Home > NRC Library > ADAMS Public Documents
Final response to FOIA request for documents.Forwards App N & O documents.Apps M & N available in PDR.App O documents partially withheld (ref FOIA Exemptions 5,6 & 7).App P withheld (ref FOIA Exemption 7).
Accession Number: ML20097F079
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20244A716 - Final response to FOIA request for documents.Forwards App N & O documents.Apps M & N available in PDR.App O documents partially withheld (ref FOIA Exemptions 5,6 & 7).App P withheld (ref FOIA Exemption 7). (10 page(s), 6/7/1989)
- ML20244A927 - Forwards documents introduced by Davidson during 840921 in camera hearing re facility.Subj documents also submitted per Board direction for inclusion in hearing transcript. (4 page(s), 10/10/1984)
- ML20244A943 - Rev 5 to Comanche Peak Steam Electric Station Startup Administrative Procedure CP-SAP-8, "Review,Approval & Rev of Test Instructions/Procedures." (21 page(s), 1/4/1983)
- ML20244A750 - Transcript of M Gregory 840717 in camera discovery deposition in Glen Rose,TX.Pp 1-201.Supporting documents encl. (233 page(s), 7/17/1984)
- ML20244A808 - Partially withheld transcript of 840720 in camera deposition of LD Howard in Glen Rose,TX.Pp 56,500-56,509. (12 page(s), 7/20/1984)
- ML20260B520 - "7.5 KVA FIXED FREQUENCY INVERTER OUTLINE & EXTERNAL CONNECTIONS." Sheet 1.No drawing date. (1 page(s), 6/7/1989)
- ML20244A862 - Partially withheld transcript of WI Vogelsand 840802 deposition in Glen Rose,TX,Vol I.Pp 77,000-77,203/299. Supporting documentation encl. (236 page(s), 8/2/1984)
- ML20244A872 - Partially withheld transcript of RE Camp 840803 in camera deposition in Glen Rose,TX,Vol II.Pp 76,212-76,258. (49 page(s), 8/3/1984)
- ML20244A829 - Partially withheld transcript of 840720 in camera discovery deposition in Glen Rose,TX.Pp 339-564. (288 page(s), 7/20/1984)
- ML20244A811 - Partially withheld transcript of LD Howard 840720 in camera deposition.Pp 1-23. (25 page(s), 7/20/1984)
- ML20244A874 - Partially withheld transcript of WI Vogelsand 840803 deposition in Glen Rose,TX,Vol II.Pp 77,300-77,387. (102 page(s), 8/3/1984)
- ML20244A837 - Partially withheld transcript of FL Powers 840801 in camera deposition in Glen Rose,TX.Pp 75,500-75,643.Supporting documentation encl. (170 page(s), 8/1/1984)
- ML20244A887 - Partially withheld transcript of KL Luken 840803 deposition in Glen Rose,TX.Pp 78,500-78,539. (47 page(s), 8/3/1984)
- ML20244A792 - Partially withheld transcript of 840719 in camera discovery deposition in Glen Rose,TX.Pp 1-99. (107 page(s), 7/19/1984)
- ML20244A771 - Transcript of 840731 in camera telcon deposition in Glen Rose,IL.Pp 38,655-38,689.Supporting documentation encl. (45 page(s), 7/31/1984)
- ML20260B515 - "7.5 KVA 118 VAC 10 60 HZ FIXED FREQUENCY INVERTOR." Sheet 4.Rev date illegible. (1 page(s), 6/7/1989)
- ML20244A780 - Partially withheld transcript of 840718 telcon in Glen Rose, TX.Pp 38,543-38,566. (26 page(s), 7/18/1984)
- ML20097F076 - Transcript of 840909 in camera session in Fort Worth,TX. Pp 14,403-14,771. (370 page(s), 9/9/1984)
- ML20260B511 - "ANNUNCIATOR LAMP CABINET 1-ALB-10B SCHEMATIC DIAGRAM SH 3." ACTUAL REV STATUS:CP-2. (1 page(s), 6/13/1984)
- ML20244A847 - Partially withheld transcript of RE Camp 840802 in camera deposition in Glen Rose,TX,Vol I.Pp 76,000-76,211.Supporting documentation encl. (258 page(s), 8/2/1984)
- ML20244A758 - Transcript of M Gregory 840717 in camera deposition in Glen Rose,TX.Pp 54,500-54,559. (62 page(s), 7/17/1984)
- ML20244A901 - Partially withheld Rev 0 to Comanche Peak Steam Electric Station Preoperational Test Procedure 1CP-PT-02-02, "118 VAC Reactor Pressure Sys Inverters." (66 page(s), 11/16/1982)
- ML20244A817 - Partially withheld transcript of 840719 in camera discovery deposition in Glen Rose,TX.Pp 1-338. (438 page(s), 7/19/1984)
- ML20244A786 - Partially withheld transcript of 840718 in camera deposition in Glen Rose,TX.Pp 55,500-55,733. (274 page(s), 7/18/1984)
- ML20244A958 - Rev 5 to Comanche Peak Steam Electric Station Startup Administrative Procedure CP-SAP-11, "Review,Approval & Retention of Test Results." (9 page(s), 1/4/1983)
- ML20260B528 - "80 A 30 RECTIFIER." Sheet 3.No drawing date. (1 page(s), 6/7/1989)
- ML20260B524 - "7.5 KVA FF STATIC INVERTER SYSTEM BLOCK DIAGRAM OPERATING INSTRUCTIONS." Sheet 2.No drawing date. (1 page(s), 6/7/1989)
- ML20244A804 - Partially withheld transcript of 840720 in camera discovery deposition in Glen Rose,TX.Pp 100-130. (33 page(s), 7/20/1984)
- ML20244B009 - Partially deleted transcript of 840921 hearing in Fort Worth,TX.Pp 18,159-18,504.Supporting documentation encl. W/five oversize drawings. (288 page(s), 9/21/1984)