Shearon Harris Nuclear Power Plant, Unit 1 - Submittal of Updated Final Safety Analysis Report (Amendment 63), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes
Accession Number: ML20147A016
Date Released: Tuesday, October 27, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20136A163 - Shearon Harris Nuclear Power Plant, Unit 1 - Submittal of Updated Final Safety Analysis Report (Amendment 63), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes (125 page(s), 5/15/2020)
- ML20147A017 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Cover Sheet. (1 page(s), 5/15/2020)
- ML20147A018 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (146 page(s), 5/15/2020)
- ML20147A019 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 2, Site Characteristics. [Redacted]. (1201 page(s), 5/15/2020)
- ML20147A020 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 3, Conformance with NRC General Design Criteria. [Redacted]. (1162 page(s), 5/15/2020)
- ML20147A021 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 4, Reactor. (189 page(s), 5/15/2020)
- ML20147A022 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (190 page(s), 5/15/2020)
- ML20147A023 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features. [Redacted]. (739 page(s), 5/15/2020)
- ML20147A024 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (324 page(s), 5/15/2020)
- ML20147A025 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 8, Electric Power. (166 page(s), 5/15/2020)
- ML20147A026 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 9, New and Spent Storage and Handing [Redacted]. (470 page(s), 5/15/2020)
- ML20147A027 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 10, Summary Description. (186 page(s), 5/15/2020)
- ML20147A028 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (160 page(s), 5/15/2020)
- ML20147A029 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 12, Radiation Protection [Redacted]. (198 page(s), 5/15/2020)
- ML20147A030 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 13, Conduct of Operations. (40 page(s), 5/15/2020)
- ML20147A031 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Chapter 14, Initial Test Program (126 page(s), 5/15/2020)
- ML20147A032 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Update Final Safety Analysis Report, Chapter 15, Accident Analysis (485 page(s), 5/15/2020)
- ML20147A033 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical Specification (13 page(s), 5/15/2020)
- ML20147A034 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Update Final Safety Analysis Report, Chapter 17, Quality Assurance during Design and Construction (4 page(s), 5/15/2020)
- ML20147A035 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Update Final Safety Analysis Report, Chapter 18, Final Safety Analysis Supplement For License Renewal (39 page(s), 5/15/2020)
- ML20147A036 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Appendices (70 page(s), 5/15/2020)
- ML20147A037 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, Figures Flagged for Redaction (6 page(s), 5/15/2020)
- ML20147A038 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Final Safety Analysis Report, List of Effective Pages (86 page(s), 5/15/2020)
- ML20147A039 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Updated Final Safety Analysis Report, Information Removed from Amendment (4 page(s), 5/15/2020)
- ML20147A040 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 [Redacted] (262 page(s), 5/15/2020)
- ML20147A041 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Updated Final Safety Analysis Report, Documents Incorporated By Reference Updated Since Amendment No. 62. (2 page(s), 5/15/2020)
- ML20147A042 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Updated Final Safety Analysis Report, Drawings [Redacted] Part 1 of 2 (24 page(s), 5/15/2020)
- ML20147A043 - Shearon Harris Nuclear Plant, Unit 1, Amendment 63 to Updated Final Safety Analysis Report, Drawings [Redacted] Part 2 of 2 (18 page(s), 5/15/2020)