Home > NRC Library > ADAMS Public Documents
Forwards procedures in response to 841128 request for addl info,including Rev 0 to Spec S0123-701-01, "Engineering Design & Contractor Interface Requirements."
Accession Number: ML20112G493
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20112G488 - Forwards procedures in response to 841128 request for addl info,including Rev 0 to Spec S0123-701-01, "Engineering Design & Contractor Interface Requirements." (2 page(s), 3/13/1985)
- ML20112G505 - Rev 0 to "Engineering Design & Contractor Interface Requirements." (34 page(s), 2/21/1985)
- ML20112G511 - Rev 0 to "Interface Procedure for Engineering Svcs Contractors Preparing Design Change Packages,Proposed Facility Change Packages or Other Studies Analyses for San Onofre Nuclear Generating Station Units 1,2 & 3." (8 page(s), 2/25/1985)
- ML20112G522 - Rev 6 to "Review & Approval of Contractor,Engineering- Const & Supplier Documents for Matl,Equipment & Svcs Purchased by Southern California Edison for San Onofre Nuclear Generating Stations Units 1,2 & 3." (8 page(s), 1/22/1985)