Home > NRC Library > ADAMS Public Documents
Forwards NRC testimony for 810707 evidentiary hearing.
Accession Number: ML20126L803
Date Released: Tuesday, May 19, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20126L799 - Forwards NRC testimony for 810707 evidentiary hearing. (1 page(s), 6/8/1981)
- ML20126L806 - Testimony of EJ Gallagher that QA deficiencies re soil const activities under & around safety-related structures & sys arising from improper implementation of QA program provide adequate basis to modify CPs by suspending those activities. (37 page(s), 6/8/1981)
- ML20126L819 - "Review of US Testing Field & Lab Const Test Data on Soils Used as Fill." (22 page(s), 7/31/1979)
- ML20126L822 - Notice of violation from insp on 781211-790125.Noncompliance noted determined to be matl false statement. (3 page(s), 12/9/1979)
- ML20126L828 - Testimony of JG Keppler on investigation findings that implementation of QA/QC program for assuring proper soil foundation for site was ineffective. (5 page(s), 6/8/1981)
- ML20126L834 - Testimony of JW Gilray that deficiencies occurring in soils const were caused by lack of QA controls in program procedures,design,installation,surveillance,insp,tests, verifications & audits.Prof qualifications encl. (6 page(s), 6/8/1981)
- ML20126L838 - Testimony of JD Kane that inadequate compaction & failure to attain min compaction criteria designated are major reasons for facility settlement problem.Prof qualifications encl. (8 page(s), 6/8/1981)
- ML20126L843 - Testimony of DS Hood that if NRC had known how util was to implement QA program,NRC would have been warranted in not issuing CPs for original application. (6 page(s), 6/8/1981)
- ML20126L848 - Testimony of JG Keppler re QA implementation for soils work & remedial measures after 791206.QA program now satisfies NRC criteria.Prof qualifications encl. (22 page(s), 6/8/1981)
- ML20126L854 - Testimony of DS Hood,JK Kimball & E Gallagher on Stamiris Contention 1.Matl false statements were not intentional. Prof qualifications encl. (46 page(s), 6/8/1981)
- ML20126L859 - Requests that items of noncompliance re diesel generator bldg settlement be given technical & legal review & determination made on materiality of FSAR discrepancies. (14 page(s), 4/3/1979)
- ML20126L864 - Forwards summary of Ofc of Nuclear Reactor Regulation comments on Keppler 790403 memo re backfill deficiency. (4 page(s), 8/9/1979)
- ML20126L873 - Testimony of D Hood,J Kane,F Rinaldi & E Gallagher re Stamiris Contention 2.Prof qualifications encl. (50 page(s), 6/8/1981)
- ML20126L879 - Testimony of EJ Gallagher re Stamiris Contention 3. Managerial attitude is consistent w/QA regulations implementation on soil settlement problems.Prof qualifications encl. (7 page(s), 6/8/1981)
- ML20126L885 - Testimony of DS Hood re ASLB question on continued const.NRC does not object to proceeding w/surcharging valve pits adjacent to borated water tanks if acceptable program worked out.Prof qualifications & Certificate of Svc encl. (8 page(s), 6/8/1981)
- ML20126L887 - Stipulation that util will not contest NRC conclusions that certain events constituted breakdown in QA re soils placement.QA program satisfies all NRC criteria.Certificate of Svc encl. (4 page(s), 6/5/1981)