 include mods performed at refueling Outage 2 to standby liquid control sys.

Accession Number: ML20154L763

Date Released: Tuesday, June 16, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer