Home > NRC Library > ADAMS Public Documents
Forwards faxes received from GE for advanced BWR PRA.
Accession Number: ML20099A263
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20099A260 - Forwards faxes received from GE for advanced BWR PRA. (1 page(s), 7/1/1992)
- ML20099A273 - Forwards new Sections 19.11 through 19.13 of advanced BWR PRA re human action overview,PRA input to reliability assurance problem & summary of insights gained from PRA. (8 page(s), 6/29/1992)
- ML20099A280 - Forwards discussion of draft SER Open Item 21 re design & reliability assumptions & insights related to sys outside advanced BWR design certification. (7 page(s), 6/27/1992)
- ML20099A287 - Forwards PRA input to ITAAC Section 19.8 re tier 1 treatment of design features identified as important by PRA. (11 page(s), 6/30/1992)
- ML20099A299 - Forwards info on Section 19.9 re COL license info,including specific procedure for unisolated RWCU line break, confirmation of RWCU operation beyond design basis & event-specific procedures for severe external flooding. (11 page(s), 6/30/1992)
- ML20099A308 - Forwards new PRA Section 19.7 re PRA as design tool,updating 920407 fax. (10 page(s), 6/25/1992)
- ML20099A316 - Forwards info on mod to advanced BWR Paragraph 2.2.2 re consequence analysis/site acceptability. (2 page(s), 6/29/1992)
- ML20099A319 - Forwards updated advanced BWR PRA consequence analysis, covering consequence analysis results & addl results. (8 page(s), 6/30/1992)