Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for nine categories of documents. Forwards App A documents.Documents available in PDR.
Accession Number: ML20102A028
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20102A026 - Responds to FOIA request for nine categories of documents. Forwards App A documents.Documents available in PDR. (2 page(s), 8/10/1984)
- ML20102A230 - Amend 19 to License DPR-18,changing Tech Specs to support Cycle 8 operation w/Exxon Nuclear Co reload fuel. (7 page(s), 5/1/1978)
- ML20102A306 - Notice of issuance & availability of Amend 47 to License DPR-40. (2 page(s), 4/1/1980)
- ML20102A198 - Safety evaluation supporting Amend 18 to License DPR-58. (63 page(s), 2/16/1977)
- ML20102A207 - Notice of issuance & availability of Amend 18 to License DPR-58. (3 page(s), 2/16/1977)
- ML20102A063 - Amend 21 to License DPR-20,revising Tech Specs re replacement of fuel assemblies in core w/fuel assemblies of different design. (27 page(s), 4/29/1976)
- ML20102A267 - Safety evaluation supporting Amend 19 to License DPR-18. (10 page(s), 5/1/1978)
- ML20102A162 - Notice of issuance & availability of Amend 25 to License DPR-23. (2 page(s), 12/3/1976)
- ML20102A214 - Summary of ACRS 201st meetings on 770106-08 re proposal to replace 65 original Westinghouse fuel assemblies w/Exxon Nuclear Co assemblies during first refueling. (5 page(s), 1/14/1977)
- ML20102A050 - Forwards Amend 21 to License DPR-20 & safety evaluation. Amend revises Tech Specs re replacement of fuel assemblies in core w/fuel assemblies of different design. (3 page(s), 4/29/1976)
- ML20102A190 - Amend 18 to License DPR-58,changing Tech Specs re reactor power levels not exceeding 3250 Mwt for core Cycle 2 w/Exxon Nuclear Co reload fuel assemblies. (45 page(s), 2/16/1977)
- ML20102A175 - Forwards Amend 18 to License DPR-58,safety evaluation & notice of issuance & availability.Amend changes Tech Specs re reactor power levels not exceeding 3250 MWt for core Cycle 2 w/Exxon Nuclear Co reload fuel assemblies. (3 page(s), 2/16/1977)
- ML20102A088 - Forwards Amend 25 to License DPR-23,safety evaluation & notice of issuance & availability.Amend changes Tech Specs by revising limit on total nuclear peaking factor. (3 page(s), 12/3/1976)
- ML20102A070 - Safety evaluation supporting Amend 21 to License DPR-20. (51 page(s), 4/29/1976)
- ML20102A221 - Forwards Amend 19 to License DPR-18 & safety evaluation. Amend changes Tech Specs to support Cycle 8 operation w/Exxon Nuclear Co reload fuel. (3 page(s), 5/1/1978)
- ML20102A151 - Safety evaluation supporting Amend 25 to License DPR-23. (7 page(s), 12/3/1976)
- ML20102A301 - Safety evaluation supporting Amend 47 to License DPR-40. (28 page(s), 4/1/1980)
- ML20102A287 - Amend 47 to License DPR-40,revising Tech Specs to be consistent w/Cycle 6 reload analysis & for RCS heatup & cooldown. (50 page(s), 4/1/1980)
- ML20102A133 - Amend 25 to License DPR-23,changing Tech Specs by revising limit on total nuclear peaking factor. (4 page(s), 12/3/1976)
- ML20102A281 - Forwards Amend 47 to License DPR-40,safety evaluation & notice of issuance & availability.Amend revises Tech Specs to be consistent w/Cycle 6 reload analysis & for RCS heatup & cooldown. (2 page(s), 4/1/1980)