Home > NRC Library > ADAMS Public Documents
South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20.
Accession Number: ML20133J932
Date Released: Monday, March 15, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20133J933 - South Texas Project Units 1 and 2 - Submittal of Updated Final Safety Analysis Report, Revision 20. (11 page(s), 4/29/2020)
- ML20133J934 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20. (Part 1 of 5, Chapters 1-2) (Redacted). (1543 page(s), 4/29/2020)
- ML20133J935 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20. (Part 2 of 5, Chapters 3-4). (1374 page(s), 4/29/2020)
- ML20133J936 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20. (Part 3 of 5, Chapters 5-8) (Redacted). (1574 page(s), 4/29/2020)
- ML20133J937 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20. (Part 4 of 5, Chapters 9-19) (Redacted). (2011 page(s), 4/29/2020)
- ML20133J938 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20. (Part 5 of 5, Response to NRC Questions). (816 page(s), 4/29/2020)
- ML20133J939 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20, List of Effective Pages. (17 page(s), 4/29/2020)
- ML20133J940 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing List. (20 page(s), 4/29/2020)
- ML20133J941 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 1 of 4). (215 page(s), 4/29/2020)
- ML20133J942 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 2 of 4) (Redacted). (74 page(s), 4/29/2020)
- ML20133J943 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 3 of 4). (28 page(s), 4/29/2020)
- ML20133J944 - South Texas Project Units 1 and 2 - Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 4 of 4) (Redacted). (174 page(s), 4/29/2020)