NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Technical Evaluation Rept on Seven Main Transformer Failures at North Anna Power Station,Units 1 & 2," completing review of main transformer failures which occurred between 801129-821205.Conclusions summarized.

Accession Number: ML20100F862

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer