Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for four categories of documents re GESSAR-II.App A documents encl & available in PDR.App B documents being reviewed by GE for proprietary info.
Accession Number: ML20101E143
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20101E134 - Further response to FOIA request for four categories of documents re GESSAR-II.App A documents encl & available in PDR.App B documents being reviewed by GE for proprietary info. (4 page(s), 7/10/1984)
- ML20105B578 - Comments on Jan 1983 status rept on review of standardized plants,in response to 830117 memo. (3 page(s), 1/31/1983)
- ML20105C123 - Forwards ltr rept, "Review & Evaluation of GESSAR-II Probabilistic Risk Assessment - Containment Failure Modes & Fission Product Release." Comments requested by 830901. (1 page(s), 8/8/1983)
- ML20101E183 - Notification of 840320 meeting w/GE in Bethesda,MD to discuss GESSAR-II source term reanalysis. (7 page(s), 3/15/1984)
- ML20101E189 - Slide presentation entitled, "GESSAR Source Term Analysis," presented at 840222 meeting in Bethesda,MD. (4 page(s), 2/22/1984)
- ML20101E159 - Forwards "Guidance for GESSAR Seismic PRA." NRC will continue to work w/GE on PRA.Quantification of uncertainty should be carried through analylis.Support would be ppreciated. (4 page(s), 5/18/1983)
- ML20105B313 - Discusses treatment of external events for GESSAR probabilistic risk assessment based on 820616 meeting w/BNL & GE.Questions whether GE should be redirected on issue. (1 page(s), 6/21/1982)
- ML20101E208 - Slide presentation entitled, "GESSAR PRA Review," presented at 831205 meeting in Bethesda,MD. (12 page(s), 10/25/1983)
- ML20101E162 - Slide presentation on 830520 re geotechnical engineering guidelines,based on guidelines in NUREG-2300. (7 page(s), 5/20/1983)
- ML20105B347 - Comments on treatment of external events for facility probabilistic risk assessment (PRA).External events should be included in std plant PRAS. (1 page(s), 7/8/1982)
- ML20101E196 - Slide presentation entitled, "GESSAR Source Term Analysis," presented at 840209 meeting in Bethesda,MD. (5 page(s), 2/9/1984)