Forwards 790712 decision constituting revised director's decision under 10CFR2.206 denying intervenors Mid-American Coalition for Energy Alternatives & Critical Mass Energy Project requests for suspension or revocation of CP.
Accession Number: ML20126A095
Date Released: Tuesday, May 19, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20126A093 - Forwards 790712 decision constituting revised director's decision under 10CFR2.206 denying intervenors Mid-American Coalition for Energy Alternatives & Critical Mass Energy Project requests for suspension or revocation of CP. (7 page(s), 1/31/1980)
- ML20126A097 - Revised director's decision under 10CFR2.206,denying intervenor Mid-America Coalition for Energy Alternatives 790111 & 0629 & intervenor Critical Mass Energy Project 781227 requests for suspension or revocation of CP. (11 page(s), 1/31/1980)
- ML20126A120 - Discusses 781218 meeting & 781219 telcon re safety-related concrete placement,consolidation,testing & insp at facility site.Outlines actions taken to correct deficiencies.Requests plan confirmation. (2 page(s), 12/19/1978)
- ML20126A148 - Responds to 781219 ltr re steps to correct violations noted in IE Insp Rept 50-482/79-030.Placement of safety-related concrete in structures other than containment bldg may continue. (2 page(s), 3/5/1979)
- ML20126A167 - "Summary of Concrete Problems." (3 page(s), 3/5/1979)
- ML20126A205 - Forwards 790702, "Petrographic Rept Project Examination of Concrete Samples from Facility Containment Bldg Base Mat, KS." (1 page(s), 7/5/1979)
- ML20126A208 - "Petrographic Rept,Project Examination of Concrete Samples from Facility Containment Bldg Base Mat,KS." (7 page(s), 7/2/1979)
- ML20126A242 - Discusses evaluation of facility reactor bldg base mat. Base mat concrete strength has not retrogressed & meets PSAR design criteria.Forwards "Evaluation Rept re Concrete Strength of Reactor Bldg Base Mat at Facility." (2 page(s), 7/10/1979)
- ML20126A256 - "Evaluation Rept re Concrete Strength of Reactor Bldg Base Mat at Facility." (5 page(s), 7/10/1979)
- ML20126A267 - Forwards Geosciences Branch response to WH Ward petition requesting partial suspension of facility CP.Petition should be denied.Safe shutdown earthquake of 0.12 gravity is adequately conservative. (7 page(s), 1/4/1980)