Home > NRC Library > ADAMS Public Documents
Responds to 850306 FOIA request re IE Repts 50-445/84-32 & 50-446/84-11.App A documents available in PDR.App B documents withheld (ref FOIA Exemption 5).Denial may be appealed within 30 days of ltr receipt.
Accession Number: ML20133J009
Date Released: Friday, October 2, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20133J006 - Responds to 850306 FOIA request re IE Repts 50-445/84-32 & 50-446/84-11.App A documents available in PDR.App B documents withheld (ref FOIA Exemption 5).Denial may be appealed within 30 days of ltr receipt. (9 page(s), 6/27/1985)
- ML20133J571 - Rev 6 to Procedure TNE-DC-8-1, "Design Verification of Field Design Changes." Related info encl. (30 page(s), 7/27/1984)
- ML20133J307 - Rev 5 to Procedure TNE-DC-7, "Preparation & Review of Design Drawings." (10 page(s), 6/21/1984)
- ML20133J549 - Rev 1 to Procedure TNE-DC-17, "Preparation & Review of Design Basis Documents." Related info encl. (103 page(s), 6/21/1984)
- ML20133J221 - Rev 0 to Procedure TNE-PR-2, "Release of Vendor Equipment." (14 page(s), 2/9/1984)
- ML20262E330 - "Oil Spillage Protection Sys Tank - Vertical." (1 page(s), 1/14/1984)
- ML20133J286 - Rev 3 to Procedure TNE-DC-11, "Preparation & Review of Design Engineering Packages." (11 page(s), 5/29/1984)
- ML20133J088 - Rev 0 to Procedure CEP-1, "Engineering & Administrative Svcs Organization & Responsibilities." Related info encl. (48 page(s), 9/8/1982)
- ML20133J201 - Rev 1 to Procedure TNE-DC-5-1, "Completion of Vendor Document Review." (21 page(s), 1/20/1984)
- ML20133J267 - Rev 3 to Procedure TNE-DC-12, "Preparation of Engineering Change Notices." Related info encl. (21 page(s), 5/29/1984)
- ML20133J070 - Rev 3 to Procedure CP-EP-4.0, "Design Control." First & Second Quarter 1982 audit schedule,Performance Evaluation Summary S-82-11 & Quarterly Progress Rept 2 encl. (9 page(s), 6/11/1982)
- ML20133J211 - Rev 1 to Procedure TNE-DC-10, "Design Verification of Computer Programs." (8 page(s), 2/9/1984)
- ML20133J294 - Rev 10 to Procedure DQP-CS-4, "Procedure to Establish & Apply Sys of Preaward Evaluations,Audits & Surveillance." (8 page(s), 6/4/1984)
- ML20133J262 - Rev 2 to Procedure CP-EP-4.7, "Control of Engineering/ Design Review of Field Design Changes." (5 page(s), 4/16/1984)
- ML20133J119 - Rev 2 to Procedure CEP-4, "Engineering Svcs Organization & Responsibilities." Related info & one oversize drawing encl. Aperture card available in PDR. (19 page(s), 4/25/1983)
- ML20133J598 - Rev 6 to Procedure TNE-AD-4, "Control of Engineering Documents." Jul 1984 QA rept encl. (15 page(s), 8/10/1984)
- ML20133J151 - Rev 0 to Nuclear Operations Engineering Manual Procedure NOE-205, "Licensing." Related info encl. (108 page(s), 9/1/1983)
- ML20133J171 - Rev 2 to Nuclear Operations Support Manual Procedure NOS-103, "Review & Assessment of Industry Operating Experiences." Related info encl. (22 page(s), 12/12/1983)
- ML20133J060 - Rev 1 to Procedure CP-EP-4.5, "Design Verification." Related info encl. (8 page(s), 2/18/1980)
- ML20133J252 - Rev 7 to Procedure DOI-CS-4.6, "Conduct of Internal,Prime & Subcontractor Audits." (22 page(s), 4/13/1984)
- ML20133J582 - Rev 0 to Procedure TNE-DC-21, "Preparation & Review of Field Design Changes." Related info encl. (33 page(s), 8/6/1984)
- ML20133J232 - Rev 4 to Procedure TNE-DC-8, "Design Verification of Engineering Documents." (8 page(s), 4/6/1984)
- ML20133J611 - Audit on 840820-24 of QA activities,including program established/implemented for site review & processing of CMCs,DCAs,S-0910 packages & associated calculations.Related info encl. (66 page(s), 8/17/1984)
- ML20133J189 - Rev 2 to Procedure TNE-DC-1, "Design Control General Requirements." (8 page(s), 1/20/1984)
- ML20133J340 - Rev 3 to Procedure TNE-DC-5, "Vendor Document Review." (7 page(s), 6/21/1984)