Further response to FOIA request for records re Ford Amend Study.Records in App K available in PDR.Review for addl records continuing.
Accession Number: ML20132B505
Date Released: Wednesday, May 27, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20134A894 - Further response to FOIA request for records re Ford Amend Study.Records in App K available in PDR.Review for addl records continuing. (12 page(s), 6/10/1985)
- ML20134A940 - Rev 4 to Procedure CC-ME-01-MH, "Classification Criteria of Structures,Sys & Components." W/one oversize encl.Aperture card available in PDR. (91 page(s), 4/30/1980)
- ML20132B595 - Forwards working file on administration of Task 2 under Parameter,Inc contract for consulting support re structural concrete deficiencies at facility.W/o encl. (3 page(s), 11/20/1980)
- ML20134B461 - Trip rept of 820830-31 visit to Bechtel,Norwalk,CA to observe Region IV insp concerning effectiveness of util/ Bechtel processing of field change notices for facility const.Supporting documentation encl. (24 page(s), 9/16/1982)
- ML20134B080 - "Special Mgt Rept:Marble Hill Nuclear Project." (13 page(s), 1/31/1982)
- ML20132B590 - Forwards working file on EDO 09045 re T Dattilo request under 10CFR2.206. (1 page(s), 11/20/1980)
- ML20134B445 - Forwards documents listed on Encl A re facilities. (6 page(s), 4/8/1975)
- ML20132C860 - Forwards Cycle 2 systematic assessment of licensee performance info requested in 810604 memo. (3 page(s), 9/4/1981)
- ML20134B372 - Discusses 720306 meeting w/util re compliance insp program & QA program for activities to be conducted under proposed application.QA manual requested.Draft marked-up insp rept encl. (6 page(s), 4/4/1972)
- ML20134B339 - Confirms 740828 meetings w/NRC in Bethesda,MD to discuss util intent to use Byron/Braidwood design as base plant for replication at proposed Marble Hill facility. (2 page(s), 8/22/1974)
- ML20134B058 - Forwards SALP reviews for facilities. (2 page(s), 5/1/1981)
- ML20132C068 - Forwards project manager inputs required for SALP for listed plants.W/o encl. (1 page(s), 5/1/1981)
- ML20134B243 - Confirmatory action ltr re problems identified during 830124-28 special insp concerning safety-related electrical work at facilities.Discussions lack continuation of stop work order encompass electrical auxiliary steel. (22 page(s), 2/2/1983)
- ML20134B432 - Summary of 740405 meeting w/applicant in Bethesda,MD re design of reactor cavity for facilities.List of attendees encl. (17 page(s), 4/9/1974)
- ML20134B208 - Rev 0 to Project Mgt Manual Procedure PMP 16-2, "Quality Trending." W/821122 ltr. (14 page(s), 10/22/1982)
- ML20134B226 - "QA Case Study Rept." (41 page(s), 12/17/1982)
- ML20132B776 - Summary of 810108 meeting w/util in Bethesda,MD to discuss results of insp & addl testing re cadweld splices.Supporting documentation encl. (5 page(s), 2/9/1981)
- ML20134B160 - Notice of issuance of CPPR-170 & CPPR-171 to applicant for const of two PWRs. (3 page(s), 4/4/1978)
- ML20132B496 - Forwards evaluation of generic key indicators for project engineering/design activities at facilities. (38 page(s), 2/11/1983)
- ML20134B406 - Summary of 740117 meeting w/applicant in Chevy Chase,MD re remaining areas of concern on mechanical design of facilities. (5 page(s), 1/29/1974)
- ML20134A968 - Forwards SALP repts for Apr 1979 - Aug 1980. (1 page(s), 1/9/1981)
- ML20134F700 - CPPR-170 & CPPR-171,authorizing const of two PWRs. (28 page(s), 4/4/1978)
- ML20134A999 - Notice of significant licensee meeting on 801020 in Atlanta,GA to discuss results of SALP & to enhance communications in areas re safe reactor operation & const. (1 page(s), 10/15/1980)
- ML20134B175 - SALP Repts 50-546/82-07 & 50-547/82-07 for Jul 1980 - Sept 1981. (5 page(s), 6/30/1982)
- ML20134B187 - "Special Study of Nuclear QA (Long-Term Review)." (5 page(s), 11/16/1982)
- ML20134B358 - Forwards CO Rept 72-1 covering initial compliance & introductory QA meetings w/mgt.W/o encl. (1 page(s), 4/4/1972)
- ML20134B096 - "Congressional Briefing for Marble Hill Nuclear Generating Station." (12 page(s), 2/25/1982)
- ML20132C652 - Responds to encl 810522 ltr re constituent MH Schwartz 810421 ltr on resumption of concrete work at site. (8 page(s), 6/25/1981)
- ML20132C164 - Discusses qualification review of plants for replication per 741119 request.Plant design acceptable for replication. (5 page(s), 11/3/1975)
- ML20134B259 - Press release 83-51 re opportunity for hearing on consideration of application for OLs. (4 page(s), 3/25/1983)
- ML20132C867 - Forwards Cycle 2 systematic assessment of licensee performance info for Jul 1980-Jun 1981 for facility. (5 page(s), 9/4/1981)
- ML20134B110 - "Congressional Briefing for Marble Hill Nuclear Generating Station." (9 page(s), 2/25/1983)
- ML20134B019 - Advises of SALP Board decision not to rate performance of licensee due to shutdown under IE order for 10.5 months during evaluation period.Mgt meeting held onsite on 801209. SALP evaluation & plan of action encl.W/o encls. (1 page(s), 1/20/1981)
- ML20134B308 - Suppls 740822 ltr re intent to use Byron-Braidwood design as base plant for replication at proposed Marble Hill facility. Units will be replicated.PSAR application will reflect position. (1 page(s), 11/19/1974)
- ML20134B385 - Discusses Rept 50/72-1 re 720306 initial mgt meeting.QA manual requested from util.Plant layout will be performed by SSI & Bechtel. (1 page(s), 3/22/1972)
- ML20134B149 - Forwards CPPR-170,CPPR-171 & FR notice of issuance of CPs. (5 page(s), 4/4/1978)
- ML20134A966 - Forwards PN-III-75-27,identifying several QA deviations which led to conclusion & recommendation to reject util application. (1 page(s), 8/12/1975)
- ML20134A915 - Draft "QA Case Study Working Paper Case B - Part I." (80 page(s), 5/25/1983)
- ML20134A982 - SALP repts for Apr 1979 - Aug 1980. (17 page(s), 1/8/1981)
- ML20132C657 - Forwards constituent MH Schwartz 810421 ltr re resumption of concrete work at site. (6 page(s), 5/22/1981)
- ML20132B783 - Slide presentation re cadweld splices insp & addl testing. (47 page(s), 2/9/1981)