Home > NRC Library > ADAMS Public Documents
Forwards amends 156 & 140 to licenses NPF-10 & NPF-15 for Units 2 & 3,consisting of PCN-454.Change revises acceptance criteria for Agastat time delay relays used in ESF load sequencer in SR 3.8.1.18, "A.C. Sources - Operating."
Accession Number: ML20112D021
Date Released: Tuesday, May 5, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20112D020 - Forwards amends 156 & 140 to licenses NPF-10 & NPF-15 for Units 2 & 3,consisting of PCN-454.Change revises acceptance criteria for Agastat time delay relays used in ESF load sequencer in SR 3.8.1.18, "A.C. Sources - Operating." (2 page(s), 5/29/1996)
- ML20112D023 - Application for amends to licenses NPF-10 & NPF-15, consisting of PCN-454,revising acceptance criteria for Agastat time delay relays used in ESF load sequencer in TS 3.8.1.18, "A.C. Sources - Operating." (15 page(s), 5/29/1996)
- ML20112D035 - Approved tech specs,amends 127 & 116 & proposed TS for Units 2 & 3. (15 page(s), 5/29/1996)
- ML20112D038 - "Sys Dynamic Voltages During Design Basis Accident." (454 page(s), 10/27/1994)
- ML20112D041 - "Containment Spray (CS) & Emergency Cooling Unit (ECU) Actuation Times." (125 page(s), 9/26/1995)
- ML20112D049 - "Containment P/T Analysis for Design Basis LOCA - Suppl A." (320 page(s), 2/17/1995)
- ML20112D052 - "Containment P/T Analysis for Design Basis MSLB - Suppl B." (249 page(s), 3/22/1995)